ML20195F756
| ML20195F756 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/10/1999 |
| From: | Tapia J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20195F760 | List: |
| References | |
| 50-498-99-11, 50-499-99-11, NUDOCS 9906150087 | |
| Download: ML20195F756 (5) | |
See also: IR 05000498/1999011
Text
M-'
4
. j ** "%g*t
t
UNITED STATES
NUCLEAR REGULATORY COMMISSION
3
- -
a
?,
.
Ta
1
- j.
REGION IV
[
611 RYAN PLAZA DRIVE, sulTE 400
l
y,,,
ARLINGTON, TEXAS 760118064
JUN I O 1999
William T. Cottle, President and
Chief Executive Officer
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT NO. 50-498/99-11; 50-499/99-11
Dear Mr. Cottle:
This refers to the inspection conducted on April 4 through May 15,1999, at the South Texas
Project Electric Generating Station, Units 1 and 2, facility. The enclosed report presents the
results of this inspection.
. During the 6-week period covered by this inspection, your conduct of activities at the South
,
Texas Project facility was generally characterized by safety-conscious operations, sound
angineering and maintenance practices, and careful radiological work controls,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sin
,
,
l
Y
'
!
o ph I. Tapia, Chief
l
Pro ect Branch A
l
Division of Reactor Projects
!
Docket Nos.: 50-496
3
50-499
License Nos.: NPF-76
f
L
Enclosure:
NRC Inspection Report No.
50-498/99-11;50-499/99-11
1
'O
9906150007 990610
ADOCK 05000498
G
g
'4
1
.
STP Nuclear Operating Company'
-2-
.
cc w/ enclosure:
T. H. Cloninger, Vice President..
Engineering & Technical Services
STP Nuclear Operating Company
' P.O. Box 289
. Wadsworth, Texas .77483
'
S. M.' Head, Supervisor, Licensing
- Quality & Licensing Department
STP Nuclear Operating Company
P.O. Box 289
'
Wadsworth, Texas 77483 '
A. Ramirez/C. M. Canady
City of Austin
.
'
Electric Utility Department
721 Barton Springs Road
'
Mr.' M. T. Hardt/Mr. W. C. Gunst
City Public Service Board
P.O. Box 1771
San Antonio, Texas 78296
D. G. Tees /R. L. Balcom
Houston Lighting & Power Company
P.O. Box 1700
He'iston, Texas 77251
Jon C. Wood
Matthews & Branscomb
. One Alamo Center
. 106 S. St. Mar;'s Street, Suite 700
i
San Antonio, Texas 78205-3692
Jack R. Newman, Esq.
1800 M. Street, N.W.
Washington, D.C. 20036-5869'
Mr. G. E. Vaughrt'Mr. C. A. Johnson
Central Power & Light Company
P.O. Box 289
l-
Mail Code: N5012
Wadsworth, Texas 77483
n-
- . . .
f
...
- STP Nuclear. Operating Company
.-3-
,
-INPO
Records Center -
l
~ 700 Galleria Parkway
Atlanta, Georgia 30339-5957
i
. Bureau of Radiation Control
- State of Texas -
1100. West 49th Street '
'
'Mr. ' Jim Calloway .-
Texas Public Utility Commission
~ William B. Travis Building -
1701 North Congress Avenue
P.O. Box 13326 -
a
)
John Howard, Director
Environ;nental and Natural Resources Policy -
Office of the Govemor .
P.O. Box 12428
Judge, Matagorda County
Matagorda County Courthouse
i
1700 Seventh Street
- Bay City,-Texas 77414
i
,i
j
i'l
I
- ) .
>
L-
.
.
p
I
i
U
.
~
JUN I 0 1999
STP Nuclear Operating Company
-4-
..
i
E Mail report to T. Frye (TJF)
1
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
l
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)-
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director .
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/A) -
RIV File
Project Engineer (DRP/A)
R. Bachmann, OGC (MS: 15-B-18)
Branch Chief (DRP/TSS)
.
DOCUMENT NAME: R:\\_STP\\ST911RP.NFO
To receive copy of document, Indicate in box: "C" - Copy without enclosures "E* = Copy with enclosures "N" =)de copy
RIV: SRI
RI
RI
RI
C:DFA^
7,
,.,
,
.
NFO'KeefebW
WCSifre@ k
GLGuerraVW JDHannavtb. JITapia\\W/d
_
066/99 f"T*"
068/99pe(W
06/8/99 prMM 06S/99 n,(kW 064@9 F F
.
OFFICIAL REC 6RD COPY
'
-
\\
j
j
p,
,
LQ
1^
.
.
l0.--
.
STP Nuclear Operating Company
-4-
,
,
'
E-Mail report to T. Frye (TJF)J
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS) ~
E Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
. E-Mail report to Frank Talbot (FXT) -
bec to DCD (IE01),
'bec distrib,' by RIV:
E Regional Administrator-
Resident inspector
,
DRP Director
DRS-PSB
DRS Director -
MIS System
'
Branch Chief (DRP/A)
RIV File
, Project Engineer (DRP/A)
R. Bachmann, OGC (MS: 15-B 18)
Branch Chief (DRP/TSS)
i
j
,
t1
DOCUM'ENT NAME: R:\\_STP\\ST911 RP.NFO
.
_
'
To receive copy of document, indicate in bon: *C" = Copy without' enclosures "E" = Copy with enclosures "N* =)eq copy
UlV: SRI -
,
RI.
RI
RI
C:D@A
.7
.
.
NFO'Keefe#W
WCSifreift k
GLGuerraM<(
JDHannat D. JITahiaW/d
t
066/99 ful8""
06/b/990*( M-
06/S!99 prMM 06/g/99 w h# 06099 F f
OFFICIAL RECCRD COPY
\\
'
WOO 12-
L
2