'In Reply Refer To:
.
,f
Docket: 50-298/89-24-
,
s
Nebraska Public Power District
ATTN:, George A. Trevers
. Division Manager - Nuclear Support.
.P.O. Box 499
Columbus, Nebraska 68602-0499
Gentlemen:
This refers to the: inspection conducted by Messrs. A. Singh, J. E. Johnson and
M. E. Murphy.of this office and Messrs. D. Arnold of Rolf Jer = n and Associates
and H. Thomas of Science Applications International Corporation (SAIC), during -
the period July 31 through August 4, 1989, of activities authorized by Operating
License DPR-46 for the. Cooper Nuclear Station, and to the. discussion of our
findings with Mr. G. R. Horn and other members of your staff at the conclusion
of-the inspection.
Areas examined during the inspection included establishment and implementation
of the fire protection program and postfire safe shutdown capability
. reverification. Within these creas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. The inspection findings are
documented-in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. However, in accordance with Section V.A of the
KRC's Enforcement Policy (10 CFR Part 2, Appendix- C), no citation is being
issued for the violation described in paragraph 2.a(2) of the enclosed
inspection report.-
Also, it was found -that certain of your activities appeared to deviate from a
comitment made to the NRC. This item and reference to the commitment is
identified in the enclosed Notice of Deviation. You are requested to respond
to this deviation in writing. Your response should be based on the specifics
contained in the Notice of Deviation enclosed with this letter.
The respcnse requested by-this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:RI:PSS*
RI:PSS*
C:PSS*
RI:TPS*
C:TPS*
D:DlS*
R
ASingh:lm
CJohnson
TStetka
MMurphy
WSeidlef
LJCallan
JLMilhopn
/ /69
/ /89
/ /89
/ /89
/ /8
A/g/89
/p9
- previously concurred
-[gp[
-
89091;0155 8?o912
ADOCM 05000298
Q
FDC
f
!
i
- _ _ - _ - _ _ _ _ -
_.
.
.
.
.; .
.
-
. . ,
,
-.
Nebraska Public Power District
-2-;
.
.
Should'you have any questions.concerning:this inspection, we will be pleased to
'
-discuss them with you
t:
Sincerely.
,,
$1Arigin411 Signed 18y
. im&Mihosts
'
' James L. Milhoan, Director
<
,
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Deviation
"
2.-
Appendix B - NRC Inspecticn Report
50-298/89-24
cc w/ enclosures:
Cooper Nuclear Station
- ATTN
- Guy Horn, Division Manager
of Nuclear Operations-
P.O. Box'98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
>
,
Nebraska Radiation Control Program Director-
bec to DMB..(IE01) bec distrib. by RIV:
- RRI
- R.:D. Martin, RA
-*Section Chief (DRP/C)
Lisa Shea, RM/ALF
- RPB-DRSS
- MIS System
, , ,
1
- RIV File
- ProjectEngineer(DRP/C)
,
- RSTS Operator
- DRP
13-D-18)
- P.'C'(Connor,.NRCProjectManager(MS:
- DRS 3 copies)
- C. Johnson
- A. Singh'
- M. Murphy
- W. Seidle
- 1. Stetka
- G. Sanborn
- w/766
L