ML20215M723

From kanterella
Revision as of 18:40, 18 April 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-267/86-23 on 860811-15 & Notice of Violation
ML20215M723
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/28/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20215M724 List:
References
NUDOCS 8611030199
Download: ML20215M723 (2)


See also: IR 05000267/1986023

Text

'

.

.

In Reply Refer To:

Docket: 50-267/86-23 OCT 28 !%6

Public Service Company of Colorado

- ATTN: Robert 0. Williams, Jr. ,

Vice President, Nuclear Operations ,

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers tio the inspection conducted by Mr. J. R.~ Boardman of this office

during the period August 11-15, 1986, of activities authorized by NRC Operating

License DPR-34 for the Fort St. Vrain Generating Station ~, and to the discussion

.of our findings with Mr. J. W. Gahm, and other members of your staff at the

conclusion of the inspection.

The area examined during the inspection was the Fort St. Vrain' Generating

Station Audit Program. Within this area,.the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of- NRC requirements. . Consequently, you are required to respond to

this violation, i'n writing, in accordance with the provisions of Section 2.201-

of the NRC's:" Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Three unresolved items are 1dentified in paragraph 2.e.of the enclosed

inspection report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

.by the' Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,.

Original Signed By.

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures: (see next page)

O

RIV:RSB/OS M OS PS' 1 RSB k RPB

JRBoardman/ Iw - DMH icutt esterman JEGagli o

is/(/86 /O/g/86 JRJaudon TFy/>/86 io/Q/

.lU/}t)/86 N

8611030199 861028

PDR ADOCK 05000267

G PDR

,

.

~

, .= -

'

..

Public Service Company of Colorado -2-

Enclosures: ,

.1. Appendix A - Notice of Violation

2. Appendix B - NRC. Inspection Report

50-267/86-23

cc w/ enclosures:

J.-W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19

'Platteville, Cq1orado 80651

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bcc to DMB (IE01)

bcc distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *RSB
  • Section Chief (RSB/ES) *J. R. Boardman
  • R&SPB *R. E. Ireland
  • MIS System *D. M. Hunnicutt
  • RSTS Operator
  • RIV File
  • w/766

f

1