-Docket No. 50-454.-
DocketiNo. 50-455.
s lEA 90-082
. Commonwealth Edison Company:
f.
AfTN:- Mr.-Cordell Reed N
. Opus WestLIII-
- Senior Vice President-a$
11400 Opus Place -
' Downers Grove, IL _60515 Gentlemen:
!This confirms our-plans'as' discussed between Mr. T. K.-Schuster of your_ staff-and Mr. M. A. Ring of'this 'officel to have a meeting with you and members of' our staff at the NRC Regional Of fice in Glen Ellyn, Illinois, on August 2,~ '199.0, >
~
-s
-at 1:00 p.m.-(CDT).
This meeting is'an: enforcement conference to discuss.
'Regionaliand Office of: Investigation. findings related-to'the apparent lack of
^
' control-of operability determinationsJinvolving the emergency diesel
,A1
- generators at Byron.. During this meeting you are requested to present'to"the;'
i staff:
L 1.. :Discussionofthe_ CECO: process (including (S&L)or-CnoperIndustries)'for the. role and-responsibilities-of contractors such as.Sargent-'and.Lundy ensuring that potential operability, concerns,Ldiscovered at any point in O,
~
the process, are/were promptly evaluated and -communicated to thecaffected' plant. 'This should: include both the procedures, people,:and practicesin
. place today and in place:in December.1986.
g s
a
.2.
Discussion of the responsibility of individual Ceco engineers with respect to detenaining operability upon learning of a potential _ issue, j
L familiarity with Technical Specifications and' design drawings for the ir documentation requirements.
jl engineer's systems,; appreciation of the need for: prompt action, and 13.
' Discussion of item 2, aboy'e, for S&L engineers and Cooper engineers.
I
- 14..
Discuss why 'a-potential _ emergency diesel generator _ operability is_ sue _.,
initially discovered on December 4,1986, was not communicated to the Byron-and'Braidwood plants until December 17, 1986, including the following:
1 3
a.
Why the process permitted Cooper to take no action between initial notification on' December 5, 1986, and the preset i
teleconference date of December 17, 1986.
3
.b.
Why CECO Engineering did not contact the plant immediately
,O l following the 11:00 a.m. conference call when it was established that the affected switches were not seismically qualified?
l 9007240043 900718 PDR 'ADOCK 05000454 Q
PDC JA
(
)
~
U r
f L
JUl.181990
-Conrnonwealth Edison Company, 2
In addition, discuss the corrective actions you have or should have taken' to' prevent the occurrence of the apparent violations.
We appre61 ate your cooperation in this matter, and will gladly discuss any questions you may have concerning this meeting.
Sincerely, OrighaTsignedbyE.G.Creenman Edward G. Greenman, Director t.
Division of Reactor Projects-CC' T. J. Maiman, Vico President, PWR Operations
- T. Kovach, Nuclear Licensing. Manager R. Pleniewicz,1 Station Manager DCD/DCB (RIDS) 1 Licensing Fee Management Branch j
Resident Inspectors, Byron, Braidwood, and Zion D. W. Cassel, Jr.. Esq.
Richard Hubbard J. W. McCaffrey, Chief, Public Utilities' Division Diane Chavez,.DAARE/ SAFE l
S. P. Sands, Acting NRR LPM H. S. Taylor, Quality Assurance Division i
' Robert Newmann,-0ffice of Public Counsel, State of Illinois Center
-bec: J.'Lieberman, OE L. Chandler, OGC J. Partlow, NRR i
7
- j h
T5EEfATTACHED'CONCURRENCESjp u
RIII RIII RIII RIII RII I
Farber/bs Shafer Ring Miller Greennul n i
l
oc a
i
,.,.i...,
V JUL 18199 e
[
Cormionwealth Edison C' mpany 2
o L.
r In addition; discuss the corrective actions you-have or should have taken to prevent' the occurrence of the apparent violations.
We appreciate your cooperation in this matter, and will g!cdly discuss any P
. questions you may have concerning this meeting.
Sincerely,-
d Edward G. Grewanan, Director Division of Reactor Projects' cc:
T. J. Maiman, Vice President, t
PWR-Opera tions'
'T. Kovach -Nuclear Licensing Manager R. Pleniewicz,' Station Manager DCD/DCB-(RIDS)
Licensing fee Management Branch
. Resident Inspectors, Byron,
- l Braidwood, and Zion-D. W. Cassel, Jr., Esq.
Richard Hubbard J. W. McCaffrey, Chief, Public Utilities ~ Division'
. Diane Chavez, DAARE/ SAFE S. P.-' Sands, Acting NRR LPM H. S. Taylor, Quality Assurance
-i Division-Robert Newmann, Office of Public Counsel,' State of. Illinois Center
. bcc ; d. /..r(6cc r1.oq 06 7
L Cruct, CGC
<). fhrno% NRR i
I
$5 gD RI; I RII' Rill R111
- fh VStr rb r/bs a er Rin Miller PWGreenn
- we gow<
u m. _
,140 i