MONTHYEARML20056A7981990-08-0303 August 1990 Advises That 900122 Relief Requests Re Pump & Valve Inservice Test Plan Acceptable & That Stroke Time Criteria Need Not Be Documented in Plan Itself,If Included Elsewhere in Procedures.Any Revs to Plan Should Be Provided to NRC Project stage: Approval 1990-08-03
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F8821990-11-15015 November 1990 Ack Receipt of 901017 Response to Violations Noted in Insp Repts 50-498/90-28 & 50-499/90-28 IR 05000498/19900101990-11-0909 November 1990 Ack Receipt of 900711 & 1003 Ltrs Informing NRC of Corrective Measures for Weaknesses Noted in Insp Repts 50-498/90-10 & 50-499/90-10 ML20062F8911990-11-0707 November 1990 Advises of Postponement of Soviet Delegation Visit to Plant Site Due to Unavailability of Seats on Aeroflot. Representatives Will Try Again to Obtain Seats in 2 Wks.Nrc May Reschedule Visit to Plant If Representatives Successful ML20216J9651990-11-0606 November 1990 Concludes That Actions Proposed in Util Response Met Intent of Generic Ltr 88-17, Loss of Dhr ML20062E3841990-11-0606 November 1990 Advises That 900914 Proposed Rev to Exam Schedule for Class 1 Nozzles Complies W/Asme Section XI Code XI-1-86-74 ML20058E2941990-11-0202 November 1990 Forwards Summary of Staff Understanding of Current Status of Generic Safety Issues Which Remain Unimplemented IR 05000498/19900311990-11-0101 November 1990 Discusses Insp Repts 50-498/90-31 & 50-499/90-31 on 900912- 21 & Forwards Notice of Violation IR 05000498/19900051990-10-31031 October 1990 Ack Receipt of 901001 Request for Extension of Corrective Action Implementation Date for Violations Noted in Insp Repts 50-498/90-05 & 50-499/90-05.Commitment to Implement Corrective Actions Prior to Aug 1991,acceptable ML20058A5941990-10-18018 October 1990 Requests Addl Info Re Review of Probability Safety Assessment of Facility ML20059M7001990-09-28028 September 1990 Forwards Insp Repts 50-498/90-27 & 50-499/90-27 on 900813-17.No Violations or Deviations Noted ML20059N7721990-09-24024 September 1990 Forwards Safety Evaluation Accepting Util First 10-yr Interval Inservice Insp Program Plan ML20059K9321990-09-18018 September 1990 Forwards Insp Repts 50-498/90-28 & 50-499/90-28 on 900730- 0808 & Notice of Violation.Violation Re Mixed Bed Demineralizer of Particular Concern Because Potential for Inadvertent Reactivity Not Mitigated ML20059J9971990-09-13013 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010 IR 05000498/19890471990-08-31031 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-47 & 50-499/89-47.Review Will Be Documented in Insp Repts 50-498/90-30 & 50-499/90-30 ML20059F0921990-08-30030 August 1990 Forwards Request for Addl Info Re Fire Protection Modeling in Probability Safety Assessment.Answers to Questions Will Form Basis for 900919 Meeting in Rockville,Md ML20059D5861990-08-27027 August 1990 Confirms 900830 Mgt Meeting in Region IV Ofc to Discuss Scenario Exercise Weaknesses Identified During Apr 1990 Emergency Exercise at Plant ML20056B3971990-08-20020 August 1990 Forwards Partially Withheld Insp Repts 50-498/90-22 & 50-499/90-22 on 900604-08 & Notice of Violation ML20056B3191990-08-17017 August 1990 Forwards Insp Repts 50-498/90-24 & 50-499/90-24 on 900701-0801.No Violations or Deviations Noted ML20056A7791990-08-0808 August 1990 Discusses Licensee Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Justification for Differences in Program & Generic Ltr Should Be Incorporated Into Program Description ML20056A7751990-08-0707 August 1990 Forwards Request for Addl Info Based on Review of Probability Safety Assessment at Plant ML20056A7981990-08-0303 August 1990 Advises That 900122 Relief Requests Re Pump & Valve Inservice Test Plan Acceptable & That Stroke Time Criteria Need Not Be Documented in Plan Itself,If Included Elsewhere in Procedures.Any Revs to Plan Should Be Provided to NRC ML20056A7961990-08-0303 August 1990 Advises That Util Response to Generic Ltr 88-06 Re Implementation of Spds,Acceptable ML20055G8191990-07-19019 July 1990 Forwards Insp Repts 50-498/90-23 & 50-499/90-23 on 900601-30.No Violations or Deviations Noted IR 05000498/19900011990-07-19019 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/90-01 & 50-499/90-01 ML20055G0771990-07-13013 July 1990 Advises That Most Portions of Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Portions Noted in Encl That Decrease Effectiveness of Plan Should Be Resubmitted.Encl Withheld (Ref 10CFR73.21) ML20055F5831990-07-10010 July 1990 Advises That 900601 Rev 10 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20055F7431990-07-0505 July 1990 Advises That Util 900216 Response to Bulletin 89-003, Potential Loss of Required Shutdown During Refueling Operations, Acceptable ML20059M8401990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248H5811989-10-0505 October 1989 Forwards Summary of 891003 Meeting in Region IV Ofc Re Activities Authorized by Licenses NPF-76 & NPF-80 ML20248H2151989-10-0505 October 1989 Forwards Insp Repts 50-498/89-31 & 50-499/89-31 on 890814-25.No Violations or Deviations Noted IR 05000498/19890171989-09-29029 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-17 & 50-499/89-17 ML20248C6901989-09-28028 September 1989 Forwards Insp Repts 50-498/89-35 & 50-499/89-35 on 890814-18 & Notice of Violation ML20248C6101989-09-27027 September 1989 Forwards Insp Repts 50-498/89-33 & 50-499/89-33 on 890821-25.Violations Noted,But No Citations Will Be Issued, Per NRC Policy ML20248C6731989-09-26026 September 1989 Forwards Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations or Deviations Noted ML20247R3021989-09-22022 September 1989 Forwards Insp Repts 50-498/89-37 & 50-499/89-37 on 890911-15.Violations Noted.No Citation Issued Per Section V.A of NRC Enforcement Policy ML20248G9491989-09-21021 September 1989 Forwards Unexecuted Amend 6 to Indemnity Agreement B-108, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248E6121989-09-21021 September 1989 Forwards Safety Evaluation Re Deletion of Dynamic Rod Drop Test,Static Rod Cluster Control Assembly (Rcca) Test & Rcca Below Bank Position Measurement Tests Based on Review of Util 890728 Submittal.Deletion Acceptable ML20247H5281989-09-12012 September 1989 Forwards Insp Repts 50-498/89-36 & 50-499/89-36 on 890821-25 & Notice of Violation ML20247K2001989-09-12012 September 1989 Advises That Rev 1 to Licensee Licensed Operator Requalification Program Meets 10CFR50.59 Requirements & Acceptable.Revised Rule Stated in Generic Ltr 87-07 Offered as Alternative to Submitting Program for Review ML20247D4521989-09-11011 September 1989 Forwards Insp Repts 50-498/89-25 & 50-499/89-25 on 890724-28 & 0807-11.No Violations or Deviations Noted. Independent Safety Engineering Group Appeared to Be Below Goal for Performing Direct Plant Observations ML20247B6891989-09-0101 September 1989 Forwards Summary of 890825 Meeting W/Util in Region IV Ofc Re Activities Authorized Under Licenses NPF-76 & NPF-80. Better Understanding of Util Operations,Refueling Outage & Mgt Programs Provided ML20246M9411989-08-31031 August 1989 Forwards Insp Repts 50-498/89-22 & 50-499/89-22 on 890710-14.No Violations or Deviations Noted ML20247A5621989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executive Meeting on 890818 at Univ of Texas.Agenda & List of Attendees Encl ML20246E9721989-08-25025 August 1989 Forwards Insp Repts 50-498/89-26 & 50-499/89-26 on 890718-20.No Violations or Deviations Noted ML20246A3271989-08-16016 August 1989 Forwards Insp Repts 50-498/89-28 & 50-499/89-28 on 890731-0804.No Violations or Deviations Noted ML20245L5451989-08-15015 August 1989 Forwards Insp Repts 50-498/89-17 & 50-499/89-17 on 890601-30 & Notice of Violation ML20245H3801989-08-11011 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-10 & 50-499/89-10 ML20245J5211989-08-10010 August 1989 Forwards Insp Repts 50-498/89-15 & 50-499/89-15 on 890607-30 & Notice of Violation.Actions Taken Re Previous Insp Findings Examined 1990-09-28
[Table view]Some use of "" in your query was not closed by a matching "". Category:OUTGOING CORRESPONDENCE
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
.
y August 3, 1990 Docket-No. 50-499 ~
DISTRIBUTION i 1 Mr. Donald P. Hall Docket File;; E. Peyton-Group Vice-President, Nuclear NRC PDR G. Dick i Houston Lighting & Power Company Local PDR OGC 5 'P. O. Box 1700 D. Crutchfield E. Jordan -ft Houston, Texas 77251 B. Boger ACRS (10)
PDIV-2 R/F L. Marsh
Dear Mr. Hall:
PDIV-2 Plant File J. Wiebe '
i
SUBJECT:
PUMP AND VALVE INSERVICE TEST (IST) PLAN, REVISION 2, SOUTH I TEXAS PROJECT, UNIT 2 (TAC NO. 76174)
By letter dated January 22, 1990 (ST-HL-AE-3345) Houston Lighting and Power '
Company (HL&P) submitted the subject plan. In the lotter, HL&P stated that i the plan was the same as the Unit 1 IST plan with the exception of the stroke time criteria, which though absent for the Unit 1 plan were included in Revision 2 to the Unit 2 IST plan.
The staff reviuwed the Unit 1 IST plan and found the relief requests accept-able. The results of the review were reported in Supplement No. 5 (SSER 5) to the Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 NUREG-0781. Similarly, the staff acceptance of the relief. l requests in the Unit 2 IST plan, subject to timely resolution of the stroke time i criteria..is reported in SSER 6 to NUREG-0781. HL&P has addressed this issue in l the subject plan. While the staff finds this acceptable, the stroke tir.e criteria need not be documented in the plan itself, if it is included elsewhere in proce- 1 dures. With this approach, changes in stroke time criteria would not require i revisions to the IST plan. Our program review is complete. However, the program.
j
- 3
, and implementation documentation should remain available onsite in the envent that
.an implementation inspection is conducted. Any revisions to the IST plans should be provided to the NRC.
Sincerely,
)
OriginalSignedByi i George F; Dick, Jr. , Project Manager Project Directorate IV-2 Division of Reactor Projects - III, IV, V and Special-Projects Office of Nuclear Reactor Regulation cc: See next page
{ d *See previous sheet for concurrence ;
0FC : PDIV-2/LA* : PDIV-2/PM* : NRR:MEB* : PDIV-2/
.............................. ......................:......... f :...............:... ........
NAME : EPeyton : GDick:ye : LMarsh : CGrime : :
3 ..... ..............--............................--........................----...............
f DATE : 7/25/90 : 7/25/90 : 8/2/90 :
8/g/90 OFFICIAL RECORD COPY Document Name: PUMP & VALVE INSERVICE TEST
} 4 ; ll r
QP""9963090211 DR ADOCK 0500 900803 9
- .- . 'o eL .?
$ Mr/ Donald P. Hall -
cc:
Senior Resident Inspector Jack R. Newman, Esq.
U.S. Nuclear Regulatory Commission Newman & Holtzinger, P.C.
P. O. Box 910 1615 L Street, N.W.
Bay City, Texas 77414 Washington, D.C. 20036 Mr. J. C. Lanier Licensing Representative i Director.of Generation Houston Lighting and Power Company City of Austin Electric Utility Suite 610 721 Barton Springs Road Three Metro Center Austin, Texas 78704 Bethesda, Maryland 20814 Mr. R. J. Costello Bureau,of Radiation Control Mr. M. - T. Hardt- State of Texas City Public Service Board 1101 West 49th Street P. O. Box 1771 Austin, Texas 78756 San Antonio, Texas -78296 '
Rufus S. Scott Mr. R. P. Verret Associate General Counsel Mr. D. E. Ward Houston Lighting & Power Company L Central' Power and Light Company P. O. Box 61867 l' P. O. Box 2121- Houston, Texas 77208 Corpus Christi, Texas 78403 INPO Reccrds Center 110, Circle 75 Parkway.
Atlanta, Georgia 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Sufte 1000 l
Arlington, Texas 76011
,Mr. Joseph M. Hendrie 50 Be11 port' Lane i, Be11 port, New York 11713 I
Judge, Matagorda County Matagorda County Courthouse l
o 1700 Seventh Street Bay City, Texas 77414 l
Mr. M..A. McBurnett L . Manager, Operations Support Licensing l Houston Lighting & Power Company h P. O. Box 289 Wad: worth, Texas 77483 l
.