Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/90-12
ML20055C962
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/28/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9007030007
Download: ML20055C962 (2)


Text

.

le 'o

'

JUN 281980 In Reply Refer To:

Docket: 50-298/90-12 Nebraska Public Power District ATTN: George A. Trevors Division Manager - Nuclear Support P.O. Box 499 Columbus, Nebraska 68602-0499 -

Gentlemeti:

Thank you for your letter of June 14, 1990, in response to our let+,er and Notice of Violation dated May 15, 1990. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine

Sincerely, Original Signed By:

Es:au;l J. Cahs Samuel J. Collins, Director Division of Reactor Projects cc:

Nebraska Public Power District ATTN: G. D. Watson, General Counsel P.O. Box 499 Columbus, Nebraska 68601 Cooper Nuclear Station ATTN: Guy R. Horn, Division Manager of Nuclear Operations P.O. Box 98 Brownville, Nebraska 68321 Nebraska Department of Environmental Control ATTN: Dennis Grams, Director P.O. Box 98922 Lincoln, Nebraska 68509-8922

'

RIV:FRP LTRicket h C:FRPS BMurray f D:DRSS I D:

S lin

/e/ 4 90 , g790 fBBeat 6/p(/90'/ 4 e 9007030007 90062e <0 b PDR ADOCK 05000298 0 PDC

__ ..

c.- ,

4 0

.: o

.t ? ,.

.

!

' Nebraska Public Power District -2-

. ; Nemaha County Board of Commissioners ATTN: Larry Bohlken, Chairman Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Department of Health

'

Division of Radiological Health ATTN: Harold Borchart, Director L 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Kansas Radiation Control Program Director U.S. Nuclear Regulatory Commission ATTN: Senior Resident Inspector P.O. Box 218 Brownville, Nebraska 68321

'

U.S. Nuclear Regulatory Commission ATTN: Regional Administrator, Region IV n -611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 bec to DMB (IE06)

bec with licensee's letter:

DRP

-

Resident' Inspector Section' Chief, SEPS, DRP/C Lisa Shea, RM/ALF FRPS File DRS MIS System RIV File RSTS Operator Inspector .  ;

Section Chief, SEPS B. Beach Project Engineer, DRP/C  !

P. O' Conner, NRR Project Manager

<

l ,'

L L

_ _ _ _ _ _ _ _ . _ . _ _ _ . . ,

.

,

. e

, a
'

- GENERAL OFFict t

  • O. DOX est. COLuuses NEenAsgA eseog.nese

~

'

Nebraska Public Power District

.- .

. -

  • MP.J.'.'.'" . .

!

y CNS$906750 f June 14, 1990 . - - .

t j J

$bb i ,

U. S. Nuclear Regulatory Commission I g {8\@ k Attenti$n: Document Control Desk  ; \  ;

Washington, DC 20555 Subject: NPPD response to NRC Inspection Report 50 298/90 4 2--

Cooper Nuclear Station ,

'

Docket No. 50 298, DPR 46 t

Gentlemen:

This letter is written in response to your letter dated May 15, 1990, transmitting Inspection Report 50 298/90 12. Therein you indicated that one of our activities was in violation of NRC requirement Following is a statement of the violation and our respons STATEMENT OF VIO1ATION Unaunlified Personnel Technical Specification 6.1.4 requires that the minimum qualifications of personnel meet the requirements as described in the American National Standards Institute (ANSI) N 18.1 197 ANSI N.18.1 1971, requires that technicians in responsible positions shall have a minimum of 2 years of working experience in their specialty. This experience involves a minimum of 4,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> completed in noc less then 80 week Contrary to the above, on April 19, 1990, the inspector identified an individual with only 2,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of Health Physics experience performing the duties of a Senior Health Physics Technician during the period of March 12 27, 199 This is a Severity Level IV violation. (Supplement IV)(298/9012 01)

Ranson for the Violation A contract Junior Health Physics Technician was promoted to a Senior Level Health Physics Technician. This promotion did not txplicitly use current industry practices for determinin5 acceptable health physics experienc Instead, an allowance for health physics related work experience obtained while assigned as a Utility worker was credited to the individual involved, ff-90 <(ql ~ O A h / in c. ~> f 7uuw/ /(J() / / c-}l}l) *

, = n .- . _ _ = _ - . . . _ . = - ._

- .

- _ - - . . _ . _ . = _ = . - . . _ . . ,

-

^

.

.- %

, . 0

.. < ,,

Document Control Desk

-

June 14, 1990 Page 2 Corrective Stees Which Have Been Taken and the Results Achieved Upon receipt of the Notice of Violation, tha individual's Senior Technician status was rescinded. A review of the work performed by the individual was also conducte No radiation protection deficienciec were foun It should be noted that radiction protection supervision was present at all times when the individual was assigned Senior Radiation Protection Technician dutie Corrective Stone Which Will Be Taken to Avoid Further Violations A detailed procedure describing the qualification requirements for contract Radiation Protection Technicians will be developed and implemented to ensure that the future hiring and promotion of contractor Radiation Protection Technicians meets current industry standards for Senior Technician positions. This station procedure will include specifications for radiation protection experience that can be credited towards qualification. Qualification for Senior Level Technicians will require a minimum of two years of working experience in radiation protection of which 4,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of this experience shall be obtained in not less than 80 weeks. This procedure will ensure compliance to current industry practice in this are Date When Pull Contliance Will Be Achieved NPPD is currently in full complianc The above mentioned procedure will be developed, approved, and implemented by October 199 Should you have any questions concerning this matter, please contact my offic

Sincerely,

G. A. Trevors Division Manager Nuclear Support CAT:JVS:j s cc: k ogional Administrator USNRC - Region IV NRC Resident Inspector Cooper Nuclear Station l