IR 05000498/1989047

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-47 & 50-499/89-47.Review Will Be Documented in Insp Repts 50-498/90-30 & 50-499/90-30
ML20059E752
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/31/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hall D
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 9009100304
Download: ML20059E752 (3)


Text

~~v 3p

..

. u

,

.

,

q.m

,

.-

.

,

--

-

AUG:31 1990

,

~

In Reply Refer To: _

c

LDockets:

50-498/89-47 50-499/89-47-

y

'HoustonLightingI&PowerCompany_

[

ATTN:' Donald P. Hall', Group-Vice President, Nuclear P.O. Box-1700

.

Houston, Texas 77251 l

"

Gentlemen:

i Thank you for your letter of February 22, 1990, in re'sponse to our letter-

,

,

and Notice of Violation dated January 23, 1990. We have reviewed the-

.

implementation of your corrective actions and found them to be acceptable. We y

,a.

will~ document this review in NRC Inspection Report 50-498/90-30; 50-499/90-30.

'

.

Sincerely,

i

/5 i

Samuel J. Collins, Director Division of Reactor Projects cc:

Houston Lighting & Power Company ATTN: -M.-A. McBurnett, Manager

.

Operations Support Licensing

.

'P.O. Box 289 Wadsworth, Texas 77483

.

City.of-Austin Electric Utility a

' ATTN: !J. C. Lanier, Director of i

.

Generation

-

721 Barton Sprinos Road Austin, Texas 78704

'

! City Public Service Board A

' ATTN: 'R..J. Costello/M. T. Hardt

P.0; Box 1771 i

,

. San Antonio, Texas 7bc96 g\\

RIV:DRP/D

DRP/D D'

N WBJones;df' O SWiebe illins Ls/3t/90'

H 8/3)/90

\\

I\\

f 3009i00304 900831 PDR ADOCK 05000498 o

PDC

~

p 7.

,.3

'

-

,

y,fy i o

,

,

,

,

.,

s i.

[y,' Houston Lighting & Power Company-2-

~

N!i

.

I

'

b;

\\

>

>

._.

^ Newman & Holtzinger, P. 'C.

l

,

, ATTN: -Jack R. Newman, Esq.

11615 L Street, NW j

,

' Washington, D.C.

20036

.

j

'

-

A

'

'

Central Power and Light Company

!

LATTN:

.R. P.; Verret/D. E. Ward q

'

Le

.P.O. Box 2121 Corpus Christi, Texas 78403

,

INP0-

.

Records Center-

,

y

1100 Circle 75 Parkway

{

. Atlanta, Georgia _30339-306,4 L

Mr. Joseph M." Hendrie

_50 Bellport Lane

jBellport, New York 11713.

.

.

,

,

I ureau of Radiation Control B

State of Texas

,

a.1101 West _49th Street

'

Austin,' Texas 78756.

-;;

fJudge,'MatagordaCounty>

.

'Matagorda County Courthouse M_

L1700 Seventh Street

.

.

Bay' City, Texas '77414

.

'

..l Licensing Representative

'

Houston Lighting &' Power Company

'

~

  • = Suite 610~

,Three Metro Center.

4,

-

,

e

^

Bethesda,_ Maryland 20814

!

> Houston Lighting-& Power Company

-

LATTN: JRufus S. Scott, Associate

General Counsel

..

...)P.O.' Box 61867 f

'lHouston, Texas 77208

,

,, j

.S.-Nuclear Regulatory Commission

?

ATTN:

Resident. Inspector

'

,

JP;0. Box 910-

'

Bay City, Texas 77414 l

"~

h:5

'U.S.. Nuclear Regulatory Commission

.

f" ATTN:= Regional Administrator, Region IV 611' Ryan Plaza Drive, Suite 1000 L'

i Arlington, Texas 76011

-

-

u I

,

,

. %t f, ;- 7; e

.

.

...

-

~ :

,

,

~

.

.

..

' :.

~

.

j'f2 Houston Lighting & Power Company.

-3-

'

,

t

,

[bec.to DMB (IE01) w/ enclosure _

'

bec distrib..by RIV w/ enclosure:

,'

R.: D. Martin Resident Inspector

DRP SectionChief-(DRP/D)

'

DRS MIS System-DRSS-FRPS~

Lisa Shea, RM/ALF

',

RIV File R. Bachmann, 0GC RSTS_ Operator.

Project Engineer (DRP/D)

!

.

F

'N

[

>

$

i r

Y

,

.s s

P r

-I i-i

..

t

'

I I

fit ; '

s>

'

.

l-

,

-

>

l,,

.

1.. glr.

.

.

~

The Light s

companySoutHuns Pnjut Dutrk nunting Station P.O. Bos m Wadmorth. Tune 77W Houston Lighting & Power February 22. 1990 ST HL AE 3381-File No.: G02.04 10CFRSC 8,..3 e:

U. S. Nuclear Regulatorv Commission ib

.

_

+

-

.d, )! j

.

Attention: Document Cantrol Desk

'

i Washington, DC 20555

&,jy

.

South Texas Project Electric Generating Station;

~

Units 1 6 2

. Docket Nos. STN 50 498, STN 50 499 Response to Notice of Violation 8947 01 Failure to Establish a Calibration Procedure for Heat Trace Control Circuits Houston Lighting & Power Company has reviewed the Notice of Violation issued as a result of NRC Inspection Report 89 47 dated January 23, 1990 and submits the attached response.

If you si.?uld have any questions on this matter, please contact Mr. C. A. Ayala at (512) 972 8628 or myself at (512) 972 8687, q

c.e. Ag-q

,

G. E. Vaughn O

)

Vice President Nuclear Operations

'

AKK/n1 Attachment:

Reply to Notice of Violation 8947 01

.

A1/027.N12

-

A Subsidiary of Houston Industries incorporated

,

ws m a

~ JUUc?U$.. y

'

_

f4 - SE::L

.

h*;. -

ST.HL AE 3381

' H:uston 1.ighting & Power Company.

Filo No. : CO2.04

.

i South Texas Project Electric Generating Station Page 2 cc:-

! Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company-Arlington.TX 76011 P. O. Box 61867 Houston, TX: 77208 George Dick, Project Manager

.

U.S.-Nuclear Regulatory Commission INPO Washireston, DC 20555 Records Center 1100 circle 75 Parkway J.'I. Tapia Atlanta, CA 30339 3064 Senior Resident inspector c/o U. S. Nuclear Regu'

ey Dr. Joseph M. Hendrie Commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713-Bay' City, TX 77414 D. K. Lacker J. ' R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C.

Texas Department of 3ealth 1615 L Street, N.W.

1100 West 49th Street i

Washington, DC 20036 Austin, TX 78704 D. E. Ward /R. P. Verret Central Power & Light Company P. O. Box 2121-

!

Corpus Christi, TX 78403

,

' J. - C. Lanier Director of Generation u-City of Austin Electric Utility l

721 Barton Springs Road D

Austin, TX 78704'

L

'

R. J. Costello/M. T, Hardt-City Public Service Board P.-0. Box 1771 L

San-Antonio, TX 78296

.

l l

l l.

is

.

l Revised 12/15/89 IA/NRC/

,

_

_

_ __

I e?

..

.

.

Ef*L l

,

ST HL. AE.3381 Attachment i

Page 1 of 3'

South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50 498 STN 50 499

Response to Notice of Violation 8947 01 Failure to Establish a Calibration.

Procedure for Heat Trace Control Circuits j

i I.

Statement of Violation TS 6.8.1 requires written procedures to be established, implemented, W

and maintained covering certain activities, including the applicable procedures recommended in Appendix A of Regulatory Guide 1.33,

" Quality Assurance Program Requirements (Operation)." Revision 2,.

which includes procedures for control e aasuring and test equipment and for surveillance tests, procedures, anu -;'tbratinns.

Contrary to the above, as of December 21, 1989,,*

.tten procedures

,

were established to verify the calibration accuracy of heat trace control circuits needed to accomplish TS Surveillance Requirements 4.1.2.1.a and 4.1.2.2.a regarding minimum temperatures for boric acid f

flow paths.

This is a Severity Level IV violation.

(Supplement 1)

(498/8947-01;

499/E947 01).

l l

II.

Houston Liebtine & Power Co. Position-L HL&P concurs that the violation occurred as stated.

,

III.

Reason for Violation It was determined that the controllers and temperature monitoring modules for the Freeze Protection (NK) System were not included in the procedure, OPGP03 ZM-0016. Rev. 2, which governs the performance of instrument calibrations by the Preventive Maintenance program. The

,

l specific modules in question are the Heat Trace Panels, which are used to verify that the temperature of the boric acid system required by l

Technical Specification remains above the 65 degree temperature limit.

l l

l

-

A1/027.N12

f-

~

~

c

.

.

..

,

ST.Hl..AE.3381 Attachment Page 2 of,3 III.

Reason for Violation Cont'd.

The original scope of the procedure (OPGP03.ZM 0016) was to address j

the calibration requirements for analog display monitoring instruments. The modules (panels) in the NK system provide both analog display and bistable indication.

Plant Operations uses the bistable (lamp) indication as the primary' indication to ensure Technical Specification compliance.

Because the original scope of the j

procedure did ngI include calibration requirements for bistable i

display monitoring instruments, the modules were not included in the

original procedure.

A subsequent revision expanded the scope of the procedure to include bistable channels. During a review of surveillance procedures to determine instrumentation to be added to the OPGP03 ZM-0016 procedure, Plant Operations provided marked up copies of operator log sheets to the Maintenance I6C division (which is responsible for the procedure).

These sheets identified the NK system modules as items to be included in the revision of OPGP03.ZM 0016.

The log sheets indicate the channel numbers that Plant Operations uses to document Technical Specification compliance, rather than the instrument numbers, therefore, it was not readily apparent that these modules should be incorporated in the OPGP03.ZM 0016 procedure. Therefore, these NK channels were overlooked and not incorporated into the instrument calibration procedure.

IV.

Corrective Action Taken and Results Achieved 1.

The heat trace circuit temperature controllers, which give bistable indication, were calibrated.

No primary circuits were found to have a controlling setpoint which would have allowed the Boric Acid line temperatures to violate the Technical Specification limits.

2.

The heat trace circuit temperature analog indication was checked and found to be within tolerance on all but three channels, which had outstanding work documents.

No non conservative displays were

-

found. The maximum error was a reading 5 degrees below actual (i.e., in the conservative direction).

3.

A review of the previous submittal by Plant Operations of channels to be incorporated in the OPGP03-ZM 0016 revision indicated no further omissions of a similar nature.

A1/027.N12

.

-.

-

.

.

?....,. '.

..

,

,

-

.

.

ST HL AE 3381-Attachment'

Page'3 of 3'

)

i V.

Corrective Actions Taken to Prevent Recurrence i

.

.

.

1.

The calibration requirements for the heat trace circuits have been included in the in process revision to OPGP03.ZM 0016.

2.-

HL&P will sveview instruments which are used to satisfy Technical Specification Surveillance procedures to ensure they are calibrated as necessary.

This action will be completed by 3/30/90. An evaluation of'this. review will determine any changes to the in process revision to OPCP03-ZM 0016. Any procedure / program changes necessary will be completed by 4/16/90.

VI.

Date of Full Como11ance HL&P will be in full compliance by 4/16/90.

,