U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-455/86019(DRS)
Docket No. 50-455 Construction Permit No. CPPR-131 Licensee: Convronwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 Facility Narre: Byron Station, Unit 2 Inspection At: Byron Site, Byron, Illinois Inspection Conducted: June 18-20, 1986
$/16!B. __
Inspector-
. E. Jones 44/d5 Approved By: D o
Materials and Processes hte Section In_spe,ction Sunnary e
Routine, unannounced i_nspection of th_9] Eating, Ventilating, n,986__(R_eport No,.J_50-455/8_6_01 DRSJJ l
~
Inspection _on, June 18__20 Areas Inspected:
e arOTrlonditioning Systems (HVAC).
Results: No violations or deviations were identified.
8607020250 860626
--
PDR ADOCK 05000455 G
.
'O DETAILS 1.
Persons Contacted Consonwealth _ Edison Company _jc_E_Coj
- R. Klingler, Project QC Supervisor
- R. Moravec, Project Mechanical Supervisor
- B. Byrne, Field Engineer
- E. Martin, QA Superintendent Reliable Sheet Metal Works (RSM)
R. Irish, Corporate QA Manager The inspector also contacted and interviewed other licensee and contractor employees.
- Denotes those attending the exit meeting.
2.
H_ea_t_ipS,_yept_i_la_ti_o_n, and_ Air ConditioninS_Sys_tyms_j_HJAC)-Unit 2.
s
_
a.
General This is the completion of inspec+. ions that are documented in NRC Inspection Reports No. 50-455/84-05, No. 50-455/84-13, and No.
50-455/85027. Reliable Sheet Metal Works (RSM) is the HVAC Contractor for CECO at the Byron Station.
b.
Nonconfoman_c_e_ Repo r_ts The NRC inspector reviewed the following nonconformance reports (NCR)
issued by RSM and determined that the records were properly stored, retrievable, and legible. The records were found to adequately document the current status of the nonconformances.
NCR No.
075 088 100 112 117 118 120 121 122 125 No violations or deviations were identified.
_
..
.
__________
______________________ - -______________-_________
.
.
.
c.
Audit Reports The NRC inspector reviewed RSM Quarterly Audit Reports for 1985 and 1986. The inspector determined that the audits were performed in accordance with schedule and functional areas in established audit plans. Corrective actions were found to be timely and proper.
No violations or deviations were identified.
d.
As-Installed Equipment The NRC inspector observed the completed installation for proper location, configuration, identification, and danage of the following equipment, associated ductwork and pressure instrumentation:
S_eismic Suppor_t_s_ f_or Ductwork H3850 H3830 H3853 H3666 H3852 H3648 H3644 H3643 H3650 H3651 H3658 H3659 Isolation _ D_ampers 2VX05Y 2VX18Y 2VX27Y 2VX22Y
_SWitchgeay_ Vep,tj la, tion Supply
.
2VX04C - ESF Ventilation Fan 2VX07Y - Supply Damper No violations or deviations were identified.
3.
Exj t_ _ Interview The inspector met with representatives (denoted in Paragraph 1) at the conclusion of the inspection and summarized the scope and findings of this inspection as noted in this report. The inspector also discussed the likely infornetional content of this inspection report with regard to documents or processes reviewed by the inspector during the inspection.
The licensee did not identify any such documents / processes as proprietary.