Forwards Insp Rept 50-298/89-24 on 890731-0804 & Notice of Deviation
ML20247G853
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/12/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20247G857 List:
References
NUDOCS 8909190155
Download: ML20247G853 (2)


See also: IR 05000298/1989024

Text

_

..

4

..

<

q

7

,

,

'

.

'In Reply Refer To:

.

,f

Docket: 50-298/89-24-

,

s

Nebraska Public Power District

ATTN:, George A. Trevers

. Division Manager - Nuclear Support.

.P.O. Box 499

Columbus, Nebraska 68602-0499

Gentlemen:

This refers to the: inspection conducted by Messrs. A. Singh, J. E. Johnson and

M. E. Murphy.of this office and Messrs. D. Arnold of Rolf Jer = n and Associates

and H. Thomas of Science Applications International Corporation (SAIC), during -

the period July 31 through August 4, 1989, of activities authorized by Operating

License DPR-46 for the. Cooper Nuclear Station, and to the. discussion of our

findings with Mr. G. R. Horn and other members of your staff at the conclusion

of-the inspection.

Areas examined during the inspection included establishment and implementation

of the fire protection program and postfire safe shutdown capability

. reverification. Within these creas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. The inspection findings are

documented-in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. However, in accordance with Section V.A of the

KRC's Enforcement Policy (10 CFR Part 2, Appendix- C), no citation is being

issued for the violation described in paragraph 2.a(2) of the enclosed

inspection report.-

Also, it was found -that certain of your activities appeared to deviate from a

comitment made to the NRC. This item and reference to the commitment is

identified in the enclosed Notice of Deviation. You are requested to respond

to this deviation in writing. Your response should be based on the specifics

contained in the Notice of Deviation enclosed with this letter.

The respcnse requested by-this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:RI:PSS*

RI:PSS*

C:PSS*

RI:TPS*

C:TPS*

D:DlS*

R

ASingh:lm

CJohnson

TStetka

MMurphy

WSeidlef

LJCallan

JLMilhopn

/ /69

/ /89

/ /89

/ /89

/ /8

A/g/89

/p9

  • previously concurred

-[gp[

-

89091;0155 8?o912

PDR

ADOCM 05000298

Q

FDC

f

!

i

- _ _ - _ - _ _ _ _ -

_.

.

.

.

.; .

.

-

. . ,

,

-.

Nebraska Public Power District

-2-;

.

.

Should'you have any questions.concerning:this inspection, we will be pleased to

'

-discuss them with you

t:

Sincerely.

,,

$1Arigin411 Signed 18y

. im&Mihosts

'

' James L. Milhoan, Director

<

,

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Deviation

"

2.-

Appendix B - NRC Inspecticn Report

50-298/89-24

cc w/ enclosures:

Cooper Nuclear Station

ATTN
Guy Horn, Division Manager

of Nuclear Operations-

P.O. Box'98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

>

,

Nebraska Radiation Control Program Director-

bec to DMB..(IE01) bec distrib. by RIV:

  • RRI
  • R.:D. Martin, RA

-*Section Chief (DRP/C)

Lisa Shea, RM/ALF

  • RPB-DRSS
  • MIS System

, , ,

1

  • RIV File
  • ProjectEngineer(DRP/C)

,

  • RSTS Operator
  • DRP

13-D-18)

  • P.'C'(Connor,.NRCProjectManager(MS:
  • DRS 3 copies)
  • C. Johnson
  • A. Singh'
  • M. Murphy
  • W. Seidle
  • 1. Stetka
  • G. Sanborn
  • w/766

L