ML20154L190

From kanterella
Revision as of 20:50, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-09 on 880411-15 & Notice of Violation
ML20154L190
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/24/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20154L193 List:
References
NUDOCS 8805310199
Download: ML20154L190 (2)


See also: IR 05000267/1988009

Text

, ...

7 . MAY 2 41988

In Reply Refer To:

~ Docket: 50-267/88-09

Public Service Company'of Colorado'

~ ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear'0perations

2420 W. 26th Avenue,- Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Dr. J. 8. Nicholas and Mr. R. ' Vise-of '

this office during the period April 11-15, 1988, of activities authorized-by.NRC

Operating License DPR-34 for Fort St. Vrain, and to the discussion of our

findings with you and other members of your staff at the conclusion of the

inspection on April.15, 1988.

Areas examined during the inspection _ included the chemistry / radiochemistry

program and water chemistry and radiocher.istry confirmatory measurements. Within

these areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the'NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to this

violation, in writing, in accordance with the provisions of Section 2.201 of the

NRC's "Rules of Practice," Part 2,- Title 10, Code of Federal Regulations. Your

response should be b& sed on the specifics contained in the Notice of. Violation

enclosed with this letter.

We have also examined actions you have taken-with regard to previously identified

inspection findings. The status of these items is identified in paragraph 2 of

the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction'Act of 1980, PL 96-511.

Sh'ould you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed B

A. B. Beach

L. J. Callan, irector

Division of Reactor Projects

Enc 1  : (see age) /

RIV: SB FR AC:FRP[ B C:RPSB [ C:DR D:

JBNic z i REBaer BMurray 8

s'/n 88 4~//L/88 [/ 3/88

1 i /i} 88 TFWesterman})palan

(/g/88 '

fy/88

8805310199 880524

~

U

PDR ADOCK 05000267 /,0

f

Q DCD y

. - . _ - -

-_ . _ . - _ . _ . _ .

[-? G ,,, ,

-+

,

,_ -.

'

._

y-: ..

ja Public Service Company of Colorado' -2-

' Enclosures:

1. ' Appendix A.- Notice of Violation

,

2. Appendix B - NRC Inspection Report

50-267/88-09

.cc w/enclosuresi-

FortJSt. Vrain Nuclear Station

Manager,.' Nuclear Production Division

16805 WCR 1915

Platteville, Colorado 80651-

.

Fort-St. Vrain Nuclear Station

P. Tomlinson, Manager,-Quality

Assurance Division

'

(same address) ,

- Colorado Radiation Control Program Director

~

Colorado Public Utilities Commissio'n

bec to DM8 (IE06).

bec distrib. by RIV:

  • RRI R.' D. Martin,_RA .

.

..*Section Chier' (DRP/8) * Project Engineer,'DRP/B

,

'*RPSB-DRSS Lisa Shea, RM/ALF

'

  • MIS System s
  • RSTS Operator
  • K. Heitner, NRR Project Manager *RIV File-
  • DRS *TSS
  • DRP H. Scott, Acting E0

1 *J. B. Nicholas- *R. Wise

!- *R. E.-Baer *B. Murra,

R. L. Bangart

'

  • w/766

l

L

'

L

.

l"

l'

a