ML20212C492

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves
ML20212C492
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/15/1999
From: Mcdonald J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212C498 List:
References
NLS990093, NUDOCS 9909210302
Download: ML20212C492 (2)


Text

- -

N Nebraska Public Power District Nebraska's Energy Leader NLS990093 September 15,1999 U. S. Nuclear Regulatory Commission Attention: Document Control Desk i

Washington, D.C. 20555-0001 Gentlemen:

Subject:

Monthly Operating Status Report for August 1999, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for August 1999. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of August. In accordance with Technical Specification 5.6.4, this report also includes documentation ofchallenges i

to the safety / relief valves.

Should you have any comments, or require additional information regarding this report, please contact me.

Sincerely,

^

1 b#

Jo n A. Mcdonald lant Manager JAM:lb Enclosures cc: NRC Regional Administrator NRC Senior Resident Inspector

- ANI Library R. W. Beck and Associates J. M. Cline j

Cg' 4,J A. L. Dostal

,l o1008

. J. W. Dutton M. G. Farschon R. L. Gtmim INPO Records Center Cooper Nudear Station Po. Box 98/ Brownvilie. NE 68321D098

~ * *

'1) 825 3811/ Fax:(402) 825 s211 9909210302 990915

,um ng.

PDR ADOCK 05000298 R

PDR s

U.S. Nuclear Regulatory Commission September 15,1999 Page 2 R. P. Kosch E. A. Lanning B. Lewis W. R. Mayben P. Murphy E. Pasche R. D. Stoddard J. H. Swailes W. Turnbull l

I