Text
JUL 1-1987
,-
,
In Reply Refer To:
Dockets: 50-498/87-37 50-499/87-37 Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear P. 0. Box 1700 Houston, Texas 77001 Gentlemen:
This refers to the inspection conducted by Messrs. G. L. Madsen, W. B. Jones, B. L. Bartlett, and E. P. Hildebrand in conjunction with NRC consultants during the period April 13 through June 11, 1987, of activities authorized by NRC Construction Permits CPPR-128 and CPPR-129 for the South Texas Project (STP),
Units 1 and 2, and to the discussion of our findings with Mr. W. H. Kinsey and other members of your staff on April 17, May 8, and June 11, 1987.
Areas examined during the inspection included a review of the overall startup program, startup procedure review, and licensee actions on previous inspection findings. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the NRC inspectors. The inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
s I
Should you have any questions concerning this inspection, we will be pleased te l
discuss them with you.
I l
Sincerely, I
%Itstw,I S'GhG:) t!f.
j h. E. H/d L"
)
!
\\
J. E. Gagliardo, Chief Reactor Projects Branch
'
i Enclosure:
Appendix - NRC Inspection Report
!
l 50-498/87-37 50-499/87-37 cc w/ enclosure:
(see next page)
l d'M h
RPB/C PI M C:RPB/C F8iS
- RPB GLMad en/cg HFBundy GLConstable gEGagliardo ft 7/ /87
/p
]/l/87 7 / / /87 7/ / /87
a\\
g7JgB!RBl8$ge G
l
.
.
.
.
Houston Lighting & Power Company-2-cc'w/ enclosure:
Houston Lighting & Power Company i
i ATTN:
M. Wisenberg, Manager, Nuclear Licensing P. O. Box 1700 t
Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P..O. Box 1700 Houston, Texas 77001 Texas Radiation Control Program Director
'
bec to DMB (IE01)
bec distrib. by RIV:
l
- RPB DRSP j
- RRI-0PS R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
]
RPSB
- MIS System i
- RIV File
- D. Weiss, RM/ALF J
l
- RSTS Operator R. Pirfo, 0GC
- R. G. Taylor, RPB/C
- RSB
- Project Inspector, RPB
- R. Hall NRR Project Manager W. B. Jones G. L. Madsen B. L. Bartlett E. P. Hildebrand
'