ML20206P726

From kanterella
Revision as of 12:15, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-455/86-19 on 860618-20.No Violations Noted
ML20206P726
Person / Time
Site: Byron Constellation icon.png
Issue date: 06/26/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20206P731 List:
References
NUDOCS 8607020227
Download: ML20206P726 (2)


See also: IR 05000455/1986019

Text

r

.

JUN 261986

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Jones

of this office on June 18-20, 1986, of activities at Byron Station, Unit 2

authorized by NRC Construction Permit No. CPPR-131 and to the discussicn of

our findings with Mr. R. Klingler at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

c,:.; , e 7.:.: :y X U.:P -

-

'

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-455/86019(DRS)

See_ Attached Dis _tribution

_

yrs

RITI RIII RIII RI

g jk L Da n Hat son

06/26/86 06/p/86 06/2(d86 06/ 86

h70

O

27 860626

CK 05000455

PDR ,

DD/

TE

,

.

Commonwealth Edison Company 2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, LPM, NRR

H. S. Taylor, Quality Assurance

Division

l

i

i

r

I

i