Text
-_
.
..
..
- ,
'
.
JUL 2 41990
In Reply Refer To:-
Docket: 50-298/90-27
,
Nebraska Pub 1'ic Power District
~
ATTN: -George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
,'
Colunbus, Nebraska 68602-0499
Gentlemen:
-
.
--
.
i
This refers to the inspection conducted by Messrs..A. Singh and H. E. Murphy-of.
!
this office during the period July 9-13, 1990, of activities authorized by NRC'
Operating License DPR-46 for Cooper Nuclear Station, and to the discussion of
- 1
'
our' findings with Mr. J. Meacham and:other members of your staff at the
conclusion of-theiinspection.-
The area examined during the inspection included postrefueling startup. testing.:
!
Within these areas, the inspection consisted of selective examination of
H
'
procedures and r?presentative records.tinterviews'with-personnelfand' observations
'
by the inspectors. The inspection findings are documented intthe enclosed
inspection report.
,
i
Within the scope of the inspection, no-violations or deviations were; identified..
1
We have also examined actions' you have taken~ with regard to previously< identified
1
inspection findings. The status of these items are identified in paragraphs 2
]
and 3 of the enclosed report.
!
The issue identified and discussed in paragraph 3 appears to, result from a
1
i
misinterpretation of your corrective action in response to a previously
'
identified deviation in NRC Inspection Report 50-298/88-18.- The corrective
action implemented was not the some as that stated in your response. dated
i
August 16, 1988, to NRC. This could be an indication of a weakness:in the
area of commitment identification and verification.
Should you have an/ questions concerning this inspection, we wi11 be pleased to
!
'
discuss them with you.
Sincerely,
O
Original Signed By:
Samuel J. Collins
Samuel J. Collins, Director
'
Division of Reactor Projects
Enclosure:
(see next page)
RIV:RI:TPS*
RI:TPS*
C:TPS*
D:DRS *
D;DR
ASingh:nh
MEMurphy
WCSeidle
LJCallan
C
ns
/ /90
/ /90
/ /90
/ /90
- previously concurred
j
9008010220 900724
E
ADOCK 05000298
- k'
O
-]
. .
-,
.
-
-
-
-
.
i1'
7 g
'_ f
8
s
,
,
"
,.
,
Nebraska Public Power District-.
-2-
.
.'
Enclosure:.
_.
l
Appendix - IIRC Inspection Report
'
50-298/90-27 w/ Attachment
'
cc w/ enclosure:
.
Nebraska'Public Power District-
ATTN:' - G. D.- Watson, General Counsel
P.0, Box 499
,
Columbus, Nebraska .68601.
Cooper Nuclear Station
. ATTN: Guy'R. Horn, Nuclear-
,
Power Group Manager
P.O. Box 98-
!
Brownville, Nebraska ~68321
Nebraska Department ofLEnvironmental
Control
. ATTN: Dennis Crams, Director
P.O. Box 98922
Lincoln, Nebraska, 68509-8922
l
Nemaha County Board.of Comissioners.
l
ATTN: Larry Bohlken, Chairman
Nemaha County Courthouse
1824 N Street
i
Auburn, Nebraska 68305
Department of Health
Division'of Radiological Health.
ATTN: Harold Borchart, Director
+
301 Centennial Mall, South
r
P.O.-Box 95007
Lincoln, Nebraska 68509-5007
l'
Kansas Radiation Control Program Director
'
U.S. Nuclear Regulatory Comission :
ATTN: Senior Resident Inspector
P.O. Box 218
..
Brownville, diebraska 68321
U.S._Nucleat Regulatory Commission
.
ATTN: Regional Administrator, Region.IV
1
611 Ryan Pitza Drive, Suite 1000
Arlington,' lexas 76011
,
,
-r
y
.
- ,
e
4
.
_
_
.
._
_
_
_
_
_
_
,
,
-
.y
r,
-
-
.
.
'
.
.
,
,
..
.
-
k
1
p-
Nebraska Public Power District.
-3 -
'!! -
,
,
--
,
becto.DMB(IE01)-DRS
l
bec distrib, by RIV:
)
y'
- R..D. Martin
- Resident Inspector
~
- SectionChief-(DRP/C)
Lisa Shea, RH/ALF
- DRSS-FRPS
- MIS System .
.
'
_ RIV File-
- ProjectEngineer-(DRP/C)
- RSTS Operator
- DRP
- *P.O'Connor,NRRProjectManager(MS: ~11-D-23)
4
'
=*DRS
- A. Singh
- M. Murphy
- W. Seidle
- w/766
i
-\\\\'
4
,
k
l
l
1:
,
-
,
'
I
i
'
.
.
.