Text
F
,
["%,\\
UNITED STATES
4
4
[
NUCLEAR REGULATORY COMMISSION
i .
I
$
E
REGloN IV
\\,
611 RYAN PLAZA DRIVE, SUITE 400
l
4 , ,,
ARLINGTON, TEXAS 76011-8064
,g
l
OCT - 8 1999
J. H. Swaites, Vice President of
Nuclear Energy
Nebraska Public Power District
P.O. Box 98
Brownville, Nebraska 68321
SUBJEC~ : NRC INSPECTION REPORT NO. 50-298/99-03
Dear Mr. Swailes:
This refers to the inspection conducted on August 23 to 27 and September 7 to 10,1999, at the
Cooper Nuclear Station facility. The purpose of the inspection was to ensure that the licensee
had effective programs for (1) identifying, evaluating, and correcting problems which could
impact safe plant operations and (2) correcting and limiting non-compliance with NRC
regulations. The enclosed report presents the results of this inspection.
On the basis of the sample reviewed, your corrective action program was generally
implemented with an appropriate threshold for identifying and classifying adverse conditions.
During the review of problem identification reports and other associated corrective action
documents, the inspectors observed untimely long-term corrective actions associated with the
operation of the residual heat removal system, which resulted in a operable but degraded
condition for years, in addition, the logic testing associated with the residual heat removal
system was an example of a failure to implement prompt and adequate corrective actions
similar to issues identified in a previous noncited violation documented in NRC Inspection
Report 50-298/99-04.
j
Based on the results of this inspection, the NRC has determined that two Severity Leve!IV
'
violations of NRC requirements occurred. These violations are being treated as noncited
violations, consistent with the Interim Enforcement Policy for pilot plants. These noncited
violations are described in the subject inspection report, if you contest the violation or severity
level of these noncited violations, you should provide a response within 30 days of the date of
this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,
ATTN: Docurnent Control Desk, Washington DC 20555-0001, with copies to the Regio..al
Administrator, U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive,
Suite 400, Arlington, Texas 76011, the Director, Office of Enforcement, United States Nuclear
Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident inspector at the
Cooper Nuclear Station facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
I
enclosure, and your response, if requested, will be placed in the NRC Public Document Room.
i
9910130217 991000
ADOCK 05000298
G
L
j
, ,
l. s
^
- -
i
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
,
-
'
J3hn L. Pellet, Chief
Operations Branch
Division of Reactor Safety
Docket No.:
50-298
License No.: DPR-46
Enclosures:
.. NRC Inspection Report No.
50-298/99-03
cc w/ enclosures:
G. R. Horn, Senior Vice President
of Energy Supply
Nebraska Public Power District
'
141415th Street
Columbus, Nebraska 68601
John R. McPhail, General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, Nebraska 68602-0499
i
B. L. Houston, Nuclear Licensing
and Safety Manager
Nebraska Public Power District
P.O. Box 96
Brownville, Nebraska 68321
Dr. William D. Leech
Manager - Nuclear
MidAmerican Energy
907 Walnut Street
P.O. Box 657
Des Moines, Iowa 50303-0657
l
l
l
I
g,
,
,
&.+
1 Nebraska Public Power District
-3 .-
'
Ron Stoddard
'
Lincoln Electric System -
.1040 O Street-
P.O. Box 80869
Lincoln, Nebraska 68501-0869 -
- Michael J. Linder, Director
' Nebraska Department of Environmental
Quality .
P.O. Box 98922
Lincoln, Nebraska 68509-8922 ~
i
Chairman .
Nemaha . County' Board cf, Commissioners
Nemaha County Courthouse
'.1824 N Street
Auburn, Nebraska 68305
Cheryl K. Rogers, Program Manager
Nebraska Health and Human Services System
Division of Public Health Assurance
Consumer Services Section
,
301 Centennial Mall, South
-
P.O. Box 95007
Lincoln, Nebraska'68509-5007
Ronald A. Kucera, Director
, of Intergovernmental Cooperation
< Department of Natural Resources
i P.O. Box 176
~ Jefferson City, Missouri 65102
' Jerry Uhlmann, Director
- State Emergency Management Agency
P.O. Box 116
Jefferson City, Missouri 65101
t
l'
!
,
!-
- f
).-
l
Nebraska Public Power District
-4 .
E Mail report to T. Frye (TJF)
E-mail report to D. Lange (DJL)-
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail all documents to Jim isom for Pilot Plant Program (JAI)
E-Mail all documents to Sampath Malur for Pilot Plant Program (SKM)
i
bec to DCD (IE01)
bec distrib, by RIV:
Regional Administrator
Resident insp3ctor
DRP Director
RiV File
DRS Director
RITS Coordinator
Branch Chief (DRP/C)
Project Engineer (DRP/C)
)
,\\
i
'
'
DOCUMENT NAME: R:\\_cns\\Cn903rp.pcg
To receive copy of document, Indicate in box: "C" = Copy without enclosuret "E" = Copy with enclosures *N" = No copy
SRE:OB
A
RI:PBC
_l.} D:PBC
, .
C:OB
SRE:OB
,
.
PCGage /Imb %
SLMcCrorf'
MCHay@
KRSMarschalCWl JLP_ellet
'
09//f99
09/ 199
09/tf99 '
,pl 09/$/99
%/8/99
OFFICIAL RECOp COPY
M
Pw 1atril@
120043
o
r
4
, . .
Nebraska Public Power District
-4-
E-Mail report to T. Frye (TJF)
E-mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail all documents to Jim Isom for Pilot Plant Program (JAI)
l
E-Mail all documents to Sampath Malur for Pilot Plant Program (SKM)
bec to DCD (IE01)
. bec distrib. by RIV:
,
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/C)
Project Engineer (DRP/C)
,
,
1
..
!
l
l
DOCUMENT NAME: R:\\_cns\\Cn903rp.pcg
. To receive copy of document, Indicate in box: "C" = Copy without enclosure l "E" = Copy with enclosures "N" = No copy
l
SRE:OB
SRE:OB
fg
RI:PBC
_l.jp:PBC
, .
C:OB
,
,
PCGage / Imb R
SLMcCrotF" MCHay@
KRSMarschaD9fl JL9ellet
09//f99
09hT99
09hh99'
m 09$99
Q@99
'
OFFICIAL RECOp COPY
s $a
r48
l
[
l
!
E,
J