ML20206P726
| ML20206P726 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 06/26/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20206P731 | List: |
| References | |
| NUDOCS 8607020227 | |
| Download: ML20206P726 (2) | |
See also: IR 05000455/1986019
Text
r
.
JUN 261986
Docket No. 50-455
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. D. E. Jones
of this office on June 18-20, 1986, of activities at Byron Station, Unit 2
authorized by NRC Construction Permit No. CPPR-131 and to the discussicn of
our findings with Mr. R. Klingler at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~
c,:.;
, e 7.:.: :y X U.:P -
-
'
J. J. Harrison, Chief
Engineering Branch
Enclosure: Inspection Report
No. 50-455/86019(DRS)
See_ Attached Dis _tribution
_
yrs
RITI
RIII
RIII
RI
g
jk
L
Da
n
Hat son
06/26/86
06/p/86
06/2(d86
06/
86
h70
27 860626
O
CK 05000455
,
DD/
,
.
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
Diane Chavez, DAARE/ SAFE
Steve Lewis, ELD
L. Olshan, LPM, NRR
H. S. Taylor, Quality Assurance
Division
l
i
i
r
I
i