ML20212J506

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs
ML20212J506
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/27/1999
From: Marschall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20212J511 List:
References
50-298-99-07, NUDOCS 9910050182
Download: ML20212J506 (5)


See also: IR 05000298/1999007

Text

.

UNITED STATES

-

3

p5 "%g% NUCLEAR REGULATORY COMMISSION

3  ;

T. 1 g REGloN IV

611 RYAN PLAZA DRIVE, sulTE 400

l

,,,g ARLINGTON, TEXAS 76011-8064

SEP 2 71999

J. H. Swailes, Vice President of

Nuclear Energy

Nebraska Public Power District

P.O. Box 98

Brownville, Nebraska 68321

SUBJECT: COOPER NUCLEAR STATION INSPECTION REPORT 50-298/99-07

Dear Mr. Swailes:

This refers to the inspection conducted July 18 through August 28,1999, at the Cooper Nuclear

Station. The enclosed report presents the results of this inspection.

The inspectors examined activities conducted under your license es they relate to safety and to

compliance with the Commission's rules and regulations and with Ine conditions of your license.

Within these areas, the inspectors examined a selection of procedures and representative

records, observed activities, and conducted interviews with personnel. Specifically, the

inspectors focused on the implementation of your reactor safety and emergency preparedness

programs. During this inspection, the inspectors did not identify any significant findings.

4

The results of this inspection were discussed on August 26,1999, with you and other members

of your staff.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room. l

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

@DaSA

Charles S. Marschall, Chief

1 8

l

'

Project Branch C

Division of Reactor Projects

Docket No.: 50-298

License No.: DPR-46

l

Enclosure:

'

NRC Inspection Report

50-298/99-07

9910050182 990927 I

PDR ADOCK 05000298

G PDR

l' l

L i

...

Nebraska Public Power District -2-

cc w/ enclosure:

G. R. Horn, Senior Vice President

of Energy Supply

Nebraska Public Power District

- 141415th Street

'

Columbus, Nebraska 68601

John R. McPhail, General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, Nebraska 68602-0499

B. L. Houston, Nuclear Licensing

and Safety Manager

Nebraska Public Power District

P.O. Box 98 ,

Brownville, Nebraska 68321 l

Dr. William D. Leech

Manager - Nuclear

MidAmerican Energy '

>

907 Walnut Street

P.O. Box 657

Des Moines, Iowa 50303-0657

Ron Stoddard

Lincoln Electric System

1040 O Street

P.O. Box 80869

Lincom Nebraska 68501-0869

Michael J. Linder, Director

Nebraska Department of Environmental

Quality -

' P.O. Box 98922

Lincoln, Nebraska 68509-8922 1

Chairman

Nemaha County Board of Commissioners

Nemaha County Courthouse

.1824 N Street

Auburn, Nebraska 68305

y

..<

.

..

i-

L Nebraska Public Power District -3-

-

.(Cheryl' K. Rogers, Program Manager

L ~ Nebraska Health and Human Services System -

'

! .' Division of Public Health Assurance

LConsumer. Services Section

301 Centennial Mall, South

P.O. Box 95007 ' .

Lincoln, Nebraska. 68509-5007

l

Ronald A. Kucera, Director -

of Intergovernmental Cooperation

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

Jerry Uhlmson, Director

State Emergency Management Agency -

P.O. Box 116

LJefferson City, Missouri 65101'

Vick L. Cooper, Chief

'

Kansas Department of Health

and Environment

Bureau of Air and Radiation

. Radiation Control Program, RCP

Forbes Field Building 283

Topeka, Kansas 66620

l

a.

l

e

.

I

.

.

Nebraska Public Power District -4-

SEP 2 71999

E-mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT)

E-Mail report to Jim Isom for Pilot Plant Program (JAI)

E-Mail report to Sampath Malur for Pilot Plant Program (SKM)

bec to DCD (IE01) <

1

bec distrib. by RIV:

Regional Administrator Resident inspector f

l

DRP Director RIV File i

DRS Director RITS Coordinator

Branch Chief (DRP/C)

Branch Chief (DRP/TSS)

'

Project Engineer (DRP/C) I

l

l

l

1

DOCUMENT NAME: R:\_CNS\CN907RP.MHM.wpd

To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures 'N" - No copy

RIV:RI:DRP/C Rl:DRP/A SRI SPE:DR5!/Eg PE/DRP/B

MCHay (folo WCSifre GMh1 MHMillerfF4n GAPick W/M RVAzua @@

C:DRP/C

IuTau sk h I '

CSMarschall @

9/7,1 /99

OFFICIAL RECORD COPY

,

,

4

.

Nebraska Public Power District -4-

SEP 2 71999

E-mail report to D. Lange (DJL)

E-Mail report to NRR Event Trackirg System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

E Mail report to Jim Isom for Pilot Plant Program (JAI)

. E-Mail report to Sampath Malur for Pilot Plant Program (SKM)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director RIV File

DRS Director RITS Coordinator

Branch Chief (DRP/C)

Branch Chief (DRP/TSS)

Project Engineer (DRP/C)

,

DOCUMENT NAME: R:\_CNS\CN907RP.MHM.wpd

To receive copy of document, indicate in box: "C" = Copy without enclosures 'E" = Copy with enclosures *N" = No copy \

RIV:RI:DRP/C RI:DRP/A l SRI SPE:DRP/Eg f PE/DRP/B I

MCHay CPlo WCSifre GM b1 MHMiller@4t., GAPick WF /M RVAzua @@

"

9/~L1/99 \MM u:w 9/d /99 h e-m.\ 9/21/99 %klow 9/f7/99 LAWS /2'7/99 H Wuin

C:DRP/C 7

CSMarschall($fP.

9/Z'\ /99

OFFICIAL RECORD COPY

C50051