Forwards Safety Evaluation & Technical Ltr Rept Re Second 10-yr Interval ISI Request for Relief 12R-11,rev 2.Licensee Proposed Alternative to code-required Pressure Test Authorized for Current Interval
ML20204G364
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/19/1999
From: Richards S
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20204G367 List:
References
TAC-MA2419, TAC-MA2420, NUDOCS 9903260134
Download: ML20204G364 (5)


Text

. ~ . - . . ~ . - - - - - . - . - - . - _-. . . - . . - - - . . - . - - - . . . - .

March 19,19f9 i Mr. Oliver D.' Kingsley, President Nuclear Generation Group Commonwealth Edison Company. <-

' Executive Towers West lli J 1400 Opus Place, Suite'500 D'.iwners Grove, IL 60515

SUBJECT:

EVALUATION OF SECOND 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA2419 AND MA2420)

Dear Mr. Kingsley:

By letter dated July 29,1998, Commonwealth Edison Company, submitted Relief Request 12R-11, Revision 2, which requested approval of an attemative to the Code-required pressure test, Section IWA-5242(a), for insulated bolted connections in systems borated for the purpose of controlling reactivity, pursuant to 10 CFR 50.55a(a)(3)(i). The staff, with technical assistance from its contractor, has reviewed and evaluated the information provided by the licensee in the submittal. The staff has determined that the licensee's proposed alternative to Section IWA-5242(a) would provide an acceptable level of quality and safety. Therefore, pursuant to VO CFR 50.55a(a)(3)(i), the licensee's proposed alternative is authorized for the current interval.

The staff's evaluation and conclusion are contained in the enclosed Safety Evaluation (SE) with the contractor's technical letter report (TLR) attached.

1 Should you have any questions on this issue please contact Mr. John Hickman at

'(301) 415-3017.

Sincerely, ORIG. SIGNED BY Stuart A. Richards, Director Project Directorate 111-2 Division of Licensing Project Management i Office of Nuclear Reactor Regulatio7 i q l Docket Nos. STN 50-454 and STN 50-455 i

Enclosure:

SE w/att TLR cc w/ encl: See next page -

DISTRIBUTION: genjillPl@D PUBLIC PDill-2 r/f (2)

J. Zwolinski/S. Black S. Richards J. Hickman G. Bagchi G. Hatchett C. Moore OGC,015818 M. Jordan, Rlli ACRS, T2E26 CNorsworthy (SE) i DOCUMENT NAME: G:\PD3-2tCimBYRON\ RELA 2419.WPD See previous concurrence

  • 1 To RECEIVE A COPY OF THis DoCut EtLT, INOGATE IN THE box: "C" = COPY WITHOuT ENCLOSURES "E" = COPY WITH ENCLo!UREs "N" j OFFICE PM:PD3-2 j!6 { LAME}-2 DOGC D:PD3-2' O j NAME JHICKhM kMhk CMarco* SRICHARDS[ ]

DATE~ 3/ / 7# /99 3/ N/99 - 3/17/99 3/ / T /99

. OFFICIAL RECORD COPY ,. ,._ _~ ,~ g 9903260134 990319 P" " " ~W D PDR ADOCK 05000454 t - .o --

G _

PDR a 1

= =:.:== - - - - - ::- : := :-

-- == = . = = = =: ===:.m - - - -

~.

  • i i

1 Mr. Oliver D. Kingsley, President Nuclear Generation Group j Commonwealth Edison Ccmpany  :

Executive Towers West lli  !

1400 Opus Place, Suite 500

. Downers Grove,IL 60515 .

SUBJECT:

EVALUATION OF SECOND 10-YEAR INTERVAL INSERVICE INSPECTION

REQUEST FOR RELIEF FOR BYRON NUCLEAR POWER STATION, UNITS 1 j AND 2 (TAC NOS. MA2419 AND MA2420) l

Dear Mr. Kingsley:

c

By letter dated July 29,1998, Commonwealth Edison Company, submitted Relief Request
12R-11, Revision 2, which requested approval of an alternative to the Code-required pressure j test, Section IWA-5242(a), for insulated bolted connections borated for the purpose of ,

i controlling reactivity, pursuant to 10 CFR 50.55a(a)(3)(i). The staff, with technical assistance j from its contractor, has reviewed and evaluated the information provided by the licensee in the i submittal. The staff has determined that the licensee's proposed attemative to Section j IWA-5242(a) would provide an acceptable level of quality and safety. Therefore, pursuant to 1 10 CFR 50.55a(a)(3)(i), the licensee's proposed alternative is authorized for the current interval.

i The staff's evaluation and conclusion are contained in the enclosed Safety Evaluation (SE) with

! the contractor's technical letter report (TLR) attached.

l '

Should you have any questions on this issue please contact Mr. John Hickman at

] (301) 415-3017.  ;

J i Sincerely,

{.

Stuart A. Richards, Director

! Project Directorate lil-2 l Division of Licensing Project Management

Office of Nuclear Reactor Regulation I

Docket Nos. STN 50-454 and STN 50-455 t

Enclosure:

SE w/att TLR i cc w/ encl: See next page l DISTRIBUTION- Docket File PUBLIC PDill-2 r/f (2)

! J. Zwolinski/S. Black S. Richards J. Hickman G. Bagchi j G. Hatchett C. Moore OGC,015B18 M. Jordan, Rlli ACRS, T2E26 CNorsworthy (SE) 1 DOCUMENT NAME: G:\PD3-2tCM\ BYRON \ RELA 2419.WPD i

To RECElVE A COPY oF THis DOCUMENT, INDICATE IN THE box: "C" = COPY WITHoUT ENCLOSURES "E" = Co(WITH ENCLOSURES "N" j OFFICE PM:PD3-2 d LA:Pk3-2 0 /OGC D:PD3-2 l NAME JHICK [C h E f, ymfy SRICHARDS DATE 3/ /C 199 Y M /99 3/ I 7 /99 3/ /99 OFFICIAL RECORD COPY

~

r

[furuq t UNITED STATES f

a j NUCLEAR REGULATORY COMMISSION l $ WASHINGTON, D.C. 30666 4 001 -

l l

<[*****,o#

l March 19,1999 -

Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

EVALUATION OF SECOND 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA2419 AND MA2420)

Dear Mr. Kingsley:

By letter dated July 29,1998, Commonwealth Edison Company, submitted Relief Request 12R-11, Revision 2, which requested approval of an altemative to the Code-required pressure l test, Section IWA-5242(a), for insulated bolted connections in systems borated for the purpose of controlling reactivity, pursuant to 10 CFF 30.55a(a)(3)(i). The staff, with technical assistance from its contractor, has reviewed and evalt'd3d the information provided by the licensee in the submittal. The staff has determined that the licensee's proposed alternative to Section IWA-5242(a) would provide an acceptable level of quality and safety. Therefore, pursuant to ,

10 CFR 50.55a(a)(3)(i), the licensee's proposed attemative is authorized for the current interval. l The staff's evaluation and conclusion are contained in the enclosed Safety Evaluation (SE) with the contractor's technical letter report (TLR) attached. l Should you have any questions on this issue please contact Mr. John Hickman at (301)415-3017.

Sincerely, Stuart A. Richards, Director i Project Directorate lil-2 l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455

Enclosure:

SE w/att TLR i

cc w/ encl: See next page

! 1 I

i I

l l

l

I O. Kingsley Byron Station ..

Commonwealth Edison Company Units 1 and 2 cc:

Regional Administrator, Region lli Mrs. Phillip B. Job . son U.S. Nuclear Regulatory Commission 1907 Stratford L<:n j 801 Warrenville Road Rockford,IllinoN 61107 1 4

Lisle, Illinois 60532-4351 Attomey General

- Illinois Department of Nuclear Safety 500 S. Second Street Office of Nuclear Facility Safety Springfield, Illinois 62701 1035 Outer Park Drive Springfield, Illinois 62704 Commonwealth Edison Company l

Byron St& tion Manager '

Document Control Desk-Licensing 4450 N. German Cht rch Road Commonwealth Edison Company Byron, Illinois 61010-9794 1400 Opus Place, Suite 400 1 Downers Grove, Illinois 60515 Commonwealth Edison Company Site Vice President - Byron Ms. C. Sue Hauser, Project Manager 4450 N. German Church Road Westinghouse Electric Corporation Byron, Illinois 61010-9794 Energy Systemn Business Unit Post Office Box 355 Mr. David Helwig Pittsburgh, Pennsylvania 15230 Senior Vice President Commonwealth Edison Company Joseph Gallo Executive Towers West til Gallo & Ross 1400 Opus Place, Suite 900 l 1025 Connecticut Ave., N.W., Suite 1014 Downers Grove, Illinois 60515 l Washir Jton, DC 20036 l Mr. Gene H. Stanley l Howard A. Leamer PWR Vice President i Environmental Law and Policy Commonwealth Edison Company 4

Center of the Midwest Executive Towers West lil l

, 35 East Wacker Drive 1400 Opus Place, Suite 900  !

i Suite 1300 Downers Grove, Illinois 60515 4

Chicago, Illinois 60601 Mr. Christopher Crane  !

U.S. Nuclear Regulatory Commission BWR Vice President

Byron Resident inspectors Office' Commonwealth Edison Company
4448 North German Church Road Executive Towers West til Byron, Illinois 61010-9750 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Ms. Lorraine Creek i RR 1, Box 182 Manteno, Illinois 60950 Chairman, Ogle County Board Post Office Box 357 l Oregon, Illinois 61061 1

1

O. Kingsley Byron Station .

Commonwealth Edison Company Units 1 and 2 l Mr. R. M. Krich Vice President - Regulatory Services Commonwealth Edison Company Executive Towers West lll 1400 Opus Place, Suite 500 Downers Grove,lilinois 60515 Commonwealth Edison Company Reg. Assurance Supervisor- Byron 4450 N. German Church Road Byron, Illinois 61010-9794 Ms. Pamela B. Stroebel Senior Vice President and General Counsel l Commonwealth Edison Company i P.O. Box 767 l Chicago, Illinois 60690-0767

_