ML20245H389

From kanterella
Revision as of 23:46, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-267/89-12 on 890601-0715 & Notice of Violation
ML20245H389
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/08/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245H391 List:
References
NUDOCS 8908170067
Download: ML20245H389 (2)


See also: IR 05000267/1989012

Text

__

_ _ _ - _ _ _ _ - - .

.

- ,

, .

AUG 8 t999

In Reply Refer To:

Docket: ,

50-267/89-12

Public Service Company of Colorado

ATTN: Robert O. Williams, Jr.

Senior Vice President, Nuclear Operations

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and

P. W. Michaud of this of fice during the period June 1 through July 15, 1989, of

i activities authorized by NRC Operating License DPR-34 for the Fort St. Vrain

. Nuclear Generating Station, and to the discussion of our findings with

Mr. A. C. Crawford and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included onsite followup of licensee event

reports, operational safety verification, monthly surveillance observation, and

monthly maintenance observation. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part.2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter. '

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the-Office of Management and Budget as required i

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OriginalSigned By:

Thomas P.Gwynn

James L. Milhoan, Director

Division of Reactor Projects

.

i

Enclosures: (see next page)

RIV: SRI RI DRP/B C:DRP/B  : RP

REFarrelI c PWMichaud RPMullikn TFWestermIn

f/J-/89 7 / 2-/89 f/2/89 T/2/89 )r0Lilhoan

8/g/89

8908170067 890808

PDR i\

O ADOCK 05000267

PNU

i

fE l

i

-

I'

L -

, ,

Public Service Company of Colorado -2-

.

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-267/89-12

cc w/ enclosures:

Fort St. Vrain Nuclear Generating Station

ATTN: C. Fuller, Manager

Nuclear Production Division

16805 WCR 19 1/2

Platteville, Colorado 80651

Fort St. Vrain Nuclear Generating Station

ATTN: P. Tomlinson, Manager.

Quality Assurance Division

16805 WCR 19 1/2

Platteville, Colorado 80651

Colorado Public Utilities Commission

ATTN: Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RR1 *R. D. Martin, RA l
  • Section Chief (DRP/B) * Project Engineer (DRP/B)
  • RPB-DRSS Lisa Shea, RM/ALF '
  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager (MS: 13-D-18)
  • RIV File *DRS
  • DRP
  • w/766

l

i

i

)

i

_]