Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl
ML20209B897
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/01/1999
From: Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209B901 List:
References
NLS990069, NUDOCS 9907080258
Download: ML20209B897 (2)


LER-2099-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl
Event date:
Report date:
2982099005R00 - NRC Website

text

., s N

Nebraska Public Power District NLS990069 Nebraska's Energy Leader July 1,1999 I U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Licensee Event Report No. 1999-005 Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The subject Licensee Event Report is forwarded as an enclosure to this letter.

Sincerely, M. F. Peckham Plant Manager

/rar Enclosure cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident inspector USNRC' NPG Distribution I INPO Records Center l'h )h p b'

/

W. Turnbull MidAmerica Energy 9907000258 990701 PDR ADOCK 05000298 8 PDR Cooper Nudear Station

{1* * i 'E** PO. Box 98/ Brownvolle. NE 68321-0098 Telephone: (402) 825-38H / Fan: (402) 82S-52H http //www nppd com

,l , ATTACHMENT 3 LIST OF NRC COMMITMDITS

, l Correspondence No: NLS990069 The following table identifies those actions committed to by the District in this i document. Any other actions discussed in the submittal represent intended or  !

planned actions by the G3 strict. They are described to the NRC for the NRC's f information and are not regulatory commitments. Please notify the NL&S Manager at j Cooper Nuclear Station of aOy questions regarding this document or any associated j regulatory commitments.

)

l t

COMMITTED DATE l COMMITMENT OR OUTAGE i CNS will develop guidance on how to satisfy LSFT requirements for different circuit configurations and functions (e.g., inhibit, permissive, bypass, manual, October 7, ;999 etc.), capture in a controlled document, and incorporate into the modification and procedure chance processes.

CNS will identify any open items generated during the LSFT and STVP review that were closed to "no further action required" on the basis that they did not support a September 1, 1999 Technical Specification function and confirm these conclusions are still valid under Improved Technical Specifications.

CNS will identify ECCS logic circuits that contain bypass and override control switches in parallel with automatic October 7, 1999 functions and confirrn LSFT requirements are acceptably met.

CNS will perform a review of Surveillance Procedures to confirm they acceptably demonstrate LSFT surveillance requirements, based on the detailed definition of LSFT October 7, 1999 j requirements, for a selected set of Technical Specification functions.

CNS will revise surveillance procedure 6.RHR.301 prior t February 28, 2000 next usage to include steps to confirm the override contacts of keylocked switches 10A-S18A cnd B are open.

l PROCEDURE NUMBER 0.42 l REVISION NUMBER 6 l PAGE 9 OF 13 l l