Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20206H620
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/05/1999
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20206H624 List:
References
50-498-99-06, 50-498-99-6, 50-499-99-06, 50-499-99-6, NUDOCS 9905110263
Download: ML20206H620 (5)


See also: IR 05000498/1999006

Text

h

UNITED STATES

/,/* "% ,'o*

t

e . NUCLEAR REGULATORY COMMISSION

l' f REGloN IV

$ 611 RYAN PLAZA DRIVE. sulTE 400

l 4 , , , , , *,8 ARLINGTON, texas 760118064

l MAY -5 1999

William T. Cottle, President and

. Chief Executive Officer

STP_ Nuclear Operating Company

P.O. Box 289

Wadsworth, Texas 77483

SUBJECT: NRC INSPECTION REPORT NO. 50-498/99-06; 50-499/99-06 AND NOTICE OF

VIOLATION

Dear Mr. Cottle:

This refers to the inspection conducted on February 21 1999 through April 3,1999, at the

South Texas Project Electric Generating Station, Units and 2, facility.

During the 6-week period covered by this inspection, your conduct of activities at the South

Texas Project facilities was generally characterized by safety-conscious operations, sound

maintenance and engineering practices, and careful radiological work controls.

Based on the results of this inspection, the NRC has also determined that three violations of

NRC requirements occurred. These violations are being treated as noncited violations (NCVs), '

.

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,  !

Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the i

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,  !

DC 20555-0001. (

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them l

with you.  !

Sincerely,

'

Y f l

'

Js hI. apia, C ef l

Pr jects Branch A l

Division of Reactor Projects

l

Docket Nos.: 50-498

!

50-499

License Nos.: NPF-76

NPF-80

'

9905110263 990505

ADOCK 05000498

.

PDR

G PDR

,

>>

i j

l

o .

.

1

STP Nuclear Operating Company -2-

. Enclosure:

NRC Inspection Report No. 50-498/99-06; 50-499/99-06

cc w/ enclosure:

T. H. Cloninger, Vice President ,

Engineering & Technical Services l

.STP Nuclear Operating Company -

. P.O. Box 289.

Wadsworth, Texas 77483.

Scott Head -

Nuclear Assurance & Licensing.

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, Texas 77483

A. Ramirez/C. M. Canady

City of Austin

' Electric Utility Department  ;

721 Barton Springs Road

Austin, Texas 78704 l

Mr. M. T. Hardt/Mr. W. C. Gunst

City Public Service Board

P.O. Box 1771

San Antonio, Texas,78296

D. G. Tees /R. L. Balcom

' Houston Lighting & Power Company

. P.O. Box 1700

. Houston, Texas 77251

,.

Jon C. Wood .

L ' Matthews & Branscomb

One Alamo Center

106 S. St. Mary's Street, Suite 700

San Antonio, Texas .78205-3692

Jack R. Newman, Esq.

Morgan, Lewis _ & Bockius

1800 M. St6 eet, N.W.-

Washington, D.C. 20036-5869

pr q

D.~

,

a -

' STP Nuclear Operating Company -3-

i

Mr. G.- E. Vaughn/Mr. C. A. Johnson

. Central Power & Light Company ' i

P.O. Box 289

Mail Code: N5012-

. Wadsworth, Texas ~ 77483 1

INPO

Records Center

700 Galleria Parkway '.

Atlanta, Georgia ' 30339-5957 - l

. Bureau of Radiation Control I

~ State of Texas  !

1100 West 49th Street  !

. Austin, Texas' 78756

' Mr. Jim Calloway.;

- Texas Public Utility Commission  ;

William B, Travis Building . 1

1701 North Congress Avenue

P.O. Box 13326 -

Austin, Texas 78701-3326-

John Howard,' Director

Environmental and Natural Resources Policy

L Office of the Governor. i

P.O. Box 12428 -

Austin, Texas 78711

. Judge, Matagorda County '

Matagorda County Courthouse

1700 Seventh Street

Bay City,' Texas 77414

._

y

,:

RY 5 1999 '

.

STP Nuclear Operating Company -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL) )

~ E Mail report to NRR Event Tracking System (IPAS) i

'

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01) - DRS, DRP, and Decommissioning

bec to DCD (IE06) - Radiological Protection Reports

bec to DCD (IE07) - Fuel Facilities

bec to DCD (IE35)- Emergency Preparedness Reports

l

l

I

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB ,

DRS Director MIS System

Branch Chief (DRP/A) RIV File

Project Engineer (DRP/A) R. Bachmann, OGC (MS: 15-B-18)

Branch Chief (DRP/TSS)

i

& .i .M

/zt7  %^f fg

DOCUMENT NAME: R:\_S \ST906RP.NFO #

To receive copy of document,indi e in box: "C" = Copy wthout enclosures *E" = copy wth enclosu[s "N" - No erpy

RIV: SRI .3 RI RI n PE LC:DRP/Al

NFO'KeefeMW '

WCSifre GLGuerrM+t DBAllen $A 4(JITapiaW

\

05/% 99 05/ /99 05/% 99 05/'f/99 05/6/99

OFFICIAL RECORD COPY

.- .

'

5 1999

'

STP' Nuclear Operating Company -4-

.

E-Mail report to T. Frye (TJF) 4

' E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

' E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

f

bec to DCD (IE01 - DRS, DRP, and Decommissioning

bec to DCD ) - Radiological Protection Reports

bec to DCD (1 7) - Fuel Facilities

bec to DCD ( 5) - Emergency Preparedness Reports

. bec distrib. by RIV: i

Regional Administrator Resident inspector i

DRP Director DRS-PSB

DRS Director - MIS System

. Branch Chief (DRP/A) RIV File .

Project Engineer (DRP/A) R. Bachmann, OGC (MS: 15-B-18) i

Branch Chief (DRP/TSS) '

/

b

f' /QtP  %* y .h /p

DOCUMENT NAME:- R:(S \ST906RP.NFO / #

To receive copy of document, Indic to in box: "C" = Copy without enclosures "E" = Copy with enclosupIns "N" = No c3py

RIV: SRI . .N'

Rt RI n- PE [C:DRP/AX

NFO'KeefeWet '

WCSifre . GLGuerrM+t DBAllen M 40lTapiaW

05/499' 4

05/ /99 05AY99 05/4/99 05/6/99

OFFICIAL RECORD COPY

.

1100%

_