ML15125A438
ML15125A438 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 05/05/2015 |
From: | Diane Jackson NRC/RGN-II/DRP/RPB4 |
To: | Hopper G NRC/RGN-II/DRP/RPB4 |
References | |
Download: ML15125A438 (10) | |
Similar Documents at Robinson | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24143A0612024-05-22022 May 2024
[Table view]NRC Presentation Slides for Topical Reports to Support SLR (5-22-24 Public Meeting) V2 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1108908992011-03-30030 March 2011 Attendance List of 03/24/11 Meeting Regarding Annual Assessment of H.B. Robinson Steam Electric Plant ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004362005-03-24024 March 2005 NRC CY2004 Annual Assessment Meeting - Robinson - Hartsville, South Carolina, March 24, 2005 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0410600042004-03-30030 March 2004 Presentation of NRC CY2003 Annual Assessment Meeting for H.B. Robinson 2024-05-22 Category:Meeting Summary MONTHYEARML24165A2362024-06-21021 June 2024
[Table view]Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17097A2492017-04-0606 April 2017 Public Meeting Summary, 2016 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML16235A2382016-10-17017 October 2016 Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors ML16123A0312016-05-26026 May 2016 Summary of Meeting with Duke Energy Progress, Inc. to Discuss a Proposed License Amendment Requests Regarding a 24 Month Fuel Cycle and an Alternative Source Term for Robinson, Unit No. 2 ML16123A0362016-05-0505 May 2016 Summary of the H.B. Robinson Steam Electric Plant, Unit 2 - February 9-10, 2016 Audit Associated With License Amendment Request to Transition to the National Fire Protection Association 805 Standard (CAC No. MF2746) ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML15343A0712015-12-23023 December 2015 September 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard ML15280A2532015-11-25025 November 2015 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15281A1982015-11-10010 November 2015 Summary of Meeting with Duke Energy Progress Inc., to Discuss the H. B. Robinson Steam Electric Plant Unit No. 2, License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15117A5812015-05-0606 May 2015 April 14, 2015, Summary of Public Meeting on Calculation of Risk for NFPA-805 Fire Areas Crediting Control Room Abandonment ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15068A3492015-03-18018 March 2015 Summary of March 4, 2015, Meeting with Duke Energy Progress, Inc., Regarding Pre-Submittal Meeting for 24-Month Fuel Cycle Proposed License Amendment Request ML14210A0502014-07-30030 July 2014 June 30, 2014, Summary of the Category 1 Public Meeting with Duke Energy Progress Inc. to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0502013-05-20020 May 2013 Summary of April 18, 2013, Meeting with Duke Energy Concerning the National Fire Protection Association (NFPA) 805: Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML12332A1932012-12-13013 December 2012 Summary of Public Meeting with Duke Energy Concerning GL 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plan Re H. B. Robinson Steam Electric Plant, Unit 2 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1113703382011-05-17017 May 2011 Meeting Summary Letter Regarding Performance Improvement Plan ML11116A0202011-05-12012 May 2011 April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2 ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1015803032010-06-0707 June 2010 Summary of Meeting with Augmented Inspection Team to Discuss the Results of an Augmented Inspection at the H.B. Robinson Team Electric Plant ML1013904872010-05-19019 May 2010 Summary of Category 1 Public Meeting with Carolina Power & Light Company H. B. Robinson Steam Electric Plant Fire Event on March 28, 2010 ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 2024-06-21 Category:Memoranda MONTHYEARML24165A2362024-06-21021 June 2024
[Table view]Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML22299A0212023-01-10010 January 2023 Memo to File - Robinson Final EA 2017, 2019, 2021 ML21145A0182021-05-25025 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regard the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20266G4412020-09-24024 September 2020 Insights Obtained from Review of Robinson Seismic Probabilistic Risk Assessment ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15342A2052016-01-0808 January 2016 Regulatory Audit in Support of License Amendment Request to Adopt NFPA 805 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML1210707142012-05-21021 May 2012 Memo from G. Taylor and N. Melly to M. Salley H.B. Robinson High Energy Arc Fault Event Cable Damage Evaluation ML11180A0162011-07-0101 July 2011 Notice of Forthcoming Meeting with Carolina Power & Light Company Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, to Introduce the New Management Team and Discuss Strategic Plan ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1015901992010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Progress Energy Carolina'S Ownership Interest of H.B. Robinson Steam Electric Plant Unit 2, Brunswick Steam Electric Plant Units 1 and 2 & Shearon Harris Nuclear Power Plant Unit ML1001910052010-01-29029 January 2010 Notice of Conference Call with Progress Energy Carolinas, Inc., to Discuss H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Response ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0524400382005-09-21021 September 2005 Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. ML0506100282005-03-0303 March 2005 Closeout Memo, Bulletin 2003-02 SP-1500 Examination of RPV Lower Head Penetration Leakage ML0426003882004-09-16016 September 2004 Safety Evaluation on H. B. Robinson Request Involving Full Implementation of the Alternative Source Term, ML0409001302004-04-23023 April 2004 Renewal of Full-Power Operating License for H.B. Robinson, Unit No. 2 ML0410606752004-04-15015 April 2004 Ltr, Steam Generator Tube Inspection Letter ML0404104222004-02-0404 February 2004 Request Approval of Excused Absence for Employees Affected by Inclement Weather Conditions ML0327400092003-09-30030 September 2003 Results of the Robinson SDP Phase 2 Notebook Benchmarking Visit, During June 2003 ML0306504452003-03-0606 March 2003 Closeout of TAC Number for Best Estimate large-break loss-of-coolant Accident Methodology ML0301602062003-01-0808 January 2003 Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Robinson 2 ML0229703632002-10-23023 October 2002 Meeting with NEI, Surry & North Anna Units 1 & 2, McGuire & Catawba Units 1 & 2, Peach Bottom Units 2 & 3, St. Lucie Units 1 & 2, Fort Calhoun, H. B. Robinson Unit 2, R.E. Ginna, and Virgil C. Summer. the Proposed Agenda Is Attached ML0226700072002-09-24024 September 2002 Technical Specification Change Regarding Selective Implementation of Alternative Radiological Source Term ML0225601832002-09-13013 September 2002 Assessment of Radiological Consequences for 1.7% Power at H. B. Robinson Unit 2 Power ML0225502282002-09-12012 September 2002 Assessment of Atmospheric Dispersion & Radiological Dose Assessment for Fuel Handling Accident at H. B. Robinson Unit 2 Power ML0224003342002-08-27027 August 2002 NRR Notification of Significant Licensing Action for Proposed Issuance of Orders Re Responses to Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. ML0218305842002-07-0808 July 2002 (HBRSEP2)-Additional Information Sent Via e-mail on June 6, 2002, by Carolina Power & Light Company (Cp&L) Regarding TS Change Request for Implementing Alternate Source Term ML0214202542002-05-13013 May 2002 Memo -Draft Response to RAI Received Via e-mail on 04/08/02 from CP&L on Relief Request RR-6 ML0214200522002-05-13013 May 2002 Memo - Draft Response to RAI Received Via e-mail on 04/08/02 from CP&L on Relief Request RR-6 ML0212301842002-04-26026 April 2002 Memo-Request for Additional Information Sent Via e-mail on January 10, 2002, to CP&L on a Relief Request NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy ML0710202191983-05-24024 May 1983 Memo from Themis Speis to Roger Mattson Re Draft CRGR Package on A-30, DC Power 2024-06-21 |
Contents
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2015 MEMORANDUM TO: George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects FROM: Donna N. Jackson /RA/
Project Engineer Reactor Projects Branch 4
SUBJECT:
PUBLIC MEETING
SUMMARY
- 2014 ANNUAL ASSESSMENT PUBLIC MEETING REGARDING H.B. ROBINSON STEAM ELECTRIC PLANT, DOCKET NO. 50-261 On April 29, 2015, the Nuclear Regulatory Commission (NRC) staff met with members of the public at the Hartsville Public Library. The purpose of the open house and poster board session was to provide opportunities to discuss the annual assessment of the H.B. Robinson Steam Electric Plant with the public for the period of January 1, 2014, through December 31, 2014.
The meeting notice and agenda are available in the Agencywide Documents Access and Management System at Accession No. ML15092A416. Enclosed are a list of attendees and copies of the poster boards displayed at the meeting.
Docket No.: 50-261 License No.: DPR-23
Enclosures:
- 1. List of Attendees
- 2. Poster Boards CONTACT: Donna N. Jackson, RII/DRP/RPB4 404-997-4892
ML15125A438 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH1 NAME DJackson JDodson GHopper DATE 05/05/2015 05/05/2015 05/05/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO