April 15, 2004 Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION
Dear Mr. Moyer:
Inservice inspections (ISIs) of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plant Technical Specifications, reporting requirements range from submitting a special report within 15 days following completion of each ISI of SG tubes that identifies the number of tubes plugged and/or repaired, to submitting a special report within 12 months following completion of the inspection that provides complete results of the SG tube ISI. The special report containing the complete results shall include the following:
- 1. Number and extent of tubes inspected;
- 2. Location and percent of wall-thickness penetration for each indication of an imperfection; and
- 3. Identification of tubes plugged and/or repaired.
A phone conference will be arranged with members of your staff to discuss the results of the SG tube inspections to be conducted during the upcoming refueling outage at H. B. Robinson Steam Electric Plant, Unit No. 2. This phone call will occur after the majority of the tubes have been inspected but before the SG inspection activities have been completed. Enclosed is a list of discussion points to facilitate this phone conference.
The NRC staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
List of Discussion Points cc w/encl: See next page
Mr. J. W. Moyer, Vice President April 15, 2004 Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION
Dear Mr. Moyer:
Inservice inspections (ISIs) of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plant Technical Specifications, reporting requirements range from submitting a special report within 15 days following completion of each ISI of SG tubes that identifies the number of tubes plugged and/or repaired, to submitting a special report within 12 months following completion of the inspection that provides complete results of the SG tube ISI. The special report containing the complete results shall include the following:
- 1. Number and extent of tubes inspected;
- 2. Location and percent of wall-thickness penetration for each indication of an imperfection; and
- 3. Identification of tubes plugged and/or repaired.
A phone conference will be arranged with members of your staff to discuss the results of the SG tube inspections to be conducted during the upcoming refueling outage at H. B. Robinson Steam Electric Plant, Unit No. 2. This phone call will occur after the majority of the tubes have been inspected but before the SG inspection activities have been completed. Enclosed is a list of discussion points to facilitate this phone conference.
The NRC staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
List of Discussion Points cc w/encl: See next page DISTRIBUTION:
PUBLIC CPatel ACRS WBurton MMurphy PDII-2 Reading EDunnington PFredrickson, RII OGC Adams Accession No. ML041060675 OFFICE PM:PDII/S2 LA:PDII/S2 SC:PDII/S2 NAME CPatel EDunnington WBurton (A)
DATE 4/15/04 4/15/04 4/15/04 OFFICIAL RECORD COPY
STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION CAROLINA POWER & LIGHT COMPANY H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 The following discussion points have been prepared to facilitate the phone conference arranged with the Carolina Power & Light Company to discuss the results of the steam generator (SG) tube inspections to be conducted during the upcoming refueling outage at H. B. Robinson Steam Electric Plant, Unit No. 2. This phone call will be arranged towards the end of the planned SG tube inspection interval but before the unit exits its refueling outage.
The NRC staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.
1.
Discuss whether any primary-to-secondary leakage existed in this unit prior to shutdown.
2.
Discuss the results of secondary side pressure tests.
3.
For each SG, provide a description of areas examined, including the expansion criteria utilized and type of probe used in each area. Also, be prepared to discuss your inspection of the tube within the tubesheet, particularly the portion of the tube below the expansion/transition region.
4.
Discuss any exceptions taken to the industry guidelines.
5.
Provide a summary of the number of indications identified to-date of each degradation mode and SG tube location (e.g., tube support plate, top-of-tubesheet, etc.). Also provide information such as voltages and estimated depths and lengths of the most significant indications.
6.
Describe repair/plugging plans for the SG tubes that meet the repair/plugging criteria.
7.
Discuss the previous history of SG tube inspection results, including any "look backs" performed, specifically for significant indications or indications where look backs are used in support of dispositioning (e.g., manufacturing burnish marks).
8.
Discuss, in general, new inspection findings (e.g., degradation mode or location of degradation new to this unit).
9.
Discuss your use or reliance on inspection probes (eddy current or ultrasonic) other than bobbin and typical rotating probes, if applicable.
- 10. Describe in-situ pressure test plans and results, if applicable and available, including tube selection criteria.
Enclosure
- 11. Describe tube pull plans and preliminary results, if applicable and available; include tube selection criteria.
- 12. Discuss the assessment of tube integrity for the previous operating cycle (i.e., condition monitoring).
- 13. Provide the schedule for SG-related activities during the remainder of the current outage.
- 14. Discuss the following regarding loose parts:
what inspections are performed to detect loose parts a description of any loose parts detected and their location within the SG if the loose parts were removed from the SG indications of tube damage associated with the loose parts the source or nature of the loose parts if known
- 15. SGs containing thermally treated tubing (Alloy 600 or 690). Discuss actions taken (if any) based on Seabrooks recent findings (Reference Information Notice 2002-21).
Mr. J. W. Moyer H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 cc:
Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspectors Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, South Carolina 29550 Mr. T. P. Cleary Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Chris L. Burton Director of Site Operations H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 J. F. Lucas Manager - Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N.C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Mr. Henry H. Porter, Assistant Director South Carolina Department of Health Bureau of Land & Waste Management 2600 Bull Street Columbia, South Carolina 29201 Mr. James W. Holt Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts, & Trowbridge 2300 N Street NW.
Washington, DC 20037-1128