ML20207E071

From kanterella
Revision as of 23:44, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Requests Payment of Fees for Encl List of Applications,Per 10CFR170.Portion of 850128 Application Re Seismic Qualification of Equipment Will Be Billed Separately,Based on 840620 Rev to 10CFR170
ML20207E071
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/16/1986
From: Holloway C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
References
TAC-48736, TAC-49995, TAC-49996, TAC-51477, TAC-54498, NUDOCS 8607220256
Download: ML20207E071 (2)


Text

_

q R 18 IN6 Docket No. 50 416 Mississippi Power & Light Company ATTN: Mr. J. P. Richard Senior Vice President, Nuclear P.O. Box 23054 Jackson, MS 39205 Gentlemen:

We have completed a review of certain applications for license amendments and other approvals which your Company has filed with the Office of Nuclear Reactor Regulation (0NRR) for review in connection with the Grand Gulf Nuclear Station, Unit No. 1. As a result of this review, we find that fees pursuant to 10 CFR 170 have not been paid for several applications which were filed pursuant to the March 23, 1978 regulations. Consequently, we have enclosed a list which shows the application dates, fees paid, fees that are applicable, and the ONRR staff's fee determination on each of them.

Based on the ONRR staff's fee determinations, a total of $36,600 is due the USNRC for the applications on the list. Therefore, you are requested to remit this amount to our office. Your Company will be billed separately for the review of that portion of your January 28, 1985 application regarding seismic qualification of equipment in the Standby Service Water Cooling Tower Basin since that part of the review is subject to fees in accordance with the revision to 10 CFR 170 which became effective on June 20, 1984.

Sincerely, amm s. ammes naseeg. A C. James Holloway, Jr.

/cting Director License Fee Management Staff Office of Administration

Enclosure:

List of Applications and Fees-DISTRIBUTION:

PDR LPDR Reg Files RMDiggs LKintner, BWD-4 P0'Brien, BWD-4 LFMS Reactor File LFMS Pending Check File LFMS R/F e607220256 e60716 DW/LT/ Georgia Power PDR ADOCK 05000416 P PDR

/

OFFICE :LFHS:ADh, :LFM ADM :LFMS:A  :  :  :  :

_________:_____1$ ___: _ _ : . ., _ _____:____________:____________:____________:

SURNAME :LTremper:jp : ' :C y poway  :  :  :  :

DATE :7/14 /86 :7//[/86 :7/i[/86  :  :  :  :

List of Applications and Fees Grand Gulf Nuclear Station, Unit No.1 Docket No. 50-416 Fees ONRR Staff's Fee "

Application Date Fees Paid Applicable Detennination & Action 1/19/82 as supplemented, None $4,000 Single safety issue. ,

Reevaluation of Masonry Approved by letter & SE Wall Design (TAC #49996) dated 11/4/85 '

4/2/82 as supplemented None 4,000 Single saiety issue.

10/14/83 & 1/28/85, Soil Letter & SE dated 6/13/85.

Structure Interaction (TAC 49995)  ;

8/26/83, Inservice inspection None 12,300 Several safety issues.  ;

and Testing Program for Pumps Pending review. <

and Valves (TAC #51477) /

2/9/84, Hydrogen Control None 12,300 Complex issue. Pending Measures (TAC #48736) review.

3/9/84, High Groundwater None 4,000 Single safety issue. i Level (TAC #54498) Approved by letter and  :

SE on 8/19/85 l l

TOTAL FEES APPLICABLE . . . $36,600 l TOTAL FEES PAID . . . . . . I FEES DUE NRC. . . . . . . . $36,600 l

I l

1