MONTHYEARAECM-82-122, Forwards Comparison of Finite Element & Lumped Parameter Soil Structure Interaction for Grand Gulf Power Block Structure, Addressing Confirmatory Item 1.10(4) in SER, NUREG-08311982-04-0202 April 1982 Forwards Comparison of Finite Element & Lumped Parameter Soil Structure Interaction for Grand Gulf Power Block Structure, Addressing Confirmatory Item 1.10(4) in SER, NUREG-0831 AECM-82-316, Forwards Addl Info Re Response Spectra Differences Resulting from Flush/Lush Comparisons Per Ser,Suppl 3,in Support of NRC Review of Elastic half-space & Finite Element Methods of Seismic Analysis.Rept Expected by 8208201982-07-0909 July 1982 Forwards Addl Info Re Response Spectra Differences Resulting from Flush/Lush Comparisons Per Ser,Suppl 3,in Support of NRC Review of Elastic half-space & Finite Element Methods of Seismic Analysis.Rept Expected by 820820 AECM-82-491, Forwards Info Re Monitoring Trend Analysis Program Per Commitment to Summarize Vibration Monitoring Analysis Program for Deep Draft Pump Reliability Per SER Section 1.10 (13)1982-10-18018 October 1982 Forwards Info Re Monitoring Trend Analysis Program Per Commitment to Summarize Vibration Monitoring Analysis Program for Deep Draft Pump Reliability Per SER Section 1.10 (13) AECM-82-574, Forwards Balance of Info to Close Humphrey Containment Concerns,Including Evaluation Rept on Modified SOLA-VOF Code & Survey of Tests & Analyses on Effectiveness of RHR Sys in Pool-Cooling Mode & Proprietary Figures 18 - 251982-12-0303 December 1982 Forwards Balance of Info to Close Humphrey Containment Concerns,Including Evaluation Rept on Modified SOLA-VOF Code & Survey of Tests & Analyses on Effectiveness of RHR Sys in Pool-Cooling Mode & Proprietary Figures 18 - 25 AECM-82-641, Discusses Status of Containment Concerns.Final Rept from Containment Issues Review Panel Will Be Submitted by Mar 1983.Responses to Consultants Delayed Due to Reallocation of Technical Resources1982-12-31031 December 1982 Discusses Status of Containment Concerns.Final Rept from Containment Issues Review Panel Will Be Submitted by Mar 1983.Responses to Consultants Delayed Due to Reallocation of Technical Resources AECM-83-0040, Submits Info Re Deep Draft Pumps Trending Analysis,Humphrey Containment Concerns & Masonry Wall Design & Const,Per Supplemental Ser,In Response to NRC 830112 Request1983-02-25025 February 1983 Submits Info Re Deep Draft Pumps Trending Analysis,Humphrey Containment Concerns & Masonry Wall Design & Const,Per Supplemental Ser,In Response to NRC 830112 Request AECM-85-0028, Responds to Requesting Addl Info on Seismic Analysis Performed for Deeply Embedded Standby Svc Water Cooling Tower Basin.Details on Principles & Techniques Used in Seismic Analysis Provided1985-01-28028 January 1985 Responds to Requesting Addl Info on Seismic Analysis Performed for Deeply Embedded Standby Svc Water Cooling Tower Basin.Details on Principles & Techniques Used in Seismic Analysis Provided ML20126L9111985-06-13013 June 1985 Sser Accepting Seismic Analysis of Soil Structure Interaction for Deeply Embedded Standby Svc Water Cooling Tower Basin ML20126L8941985-06-13013 June 1985 Forwards Safety Evaluation Accepting Seismic Analysis of Deeply Embedded Standby Svc Water Cooling Tower Basin,Per Util 850128 Submittal ML20207E0711986-07-16016 July 1986 Requests Payment of Fees for Encl List of Applications,Per 10CFR170.Portion of 850128 Application Re Seismic Qualification of Equipment Will Be Billed Separately,Based on 840620 Rev to 10CFR170 1982-07-09
[table view] |