Fabruary ll.J1999
\\
g
.
I
Mr. Oliver D. Kingsley -
President, Nuclear Generation Group
,
- Commonwealth Edison Company
ATTN: Regulatory Services-
l
Executive Towers ' Nest lil J
>
1400 Opus Place, Suite 500
i
Downers Grove, IL 60515 -
l
SUBJECT:
NRC INSPECTION REPORT NO. 50-454/99001(DRS); 50-455/99001(DRS)
-!
' Dear Mr. Kingsley:..
1
i
On January 22,1999, the NRC completed a medium and low-voltage power circuit breaker
1
inspection at your Byron Nuclear Power Station.
l
The ' inspection involved examination of maintenance and engineering related activities for
electrical circuit breakers, including selective examination of breaker maintenance and test
records, industry correspondence, calculations, observation of breaker maintenance and
'
-interviews with maintenance and engineering staff. The enclosed report presents the results of
that inspection.
While our inspection determined that Byron circuit breaker maintenance activities were being
satisfactorily performed, we are concerned regarding the lack of complete maintenance history
of Byron circuit breakers noted in onsite maintenance documents and in the vendor
refurbishment reports.- We are also concerned that the complete design data regarding seismic
qualification of 480 Volt safety related breakers was not translated into plant procedures.
'
in' accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its
enclosures will be placed in the NRC Public Document Room (PDR).
.We will gladly discuss any questions you have concerning this inspection.
Sincerely,
!
original signed by R. N. Gardner
.
Ronald N. Gardner, Chief
Engineering Specialists Branch 2
l
Docket Nos.: 50-454;50-455
I
- Enclosure:
Inspection Report No. 50-454/99001(DRS);
g
- 50-455/99001(DRS)
l
S_ee Attached Distribution -
'-
,
,
1
J
DOCUMENT NAME: G:DRS\\BYR99001.wpd
.
. v.
.
.e
,iei
i
w c c.eu n.ce-inv.ne . r.co.
<m.nv n
w . no m
,
l OFFICE
Rill .
lB.
Rill
() Rill-
lC
l
,,
l
. l NAME'
Teila:sd 10
Jordan %R/
GardnerQA (ON
lDATE-
02/fe/99
02/P/99
-
02/11/99
'
"'
OFFICIAL RECORD COPY
1
~
%
pl
99o222006s 99o211
6
1-
ADOCK 05000454
.
e
PDR.
c.c
--
--
_
_,
_ , , _ . .
-
.
..-
- O. Kingsley
-2-
,
cc w/ encl:
' D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
DCD - Licensing
K. Graesser, Site Vice President -
W. Levis, Station Manager -
B. Adams, Regulatory Assurance Manager
i
- M.' Aguilar, Assistant Attomey General
,
< State Liaison Officer -
'
State Liaison Officer, Wisconsin'
l
Chairman, Illinois Commerce Commission
l
.
i
Distribution-
' SAR (E-Mail)
l
RPC (E-Mail)
l
~
Project Mgr., NRR w/encls
. .
l-
J. Caldwell, Rlli w/encls
!
B. Clayton, Rlli w/enci
l
SRI Byron w/encls
l
l
DRP w/encls -
~ TSS w/encls -
DRS (2) w/encls
i
Rill PRR w/encls ,
PUBLIC IE-01 w/encls
.
'
Docket File w/encls
GREENS
]
IEO (E-Mail)
- DOCDESK (E-Mail)
-
>
\\
4
>.
.
4
'
)
r
a
}