MONTHYEARAECM-81-333, Forwards Responses to Structural Engineering Branch 810827 Request for Addl Info.Attachment 4 Re Masonry Walls Supersedes 810824 Response1981-08-28028 August 1981 Forwards Responses to Structural Engineering Branch 810827 Request for Addl Info.Attachment 4 Re Masonry Walls Supersedes 810824 Response Project stage: Request AECM-82-122, Forwards Comparison of Finite Element & Lumped Parameter Soil Structure Interaction for Grand Gulf Power Block Structure, Addressing Confirmatory Item 1.10(4) in SER, NUREG-08311982-04-0202 April 1982 Forwards Comparison of Finite Element & Lumped Parameter Soil Structure Interaction for Grand Gulf Power Block Structure, Addressing Confirmatory Item 1.10(4) in SER, NUREG-0831 Project stage: Other AECM-82-316, Forwards Addl Info Re Response Spectra Differences Resulting from Flush/Lush Comparisons Per Ser,Suppl 3,in Support of NRC Review of Elastic half-space & Finite Element Methods of Seismic Analysis.Rept Expected by 8208201982-07-0909 July 1982 Forwards Addl Info Re Response Spectra Differences Resulting from Flush/Lush Comparisons Per Ser,Suppl 3,in Support of NRC Review of Elastic half-space & Finite Element Methods of Seismic Analysis.Rept Expected by 820820 Project stage: Other AECM-82-491, Forwards Info Re Monitoring Trend Analysis Program Per Commitment to Summarize Vibration Monitoring Analysis Program for Deep Draft Pump Reliability Per SER Section 1.10 (13)1982-10-18018 October 1982 Forwards Info Re Monitoring Trend Analysis Program Per Commitment to Summarize Vibration Monitoring Analysis Program for Deep Draft Pump Reliability Per SER Section 1.10 (13) Project stage: Draft Other AECM-82-574, Forwards Balance of Info to Close Humphrey Containment Concerns,Including Evaluation Rept on Modified SOLA-VOF Code & Survey of Tests & Analyses on Effectiveness of RHR Sys in Pool-Cooling Mode & Proprietary Figures 18 - 251982-12-0303 December 1982 Forwards Balance of Info to Close Humphrey Containment Concerns,Including Evaluation Rept on Modified SOLA-VOF Code & Survey of Tests & Analyses on Effectiveness of RHR Sys in Pool-Cooling Mode & Proprietary Figures 18 - 25 Project stage: Request AECM-82-641, Discusses Status of Containment Concerns.Final Rept from Containment Issues Review Panel Will Be Submitted by Mar 1983.Responses to Consultants Delayed Due to Reallocation of Technical Resources1982-12-31031 December 1982 Discusses Status of Containment Concerns.Final Rept from Containment Issues Review Panel Will Be Submitted by Mar 1983.Responses to Consultants Delayed Due to Reallocation of Technical Resources Project stage: Other ML20083P6321983-01-28028 January 1983 Forwards Responses to NRC Informal Questions Re IE Bulletin 80-11, Masonry Walls. All Load Combinations in Design Criteria,Including Obe,Sse & Tornado Depressurization,Addressed Project stage: Other AECM-83-0040, Submits Info Re Deep Draft Pumps Trending Analysis,Humphrey Containment Concerns & Masonry Wall Design & Const,Per Supplemental Ser,In Response to NRC 830112 Request1983-02-25025 February 1983 Submits Info Re Deep Draft Pumps Trending Analysis,Humphrey Containment Concerns & Masonry Wall Design & Const,Per Supplemental Ser,In Response to NRC 830112 Request AECM-83-0233, Forwards Corrected Providing Update to 830128 & s Re Category I Masonry Walls & Temp Monitoring in HPCS Diesel Generator Room1983-04-13013 April 1983 Forwards Corrected Providing Update to 830128 & s Re Category I Masonry Walls & Temp Monitoring in HPCS Diesel Generator Room Project stage: Other AECM-83-0732, Responds to Questions Raised During Special Safety Insp on 830322-25 Re IE Bulletin 80-11 That Three Mortar Cube Compression Tests Did Not Meet Min Compressive Strength Requirements.Structural Integrity Unimpaired1983-12-30030 December 1983 Responds to Questions Raised During Special Safety Insp on 830322-25 Re IE Bulletin 80-11 That Three Mortar Cube Compression Tests Did Not Meet Min Compressive Strength Requirements.Structural Integrity Unimpaired Project stage: Other AECM-85-0028, Responds to Requesting Addl Info on Seismic Analysis Performed for Deeply Embedded Standby Svc Water Cooling Tower Basin.Details on Principles & Techniques Used in Seismic Analysis Provided1985-01-28028 January 1985 Responds to Requesting Addl Info on Seismic Analysis Performed for Deeply Embedded Standby Svc Water Cooling Tower Basin.Details on Principles & Techniques Used in Seismic Analysis Provided Project stage: Other AECM-85-0035, Forwards High Groundwater Level Study,Grand Gulf Unit 1, Describing Cause for Exceeding Design Groundwater Level in Response to Concerns Expressed in 841115 Telcon.Change to Design Basis Groundwater Level Unnecessary1985-02-14014 February 1985 Forwards High Groundwater Level Study,Grand Gulf Unit 1, Describing Cause for Exceeding Design Groundwater Level in Response to Concerns Expressed in 841115 Telcon.Change to Design Basis Groundwater Level Unnecessary Project stage: Other AECM-85-0088, Submits Info Re Elevated Groundwater Level Recorded on 850228 for Dewatering Well 8.Elevation Caused by Equipment Failure & Above Average Precipitation.Tables Listing Precipitation Measurements & Groundwater Elevations Encl1985-03-25025 March 1985 Submits Info Re Elevated Groundwater Level Recorded on 850228 for Dewatering Well 8.Elevation Caused by Equipment Failure & Above Average Precipitation.Tables Listing Precipitation Measurements & Groundwater Elevations Encl Project stage: Other ML20126L8941985-06-13013 June 1985 Forwards Safety Evaluation Accepting Seismic Analysis of Deeply Embedded Standby Svc Water Cooling Tower Basin,Per Util 850128 Submittal Project stage: Approval ML20126L9111985-06-13013 June 1985 Sser Accepting Seismic Analysis of Soil Structure Interaction for Deeply Embedded Standby Svc Water Cooling Tower Basin Project stage: Other ML20209J0671985-11-0404 November 1985 Safety Evaluation Re Util 820119,830128 & 0413 Responses to IE Bulletin 80-11 on Criteria for Reevaluation of Masonry Walls & Mods.Licensee Fulfilled Requirements of License Condition 2.C.(9) Project stage: Approval ML20209J0571985-11-0404 November 1985 Forwards Safety Evaluation Re Util 820119,830128 & 0413 Responses to IE Bulletin 80-11 on Criteria for Reevaluation of Masonry Walls & Mods.Reevaluation Criteria Acceptable Project stage: Approval ML20207E0711986-07-16016 July 1986 Requests Payment of Fees for Encl List of Applications,Per 10CFR170.Portion of 850128 Application Re Seismic Qualification of Equipment Will Be Billed Separately,Based on 840620 Rev to 10CFR170 Project stage: Other ML20207E2241986-07-17017 July 1986 Discusses OL Review Cost Adjustment for Facility.Total Review Costs Reflected in 850913 OL Costs Summary Revised Project stage: Other AECM-86-0239, Forwards Payment of Fees for Listed Applications.Util Overcharged for Review of Inservice Insp & Testing Program for Pumps & Valves.Encl Payment Adjusted Accordingly1986-09-26026 September 1986 Forwards Payment of Fees for Listed Applications.Util Overcharged for Review of Inservice Insp & Testing Program for Pumps & Valves.Encl Payment Adjusted Accordingly Project stage: Other 1983-02-25
[Table View] |
Text
q R 18 IN6 Docket No. 50 416 Mississippi Power & Light Company ATTN: Mr. J. P. Richard Senior Vice President, Nuclear P.O. Box 23054 Jackson, MS 39205 Gentlemen:
We have completed a review of certain applications for license amendments and other approvals which your Company has filed with the Office of Nuclear Reactor Regulation (0NRR) for review in connection with the Grand Gulf Nuclear Station, Unit No. 1.
As a result of this review, we find that fees pursuant to 10 CFR 170 have not been paid for several applications which were filed pursuant to the March 23, 1978 regulations. Consequently, we have enclosed a list which shows the application dates, fees paid, fees that are applicable, and the ONRR staff's fee determination on each of them.
Based on the ONRR staff's fee determinations, a total of $36,600 is due the USNRC for the applications on the list. Therefore, you are requested to remit this amount to our office. Your Company will be billed separately for the review of that portion of your January 28, 1985 application regarding seismic qualification of equipment in the Standby Service Water Cooling Tower Basin since that part of the review is subject to fees in accordance with the revision to 10 CFR 170 which became effective on June 20, 1984.
Sincerely, amm s. ammes naseeg. A C. James Holloway, Jr.
/cting Director License Fee Management Staff Office of Administration
Enclosure:
List of Applications and Fees-DISTRIBUTION:
PDR LPDR Reg Files RMDiggs LKintner, BWD-4 P0'Brien, BWD-4 LFMS Reactor File LFMS Pending Check File LFMS R/F e607220256 e60716 PDR ADOCK 05000416 DW/LT/ Georgia Power P
PDR
/
OFFICE :LFHS:ADh,
- LFM ADM
- LFMS:A
_________:_____1$ ___:
' C y poway SURNAME :LTremper:jp :
DATE :7/14 /86
- 7//[/86
- 7/i[/86
List of Applications and Fees Grand Gulf Nuclear Station, Unit No.1 Docket No. 50-416 Fees ONRR Staff's Fee Application Date Fees Paid Applicable Detennination & Action 1/19/82 as supplemented, None
$4,000 Single safety issue.
Reevaluation of Masonry Approved by letter & SE Wall Design (TAC #49996) dated 11/4/85 4/2/82 as supplemented None 4,000 Single saiety issue.
10/14/83 & 1/28/85, Soil Letter & SE dated 6/13/85.
Structure Interaction (TAC 49995) 8/26/83, Inservice inspection None 12,300 Several safety issues.
and Testing Program for Pumps Pending review.
and Valves (TAC #51477)
/
2/9/84, Hydrogen Control None 12,300 Complex issue. Pending Measures (TAC #48736) review.
3/9/84, High Groundwater None 4,000 Single safety issue.
i Level (TAC #54498)
Approved by letter and SE on 8/19/85 l
l TOTAL FEES APPLICABLE... $36,600 l
TOTAL FEES PAID...... I FEES DUE NRC........ $36,600 l
I l
1