ML20055F583

From kanterella
Jump to navigation Jump to search
Advises That 900601 Rev 10 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20055F583
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/10/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hall D
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 9007180066
Download: ML20055F583 (3)


Text

-_

g, s  ;

t .  ;

JUL i 01990  !

In Reply Refer To: [

u Dockets: 50-498  :

[. 50-499  !

L p

.t Houston Lighting & Power Company -

ATTN: Donald P. Hall, Group l i Vice President, Nuclear P.O. Box 1700  !

Houston, Texas 77251 [

Gentlemen:

o This acknowledges the receipt of your letter dated June 1,1990, by which you ,

!: transmitted Revision 10 to the South Texas Project Safeguards Contingency Plan. l The regional security staff have reviewed your submittal and determined the I changes are consistent with the provisions of 10 CFR 50.54(p). The changes j contained in Revision 10 to your plan are administrative in nature and do not reduce the plan effectiveness. Accordingly, the changes are acceptable for inclusion into the plan.

t The-enclosures to your letter contain Safeguards Information of a type ,

specified in 10 CFR 73.21 and are being withheld from public disclosure. i Sincerely, Original Signed By:

Samuel J. Collins Samuel J. Collins, Director i Division of Reactor Projects cc:

Houston Lighting & Power Company

. ATTN: M. A. McBurnett, Manager i Operations Support Licensing P.O. Box 289 Wadswnrth, Texas 77483 l

City of Austin Electric Utility l ATTN: J. C. Lanier, Director of -l Generation 721 Barton Springs Road ,

Austin, Texas 78704  ;

1

  • RIV:SEPS D:DRSS D:/j@ AI 90-200 t ABEarnest/ch C:SEPSh DAPowers ABBeac - S & 1 lins

/ /90 7 /3 /90 1/6/90 7/9/90

  • Previously Concurred -

f.kk"$$ocko ,[G- '

F r

[c. . ,

1 1

l Houston Lighting & Power Company.  !

I I

1 City Public Service Board i L- ATTN: R. J. Costello/M. T. Hardt P.O. Box 1771 l San Antonio, Texas 78296 1

g Newman & Holtzinger, P. C. l ATTN: Jack R. Newman, Esq.

1615 L Street, NW- )

i Washington, D.C. 20036.

Central Power and Light Company ATTN: R. P. Verret/D. E. Ward i P.O. Box 2121 Corpus Christi, Texas 78403 l

INPO Records Center 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064 Mr. Joseph M. Hendrie 3 50 Be11 port Lane. - '

Be11 port, New York 11713 <

Bureau of Radiation Control State of Texas 1101 West 49th Street '

Austin, Texas' 78756 Judge, Matagorda County

,Matagorda County Courthouse '

1700 Seventh Street Bay City, Texas 77414 ,

Licensing Representative Houston Lighting & Power. Company Suite 610

'Three Metro Center Bethesda, Maryland 20814 Houston Lighting & Power Company '

ATTN: Rufus S. Scott, Associate General Counsel  ;

P.O. Box 61867- ,

Houston, Texas 77208 U.S. Nuclear Regulatory Commission ATTN:- Resident Inspector P.O. Box 910 f Bay City, Texas 77414 >

(, .,.

Houston Lighting & Power Company t U.S. Nuclear Regulatory Commission ATTN: Regional Administrator, Region IV 611 Ryar, Plaza Drive, Suite 2000 Arlington, Texas 76011 bec w/nonsafeguards portion of letter dated June 1, 1990:

DMB (RG01)

DRP B. Beach, DR$$

L Security' Inspector Section. Chief, SEPS Section Chief. DRP/D Resident inspector Christy Moor' , ,'JGB/1RR RITS Coordinator  :

50.54(p) Boot SEPS Security File  !

Official Sec'rity File RIV File

. Project.Engitseer, DRP/D DRS MIS G. Dick, NRR Project Manager Leah Tremper, LFDCB l

-i

'C' SAFEGU ARDS ISFORMATION The Light 1

i co mp a nySouth Tetu Project Electric Generating Station P.O.Bos289 Wadsworth, Tenn 17483 Houston Lighting 4: Power UPON SEPARATION THIS  %$ @ S f!Y

~

PAGE IS DECONTROLLED June 1, 1990

'g .. ;; ST.HL AE 3469 Tile No.: 009.09

_ , . . _ 10CPR73.55 10CFR$0.54(p)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Cenerating Station Units 1 and 2 Docket Nos. STN 50 498, STN 50 499 Safeguards Contingency Plan. Revision 10 1

Enclosed are four copies of Revision 10 to the South Texas Project 1 Electric Cenerating Station Safeguards Contingency Plan. In addition, three I copies of this revision are being forwarded to R. Region IV. This document supercedes all previous revisions. None of the changes described in this revision represent any lessening of security effectiveness; hence, this 1 revision is being submitted in accordance with 10CFR50.54(p)(2).

1 Changes have been made to Sections 1, 3, and 4 of the Safe 6uards l contingency Plan. Descriptions of the changes are provided in Attachment 1.

1 The revised sections of the Safeguards Contingency Plan provided with l l

this letter require protection as safeguards information in accordance with 10CFR73.21. When separated from the revised sections, this letter and the list of changes are not considered safeguards information. .

If you should have any questions, please contact Mr. P. L. Valker at (512) 972 8392 or myself at (512) 972 8530.

,J

/ .. .

6/ pf h.8%{

cBurnetc Manager, Nuclear Licensing PLV/n1 Attachments: 1, List of Changes

2. Safeguards Contingency Plan, Revision 10 A1/026.N14 as(m,w v

v m9n SAFEdtTiti3M6HXnox  !