,T,
,
aL*
.
r
As .8 590
In. Reply Refer To:
Docket:> 50-298/90-26
,
Nebraska Public Power District.
ATTN: George A. Trevors, Senior Staff
Advisor'- Nuclear Power Group
P.O. Box 499
Columbus, Nebraska 68602LO499
'
- Gentlemen:
This refers to the ins)ection co.iducted by Messrs. W. : R. Bennett,-G. A. Pick. .
R. V. Azua, and R. E.
arrell of this ..ffice during the-period June 16 through.
July.15, 1990, of activities auths,;ized by:NRC Operating License DPR-46 for -
Cooper Nuclear Station,' and to th<t discussion,of our findings with Mr.~ J.
M.--
l
> Meacham and other members of tho eant staff at= the conclusion of the inspection.
9
Areas examined during the inspection included operational' safety verification,.
!
monthly surveillance observation..montaly maintenance observations, onsite '
followup of written reports, engineered safety features walkdown, and in-office
.,
review of event reports. Within these areas, the: Inspection consisted of
!
selective examination of procedures avi representative records, interviews
with personnel, and observations by the inspectors. The inspection findings
are documented in the enclosed inspection report.
,
Within the scope of the inspection,,no violations:or deviationsLwere
identified.
1
Should you have any questions concerning this inspection,-we will be pleased
i
-
to discuss them with you.
1
Sincerely,.
"
1
OdginalSloned By:
Thomas P.Gwynn
.
Samuel J. Collins. Director
Division of Reactor Projects
- 3
1
Enclosure:
.7pendix - NRC Inspection Report
j
50-298/90-26 w/ Attachment
i
,
a
900817oo31 900000
%r
.
^
DR
ADOCK 050
98
,
RVAzua/C:DRPfC
N
= !
'RIV:RI
DRP/
GAPick/sn Bennett
GLConstable
RSJCollins
8/t./90
8/t-/90
8/ 2 /90
8/ 2./90
J8/T/90
'\\L
000101
_
_ __
e
<
,
,
l
.1
,'h-
x
g
L
. ,
. Nebraska Public Power District'
<2-
..
< cc w/ enclosure:
Nebraska.Public Power District
,
ATTN:
G. D. Watson, General' Counsel.
t
P.O.~ Box 499
Columbus, Nebraska 68602-0499-
i
Cooper Nuclear Station;-
' ATTN::. Guy R. Horn : Nuclear.
Power Group Manager:
1.
~P.O. Box 98
.
'
Brownville, Nebraska 68321-
Cooper Nuclear Station
.
.
ATTN: John M. Meacham, Division
a
Manager, Nuclear Operations
,'
P.O.' Box 98
- Brownville,' Nebraska 68321
l-
Nebraska Department of Environmental
L
Control
u
ATTN:- Dennis Grams,' Director
P.O. Box =98922
l
Lincoln, Nebraska 68509-8922
Nemaha County Board of Comissioners -
l
ATTN: ; Larry Bohlken, Chairman
!- '
Nemaha County Courthouse
l
1824 iN Street -
I'
Auburn,ENebraska 68305
-
Department of Health
,
Division of Radiological Health
- !
ATTN:4 Harold Borchart, Director
'
-301 Centennial Mall',' South
- P.O. Box 95007
.
Lincoln, Nebraska 68509-5007
.!
Kansas Radiation Control Program Director.
U.S. Nuclear Regulatory Comission
ATTN: Senior Resident Inspector
P.O. Box 218
Brownville, Nebraska 68321
U.S. Nuclear Regulatory Comission
l
! ATTN:
Regional Administrator. Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas- 76011
bectoDMB(IE01)
.
.
,__ _-_____-__-- .
w
- '
,e
.i!*
'-
4
.
Neb'raska Public Power' District ~
-3-
!
y
bec distrib, tur RIV:
I
- R. D. Martin
- Resident Inspector
o
- SectionChief~(DRP/C)
Lisa.Shea,-RM/ALF
- DRSS-FRPS
- MIS System
'
- RIV File:
- Project Engineer (DRP/C)
-*RSTS Operator
- DRP
3
- P. O'Connor,' NRR Project ManagerJ (MS:
11-D-23): *DRS
- 11
G. A. Pick
1
- w/766
R
1
i
6
-
,
,. )
l
<
1
4
S
'y
'
d
'}
-
i
l
.
1
-
.4
.
.
t
>
?
(
1
. .
.