Forwards Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Expresses Concern Re Trend of Configuration Control & Human Performance Errors at Byron Station
ML20207J520
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/10/1999
From: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20207J524 List:
References
50-454-99-02, 50-454-99-2, 50-455-99-02, 50-455-99-2, NUDOCS 9903160305
Download: ML20207J520 (3)


See also: IR 05000454/1999002

Text

- . .. . . .- -

.-4

, p

UNITED STATES

  1. p .mmEIo NUCLEAR REGULATORY COMMISSION

,8 'o,% REGloN !!! l

! $ 801 WARRENvlLLE ROAD ,

" '

r LISLE. ILLINOIS 60532-4351

%,

f >

            • March 10, 1999 I

l

l

l

1

Mr. Oliver D. Kingsley j

President, Nuclear Generation Group j

Commonwealth Edison Company '

ATTN: Regulatory Services

Executive Towers West lli i

1400 Opus Place, Suite 500

Downers Grove,IL 60515 l

!

SUBJECT: BYRON INSPECTION REPORT 50-454/99002(DRP); 50-455/99002(DRP)  !

Dear Mr. Kingsley: ,

On February 16,1999, the NRC completed an inspection at the Byron i and 2 reactor facilities.

The enclosed report presents the results of that inspection. i

i

During this inspection period, routine operations of the facility were conducted in a professional,  !

safe and controlled manner. Operators responded appropriately to alarms, closely monitored

main control room panels, were knowledgeable of plant conditions, properly used procedures,

and generally used three-way communications. We also noted that maintenance work

instructions were generally commensurate with the skill level of maintenance personnel and

were sufficient to properly perform the maintenance activities, with one notable exception.

Maintenance work instructions for the diesel generators did not contain any guidance on

priming the diese1 generators fo!!owing maintenance on the fuel oil system and the instructions

lacked appropriate guidance for the assembly of some mechanicaljoints. 1

We continue to be concemed with the trend of configuration control and human perforrnance ,

errors at Byron Station. Numerous configuration control and human performance issues have l

been documented in NRC inspection reports over the past year and most of these issues had to  !

do with nonsafety-related equipment. We recognize you have been aggressively identifying  ;

'

configuration control and human performance issues and you have initiated corrective actions

to address these problems. However, your corrective actions have not been totally effective at

arresting these negative performance trends. Accordingly, we are concerned with the

effectiveness of your corrective action program in these areas. I

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice l' a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

l

'

9903160305 990310

PDR ADOCK 05000454

G PDR

-- _ - _ ._ _ .

C

.

<

O. Kingsley -2-

-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

original signed by

Michael J. Jordan, Chief

Reactor Projects Branch 3

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF46

Enclosure: Inspection Report 50-454/99002(DRP);

50-455/99002(DRP)

cc w/enct D. Helwig, %nior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Vice President Regulatory Services

CCD - Licensing  !

K. Graesser, Site Vice President ,

W. Levis, Station Manager i

B. Adams, Regulatory Assurance Manager i

Richard Hubbard, MHB Technical Associates l

M. Aguilar, Assistant Attorney General

State Liaison Officer

State Liaison Officer, Wisconsin i

Chairman, Illinois Commerce Commission

l

l

l,

l

l

- DOCUMENT NAME: G:\BYRO\BYR99002.DRP

To receive a copy of this document Indicate in the box: "C" = Copy w/o attach / encl *E" = Copy w/ attach /enci"N" = No copy

OFFICE Rill:DRP , Rill:DRS l. !J Rlll:DRS l__, RIII:DRP e J 6"

NAME Tongue /kje @i FL Gardner/Sec fSV Shear /Sec R4.1 F Jordan W/ f/

'

DATE 03/$ /99 7 03/ (/99 03(<799 03/ 0709

OFFICIAL RECORD COPY

.

. . . . .- . . . - .

.

-... .. , .-

? l

'

,

g.

O. Kingsley -3-

l

Distribution:

'

SAR (E-Mail)

R. Correia (RPC) (E-Mail)  !

Project Mgr.,' NRR w/enci  ;

J. Caldwell, Rlll w/enci  !

' B. Clayton, Rill w/enci  !

SRI Byron w/enci ,

DRP w/enci l

TSS w/enci j

DRS (2) w/enci ,

Rlli PRR w/enci  !

PUBLP IE-01 w/enci ,

Docket File w/enci j

GREENS *

IEO (E-Mail) l

DOCDESK (E-Mail) ,

!

'

, t

w ;

i

!

,

t

8

!

l

,

'

,