=i 9
February 3, 1999 Mr. Paul Geddes Regulatory Arsurance Commonwealth Edison Company
. Byror' Nuclear Power Station 4450 N. German Church Road Byron, IL 61010
SUBJECT:
REVISION 7 TO THE UPDATED FINAL SAFETY ANALYSIS REPORT FOR
' BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA4429 AND MA4430)'
Dear Mr. Geddes:
The update of set number 58 of the Updated Final Safety Analysis Report has been completed.
I have enclosed the confirmation sheet you provided with the update.
. lf you have any questions please contact me at (301) 415-3017.
Sincerely, ORIG. SIGNED BY John B. Hickman, Project Manager Project Directorate Ill-2 Division of Reactor Projects -Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-454 and 50-455
Enclosure:
As Stated cc w/ encl: See next page
- Distribution:
M PRp3 PUBLIC PDlll-2 r/f (2)
C. Moore S. Richards OGC,015B18 ACRS, T2E26 DOCUMENT NAME: G:\\PD3-2\\LTRA4429.WPD
. To necawe a con oc r oocumeur, umcare n r e ox. -c. copy mour :=ctosunes e. con - ametosunes v OFFICE PM:PD3-2 4
LA:PD3-2 6
k{lI1
\\
JHICKMANh'CMOORE k.' [of V)Y
- C NAME v
DATE 2/ '/.
/99 2/ '3
/99>
OFFICIAL RECORD COPY l
9902090009 990203 r~yJ PDR ADOCK 05000454
. }mn n{h Q b1 P
PDR 020103
_J
~
?
ps ccru f/
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 30006-0001 February 3, 1999 Mr. Paul Geddes Regulatory Assurance Commonwealth Edison Company Byron Nuclear Power Station 4450 N. German Church Road Byron, IL 61010
SUBJECT:
REVISION 7 TO THE UPDATED FINAL SAFETY ANALYSIS REPORT FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MA4429 AND MA4430)
Dear Mr. Geddes:
The update of set number 58 of the Updated Final Safety Analysis Report has been completed.
I have enclosed the confirmation sheet you provided with the update.
If you have any questions please contact me at (301) 415-3017.
Sincerely, h
w John B. Hickman, Project Manager Project Directorate lll-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-454 and 50-455
Enclosure:
As Stated cc w/ encl: See next page
.n.,.
i*,~~.
.k O. Kingsley Byron Station Commonwealth Edison Company Units 1 and 2 cc:
Regional Administrator, Region lli Mrs. Phillip B. Johnson U.S. Nuclear Regulatory Commission 1907 Stratford Lane 801 Warrenville Road Rockford, Illinois 61107
-l Lisle, Illinois 60532-4351 Attomey General lilinois Department of Nuclear Safety 500 S. Second Street Office of Nuclear Facility Safety -
Springfield, Illinois 62701 l
1035 Outer Park Drive -
Springfield, Illinois 62704 Commonwealth Edison Company Byron Station Manager Document Control Desk-Licensing 4450 N. German Church Road l-Commonwealth Edison Company Byron, Illinois 61010-9794 1400 Opus Place, Suite 400 l
Downers Grove, Illinois 60515 Commonwealth Edison Company Site Vice President - Byron l
Ms. C. Sue Hauser, Project Manager 4450 N. German Church Road Westinghouse Electric Corporation Byron, Illinois 61010-9794 Energy Systems Business Unit l
Post Office Box 355 Mr. David Helwig Pittsburgh, Pennsylvania _15230 Senior Vice President i
Commonwealth Edison Company Joseph Gallo Executive Towers West 111 Gallo & Ross 1400 Opus Place, Suite 900 1025 Connecticut Ave., N.W., Suite 1014 Downers Grove, Illinois 60515 Washington, DC 20036 i
Mr. Gene H. Stanley Howard A. Learner PWR Vice President i
Environmental Law and Policy Commonwealth Edison Company l
Center of the Midwest Executive Towers West lll 35 East Wacker Drive 1400 Opus Place, Suite 900 i
Suite 1300 Downers Grove, Illinois 60515 Chicago, Illinois 60601 Mr. Christopher Crane U.S. Nuclear Regulatory Commission BWR Vice President Byron Resident inspectors Office Commonwealth Edison Company i
4448 North German Church Road Executive Towers West lli Byron, Illinois 61010-9750 1400 Opus Place, Suite 900 Downers Grove, Illinois 60515 Ms. Lorraine Creek RR 1, Box 182
- Manteno, Illinois 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, Illinois 61061 n.,
a-
- e.,
r.
O. Kingsley Byron Station Commonwealth Edison Company 2-Units 1 and 2 l
I Mr. R. M. Krich Vice President - Regulatory Services Commonwealth Edison Company i
Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove, Illinois 60515 r,
Commonwealth Edison Company Reg. Assurance Supervisor-Byron 4450 N. German Church Road l:
Byron, ll'.inois 61010-9794 Ms. Pamela B. Stroebel Senior Vice President and General Counsel-Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690-0767 i
i I-j.
_,,,m,.,,m.m e----e>
T TcT
e s
Date Transmitted:
December 16. 1998 BOOK (S) #:
58 Copy Assigned to
' John B. Hickman Dept:
NRC LICENSING pQCUMENT TRANSMITTAL
[
] The following changes to the Updated Final Safety Analysis Report (UFSAR) are attached for insertion into your UFSAR Books:
Station:
Evron/Braidwood Revision No.
7
[
] OTHER - See " instructions".
INSTRUCTIONS SEE ATTACHED GREEN PAGES IN CONFORMING WITH NUCLEAR PROCEDURE #6, IMMEDIATELY REVISE YOUR DOCUMENTS AS INSTRUCTED ABOVE AND RETURN THIS SHEET TO:
P.
Geddee. REGULATORY ABEURANCE COMMONWEALTH EDISON COMPANY BYRON NUCLEAR POWER STATION 4450 N. GERMAN CHURCH ROAD BYRON, IL 61010 I hereby acknowledge receipt of the above transmittal.
The additional and/or revised pages have been inserted in my assigned book and superseded pages removed as required.
John B. Hicke n 2 / 1 / 99 PLEASE PRINT YOUR NAME ABOVE Date Note: If assigned copies have been transferred to another person or address, please fill out the spaces below.
NAME OF HOLDER:
DEPARTMENT:
ADDRESS:
Please direct any questions to Paul Geddes, B/B UFSAR Coordinator, at (815) 234-5441 x4082