IR 05000298/1988024

From kanterella
Revision as of 21:07, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Ack Receipt of Util 890522 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/88-24
ML20244D145
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/12/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8906160121
Download: ML20244D145 (2)


Text

_ -

_ _

,

_ - - - - .

.

__

e t

' 3

.,

+. a, =.

In Reply Refer To: M- '

' Docket:< 50-298/88-24 Nebraska Public Power District ATTN: George A. Trevors Division Manager'- Nuclear Support:

P.O. Box 499 -

Columbus, NE -68602-0499 Gentlemen:

.

Thank you for your letter, dated May 22,1989, in response to o'urtletter, dated April 24, 1989. We have Lno further questions at this time and wil review your corrective action during a future inspectio Sincerel %,,a g.,oj,,

E M d. A &

James L. Milhoan, Director Division _of Reactor Projects cc:

Cooper Nuclear Station ATTN: Guy Horn, Division Manager of Nuclear Operations-P.O. Box 98 Brownville, Nebraska 68321 *

Kansas Radiation Control Program Director Nebraska Radiation ' Control _ Program Directorf v

!

/

O j'

$pt Rf I:0PS er/cjg fC gfagfiardo D:DR LJCallan fg%i '

V JLMilhoan-g h/$/89 0 0/f/89~ 6/p891 (/q/89

.

8906160121 890612 , 8 DR ADOCK0500g8

- _ _ - - _ _ _ - _ - _ _ _

,.

^

.

.

.

{ .

Nebraska Public Power District -2-bec w/ enclosure:

-

bec to DMB (IE01)

J bec distrib. by RIV:

RRI R. D. Martin, RA Section Chief (DRP/C) Lisa Shea, RM/ALF RPB-DRSS MIS System

RIV File Project Engineer-(DRP/C)- 'j RSTS Operator DRP l

.

P. O'Connor, NRR Project Nanager (MS: 13-D-18) -l '

l

'

DRS ,

.D.' Hunter +

J. Gagliardo l

,

o i

.

i

!

j

,

t

_. . _ - _ . _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _

_ - - . ._ . _ - _ .

. - . - _ - - .. . _ _ _ _ _ . _ _ _ _

. ..

's - .

.,

. . ,

" .

GENERAL OFFICE Nebraska Public Power District

_ . .

""?sfoWa#*"^*nP**"" j q

%

~

NLS8900184 c g ,

May 22, 1989 I ty . -

- .:' l

,

!. MAY 3Il989 .

.

!

U.S. Nuclear Regulatory Commission -

ATTN: Document Control Desk i' j Washington, DC 20555 j i

Subject: Response to Inspection' Report 88-24-Cooper Nuclear Station-NRC Docket No. 50-298, DPR-46

<

References: 1) Letter from L. J. Callan (NRC) to G.. A. Trevors (NPPD) l dated April 24, 1989, same subject i 2) Letter from G. A. Trevors (NPPD) to USNRC dated j December 8,1988, same subject i

Gentlemen:

!

This letter is written in response to your letter dated April 24, 1989',  :

Reference 1, and revises the District's earlier : response to the . subj ect i Inspection Report and Notice of Violation, Reference l

!

Following is the statement of the violation and our response in accordance with 10CFR2.201-

Statement of Violation Failure to Adecuatelv Review Procedure Chanrea l The Cooper Nuclear Station Technical Speci 12 cation (TS) 6.2.1.B. requires in part, that the safety evaluations for changes to procedures shall be reported to and reviewed by the Safety Review and Audit Board to verify that such actions did not constitute an unreviewed safety questio Contrary to the above the safety evaluation for changes to normal, abnormal, maintenance, and emergency operating procedures, which were reviewed by the Station Operations Review Committee in accordance with TS 6.3.1, 6.3.2, 6.3.3, and 6.3.4,.were not being routinely provided to the Safety Review and Audit Board for their required review in meetings No. 115 through 130, dated Januar through September 198 This is a Severity Level IV Violatio (Supplement I) (298/8824-02)

~

'

-

d On ,v .s 0 ivvv IG-M4Q3 '

i -

- Powerful Pride in Nebraska

___ _

  • *

NLS8900184 C ' i ,Pags 2

-

'. -

May 22, 1989 Renson for Violation The violation occurred as a result of the District's misinterpretation of what constitutes a safety evaluation for changes to procedures. The District now agrees that the " Safety Evaluation Applicability review" conducted on every procedure change constituted a safety evaluation and under CNS Technical i Specification 6.2.1.B.4.a, these evaluations must be provided to end revicued by the Df. strict's Safety Review and Audit Board (SRAB).

Corrective Stens Which Have Been Taken and the Results Achieved Commencing with SORC Meeting S88-154, dated October 13 and 14, 1988 the SRAB began reviewing procedure change cover sheets completed in accordance with CNS Procedure 0.4, " Preparation, Review and Approval of Procedures". These cover sheets include the safety evaluation in questio Corrective Stens Taken to Avoid Further Violation As indicated in Reference 2, the District has revised CNS Procedure 0.4 to clarify the purpose of, and difference between, a preliminary and a detailed safety evaluatio To avoid further violations in this area, all preliminary and detailed safety evaluations will be presented to the SRAB for revie Date When Full Compliance Will be Achieved Full compliance will be achieved by June, 198 f Please contact me if you have any questions regarding this respons

Sincerely, l

i

!

l i

G. A. Trevors j Division Manager i Nuclear Support CAT /kew:jw cc: Regional Administrator USNRC - Region IV NRC Resident Inspector Cooper Nuclear Station