Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC
ML20209A722
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/23/1999
From: Newman L
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209A727 List:
References
NLS990068, NUDOCS 9907060122
Download: ML20209A722 (3)


Text

,

Nebraska Public Power District Nebraska's Energy Leader NLS990068 June 23,1999 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Submittal of Revised Technical Specification Pages Cooper Nuclear Station, NRC Docket 50-298, DPR-46

Reference:

Letter (No. NLS980200) to USNRC Document Control Desk from J. H. Swailes (NPPD) dated March 1,1999," Proposed Change to CNS Technical Specifications; Reactor Protection System Instrumentation" The purpose of this letter is to submit to the Nuclear Regulatory Commission (NRC) the revised pages to a proposed change to the Cooper Nuclear Station (CNS) Technical Specifications (TS) previously submitted per the above reference. The revised TS pages (TS Pages 3.3-4 and 3.3-6),

in both mark up and type written form, replace Page 3.3-6 of the above reference. These pages are being submitted in response to recent telephone communications (most recently June 15, 1999) between the NRC and the CNS Nuclear Licensing & Safety (NL&S) Manager.

In the above reference, the proposed change to TS page 3.3-6 consisted of adding a footnote to Table 3.3.1.1-1, Function 2.b. stating that " calibration of the recirculation loop flow transmitters is only required every 18 months." Per the above mentioned discussions with the NRC, the attached pages replace the submitted change with the following revised changes:

1) Page 3.3-4 Surveillance Requirement (SR) 3.3.1.1.10, Note 1. was revised to state that recirculation loop flow transmitters are excluded from the requirements of this SR.
2) Page 3.3-6 SR 3.3.1.1.12 was added to the list of applicable SRs associated with Function 2.b.

9907060122 990623"

\\ ('

\\ kj goa Apocn O g i

3 Cooper Nudear Station P.O. Box 98/ Brownvulle. NE 68321D098 Telephone: (402) 825-3811/ Fax: (402) 825 5211 http //www nppd com

. - _ _ __ w

i i

!?LS990,068

- Jur,e 23,1999 Page 2 of 2 Per discussion with the NRC, it was recognized that these changes accomplish the same actions as the changes described in the above reference. The specific changes proposed above represent a format that is more consistent with the format ofImproved Technical Specifications. Because there is no change in intent, neither the discussion nor the significant hazards determination contained in the above reference are affected.

Should you have any questions regarding the specific changes, please contact me.

Sincerely, U"3 Larry N an

- NL&S Manager l

/dnm Attachmeni cc:

Regional Administratorw/ attachment USNRC - Region IV Senior Project Manager w/ attachment -

- USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/ attachment USNRC Environmental Health Division - Program Manager w/ attachment

- Nebraska Department of Health 1

- NPG Distribution w/o attachment i

e

VI.

, ATTACHMENT 3 LIST OF NRC COMMITMENTS l

l h

Correspondence No:

NLS990068 The following table identifies those actions committed to by the District in i

this document.

Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify l

the NL&S Manager at Cooper Nuclear Station of any questions regarding this L

document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None PROCEDURE NUMBER 0.42 REVISION NUMBER 6 l