MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 2024-06-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mm:h 11, 2016 LICENSEE: Duke Energy FACILITY: Brunswick Steam Electric Plant Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit No. 1; H. B. Robinson Steam Electric Plant, Unit No. 2
SUBJECT:
SUMMARY
OF FEBRUARY 1, 2016, PRE-SUBMITIAL MEETING WITH DUKE ENERGY REGARDING CONSOLIDATION OF EMERGENCY OPERATIONS FACILITIES On February 1, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting notice and agenda, dated January 7, 2016, are available in the Agencywide Documents Access and Management System at Accession No. ML16020A130. A list of attendees is enclosed.
The purpose of this meeting was to discuss a proposal by the licensee to consolidate the emergency operations facilities (EOFs) with its corporate headquarters EOF in Charlotte, NC.
The corporate consolidated EOF will be an expansion of the existing approved consolidated EOF for three other nuclear power plants owned and operated by the licensee.
Using ML16032A405, the licensee presented its approach and responded to the clarification questions from the NRC staff. Significant actions for the licensee to consider included the following:
- The NRC staff indicated because the proposed consolidation will utilize the previously approved consolidated EOF, which is only for Catawba, McGuire, and Oconee, adding the proposed plants would change the licensing bases for these three plants. Thus, the proposed licensing action will actually be for all 6 operating sites (11 units) plus the new Lee Nuclear Station Units 1 and 2 (Lee) currently under combined operating license (COL) review.
- As in the previously approved EOF consolidation, this proposal will locate the EOF more than 25 miles from the proposed additional plants. Such approval will require specific Commission approval and corresponding senior management reviews. Thus, there will be large uncertainties in the review schedule. In addition, the Fukushima accident raised additional attention to simultaneous multiplant events. Thus, the licensee needs to prepare a very comprehensive submittal to address the potential concerns, such as site interface from remote locations and operating experience with simultaneous multiplant events.
- Because the timing of the ongoing review of the Lee COL requires Atomic Safety and Licensing Board and NRC Commission hearings, the licensee should coordinate its operating reactor and new reactor licensing actions for the optimal sequencing before the submittal.
No regulatory decisions were made at this meeting. No member of the public called in to listen or provide comments to the staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-8480 or Andrew.Hon@nrc.gov.
Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-324, 50-325, 50-400 and 50-261
Enclosures:
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES FEBRUARY 1. 2016. PRE-SUBMITTAL MEETING WITH DUKE ENERGY REGARDING PROPOSED EMERGENCY OPERATIONS FACILITIES CONSOLIDATION Duke Energy Austin, Michael Nanney, Bryan Zaremba, Arthur Due, Joshua U.S. Nuclear Regulatory Commission Anderson, Joseph Beasley, Benjamin Barss, Dan Catts, Michelle Galvin, Dennis Hon, Andrew Johnson, Don Kahler, Robert Markley, Michael Miller, Ed Norris, Michael Rivera, Alison Thomas, Kenneth None Enclosure
ML16034A524 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/BC DORL/LPL2-2/PM NAME A Hon BClayton BBeasley A Hon DATE 2/16/16 2/16/16 3/10/16 3/11/16 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mm:h 11, 2016 LICENSEE: Duke Energy FACILITY: Brunswick Steam Electric Plant Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit No. 1; H. B. Robinson Steam Electric Plant, Unit No. 2
SUBJECT:
SUMMARY
OF FEBRUARY 1, 2016, PRE-SUBMITIAL MEETING WITH DUKE ENERGY REGARDING CONSOLIDATION OF EMERGENCY OPERATIONS FACILITIES On February 1, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting notice and agenda, dated January 7, 2016, are available in the Agencywide Documents Access and Management System at Accession No. ML16020A130. A list of attendees is enclosed.
The purpose of this meeting was to discuss a proposal by the licensee to consolidate the emergency operations facilities (EOFs) with its corporate headquarters EOF in Charlotte, NC.
The corporate consolidated EOF will be an expansion of the existing approved consolidated EOF for three other nuclear power plants owned and operated by the licensee.
Using ML16032A405, the licensee presented its approach and responded to the clarification questions from the NRC staff. Significant actions for the licensee to consider included the following:
- The NRC staff indicated because the proposed consolidation will utilize the previously approved consolidated EOF, which is only for Catawba, McGuire, and Oconee, adding the proposed plants would change the licensing bases for these three plants. Thus, the proposed licensing action will actually be for all 6 operating sites (11 units) plus the new Lee Nuclear Station Units 1 and 2 (Lee) currently under combined operating license (COL) review.
- As in the previously approved EOF consolidation, this proposal will locate the EOF more than 25 miles from the proposed additional plants. Such approval will require specific Commission approval and corresponding senior management reviews. Thus, there will be large uncertainties in the review schedule. In addition, the Fukushima accident raised additional attention to simultaneous multiplant events. Thus, the licensee needs to prepare a very comprehensive submittal to address the potential concerns, such as site interface from remote locations and operating experience with simultaneous multiplant events.
- Because the timing of the ongoing review of the Lee COL requires Atomic Safety and Licensing Board and NRC Commission hearings, the licensee should coordinate its operating reactor and new reactor licensing actions for the optimal sequencing before the submittal.
No regulatory decisions were made at this meeting. No member of the public called in to listen or provide comments to the staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-8480 or Andrew.Hon@nrc.gov.
Andrew Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-324, 50-325, 50-400 and 50-261
Enclosures:
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES FEBRUARY 1. 2016. PRE-SUBMITTAL MEETING WITH DUKE ENERGY REGARDING PROPOSED EMERGENCY OPERATIONS FACILITIES CONSOLIDATION Duke Energy Austin, Michael Nanney, Bryan Zaremba, Arthur Due, Joshua U.S. Nuclear Regulatory Commission Anderson, Joseph Beasley, Benjamin Barss, Dan Catts, Michelle Galvin, Dennis Hon, Andrew Johnson, Don Kahler, Robert Markley, Michael Miller, Ed Norris, Michael Rivera, Alison Thomas, Kenneth None Enclosure
ML16034A524 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/BC DORL/LPL2-2/PM NAME A Hon BClayton BBeasley A Hon DATE 2/16/16 2/16/16 3/10/16 3/11/16