ML20059N772
| ML20059N772 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/24/1990 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | Hall D HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20059N773 | List: |
| References | |
| TAC-73433, NUDOCS 9010170285 | |
| Download: ML20059N772 (3) | |
Text
_ _ - _ _ _ _ - _ - -.
,i.- f,t*%y!*,, -
. UNITED STATES e'
i
+
E
[
.[e-y
- 0 L
NUCLEAR REGULATORY COMMISSIONi WASHINGTON. D. C. 20555 ;
r September 24,;1990-Docket No. 50-499' A
Mr. Donald P. Hall Group Vice-President, Nuclear Houston Lighting & Power Company P. O. Box 1700 Houston, Texas '77251
Dear Mr. Hall:
d
SUBJECT:
STAFF REVIEW 0F THE FIRST TEN-YEAR INTERVAL-INSERVICE INSPECTION-PROGRAM PLAN, SOUTH TEXAS PROJECT, UNIT-2 (TAC NO. 73433):
]
By letters dated May 11 and June
- 15.,1989,- Houston Lighting Lan'd Power Company -
d (HL&P) submitted to the NRC, the First Ten-Year Interval: Inservice' Inspection Program: Plan and Requests for Relief RR-ENG-08 and RR-ENG-09 for the South:
i Texas Project, Unit 2. -The program plan was' submitted for review,and evaluation ~
l of its compliance with the requirements of'the 1983 Edition,' including-Addenda through Summer 1983, of Section XI of the ASMEiBoileriand Pressure. Vessel Code,
-i regulations, and plant Technical Specifications.
We have determined that the South Texas' Project -Unit'2, FirstLfen-Year. Interval 1
Inservice-Inspection Program is in compliance with the requirements cited above j
and is acceptable.
We have also determined that Section XI' Code requirements for examination of the steam generator main steam nozzle and pressurizer support
~
skirt cited by the licensee are: impractical to: perform at South: Texas Project.
1 Electric Generating Station, Unit 2 and pursuant to 10;CFR 50.55a(g)(6)(i)'.
. granting relief is authorized by law, will not endanger life or property;or'-
1 the common defense and. security, and is ~otherwise in the publiciinterest.
In:
j making this determination, we have given due consideration to theLburden that could result if those requirements'are~ imposed on your facility.s grants the relief.
~
~'
This letter In its letter of June 20', 1989, HL&P requested approvd1 for use'of ASME; Code.
Case N-460.
ASME Code Case N-460 Alternative Examination Coverage for.
H Class 1 and Class 2 Welds, hgs been reviewed by the; staff and:is: considered?
a acceptable'for use.- This code case willlbe included,-withouticonditions, in:
Revision 8 to Regulatory Guide 1.147.
1 4
i C;1.39 I
l 9010170285 900924 PDR ADOCK 05000499 3s o
FDC
\\
- j r
^
/
a.
_Mr.-DonaldiP.' Hall:-
~-,:I A summary of the req'uirements and bases for our conclusions:are contained in' the staff's' Safety Evaluation with the attached supporting Technical Evaluation
- Report prepared by our contractor,1 1daho National Engineering Laboratory.-
Sincerely,
[
,-}
Christoph rLI-Grimes, Director' y
l
- 4 Project Directorate;IV-2 j
k Division of Reactor > Projects III',
IV,' V and,Special: Projects' Office _of Nuclear Reactor Regulation :
Enclosure:
DISTRIBUTION Safety Evaluation _ Reporti 5dchei G H i s w/ attachments NRC PDR.
Local PDR!
cc w/ enclosure:
T..Murley/F. Miraglia:
See next page J. Partlov '
D.'Crutchfield B. Boger.._
.j PDIV-2"ReadingtFile-PDIV-2 Plant File' l
E. : Peyton
')
(
G. Dick' i
J. Wiebe
?j G. Johnson' I
M. Slosson-G. Hill- (8) 1 C. Rossi 1
~
GPA/PA' l
0C/LFMB~
y 4
1
'0FC
- PDIV-2/LA
- PDIV-2/PM
- 0GC
- : PDIV-2/DL
- >......__.___.4
___.b S. $
' $. II_.. ______.. __._ ________..
I DATE : 9/10 /90
- 9//,1/90
- 9//
..______......_____...___....__.________..__'//90 f/ 9/,tt/90 OFFICIAL RECORD COPY Document Name:
SOUTH TEXAS UNIT 2/ISIP-a
~
,.]
Mr. Donald P. Hall 3-I cc w/ enclosure:
l
' Senior Resident-Inspector Jack R.' Newman, Esq.
U.S.. Nuclear Regulatory Commission Newman & Holtzinger, P.C.
P. 0. Box 910 1615 L' Street, N.W.
Bay City Texas 77414 Washington D.C.
20036 Mr. J. C. Lanier
- Licensing Representative' Director of Generation Houston Lighting and Power Company City of Austin Electric Utility Suite 610 721'Barton Springs Road; Three Metro: Center Austin, Texas 78704 Bethesda, Maryland 20814 Mr. R. J. Costello Bureau of Radiation ~ Control-j Mr. M. T. Hardt
. State-of Texas.
i City Public Service Board
. 1101 West'49th Street P. O. Box 1771 Austin Texas 78756 San Antonio, Texas 78296 Rufus S. Scott
'Mr. R. P. Verret Associate General Counsel Mr. D. E. Ward Houston; Lighting & Power. Company Central Power and Light Company
- P. 0. Box 61867 P. O. Box 2121 Houston, Texas -77208 Corpus Christi. Texas 78403 INPO Records Center-1100 Circle 75 Parkway Atlanta, Georgia 30339-3064 Regional Administrator, Region IV
-U.S. Nuclear Regulatory Commission l
611 Ryan Plaza Drive, Suite 1000 s
1 Arlington, Texas 76011-Mr. ; Joseph M. Hendrie 50 Be11 port Lane
.Bellport, New York 11713 l.
Judge, Matagorda County
.Matagorda County Courthouse
(
1700 Seventh Street Bay City, Texas 77414--
Mr. M. A. McBurnett' Manager, Operations Support Licensing Houston Lighting & Power Company P. 0. Box 280 Wadsworth, Texas 77483 i
f a
r
.w
-w v.
(- c w t-
,.-e.
. --~,-
g