MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML1108908992011-03-30030 March 2011 Attendance List of 03/24/11 Meeting Regarding Annual Assessment of H.B. Robinson Steam Electric Plant ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004362005-03-24024 March 2005 NRC CY2004 Annual Assessment Meeting - Robinson - Hartsville, South Carolina, March 24, 2005 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0410600042004-03-30030 March 2004 Presentation of NRC CY2003 Annual Assessment Meeting for H.B. Robinson ML0403505052004-01-0707 January 2004 Meeting Handouts with Progress Energy to Discuss Fire Protection Initiatives ML0327203572003-09-25025 September 2003 Meeting Handout Materials for 09/25/03 Meeting to Discuss CP&L Request for Relaxation from the NRC Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at PWRs 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23087A2922023-04-12012 April 2023 2022 Annual Assessment Meeting ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22151A2652022-05-31031 May 2022 Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21053A0472021-02-25025 February 2021 Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request ML20132A0002020-05-11011 May 2020 EOC Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML16105A3342016-04-20020 April 2016 H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1032006182010-11-16016 November 2010 Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides 2023-04-12
[Table view] |
Text
Robinson Nuclear Plant March 28, 2010 Event Review Nuclear Regulatory Commission May 12 12, 2010 Enclosure 2
Introduction Participants Purpose Eventt overview E i Event Review Team C
Corrective ti actions ti Lessons being shared with fleet/industry Summary 2
Enclosure 2
Event Overview Tom Natale Event Review Team Member Enclosure 2
Event Overview Event Initiated at 1852 Procedure flow E i Equipment t challenges h ll Operator response/actions Timeline Review 4
Enclosure 2
Event Overview 4KV S YSTEM LOADS KVAC*F1GURE* j 4 160 V BUS NO. I RL..~CTO R COOLAN T PUl\IP "A" 5211
!\lAIN FEED'VATER P lJ-:\lP "A " 52 /3 C IRClJ"LATl:'G ' VATER Pill lP "A " 5212 C O:'\"DE:-;SATE P lJ-:\ IP "A " 5216 HEATER DR~ Pill l P "A " 5215 STATION SERVICE TR~SFORl\IER 2B 52/4 B US 1 A ...'"D 2 TIE BREAKER 52110 4 160 V B US NO.2 RL..<\.CTO R COOL~T PUl\IP "C" 52114 STATION S ERVICE TR~ SFORl\ IER 2A and 2F 5 2113 4 160 ,. B US N O.3 STATION SER VICE TR<\.NSFORl\IER 2C a n d 2G 5 2115 4 160 V B US NO.4 REACTO R COOLA...N T P Ul\ IP "B " 52127
. lAIN FEED'VATER P lJ-:\lP "B " 52/ 26 C IRCULATl:'G ' VATER Pill IP "B " 52123 CO:'\"DE:-;SA TE P lJ-:\ IP "B " 5 2122 HEATER DR~ Pill I P "B " 5 2125 STATION SERVICE TR~ SFORl\IER 2D 52128 B US 3 A..'"D 4 TIE BREAKER 52119 4160 V B US 5 5212 4 4160 V B US NO.5 C IRCULATING ' VATER PU!\lP "C" 52133 STATION SERVICE TR~ SFORl\IER 2E 52/ 32 5 Propss Energy Enclosure 2
Event Overview TO 2-"2-oKV SWI T CiHrlf....R D 6
Enclosure 2
Event Overview 7
Enclosure 2
Event Review Team Bob Duncan Team Lead Enclosure 2
Event Review Event Response Team Makeup:
Bob Duncan ((VP NOD)) - Team Lead Mark Rigsby (Manager, Site Support CR3)
O Organizational i ti l Eff Effectiveness ti L Lead d
George Attarian (Manager, (Manager Major Projects)
Technical Engineering Lead 9
Enclosure 2
Event Review Duncan Management Sponsor Attarian Rigsby Support for Technical Eng. Lead Organizational Eff. Lead Event Team McCabe/Castell Riley - Electrical Natale - Work Licensing Support Management Georgeson -
Electrical/I&C Cole Curry - Operations Corp Support Communications H
Hooper - Electrical El t i l Pierce -Training Bardauskas Root Cause Team Lead Koschmeder - Brown - INPO Electrical/I&C Loanee Grubb - CAP Training/Operations Organizational Root McNamara - Cause Transmission/ Spellman -
System Operations Young Engineering Technical Team Sutter Assistance Ertman - Fire Operations Analysis 10 Enclosure 2
Event Review External Assistance Fire Forensics - Richard Hanson and Associates Fire Modeling - Hughes Associates Breakers/Switchgear - Homewood Products, Westinghouse, g , Areva Reactor Coolant Pump parameters -
Westinghouse, Areva C bl - EPRI Cables Investigation Methods 11 Enclosure 2
Investigation Results: Operations Monitoring of Critical Safety Functions Sub-criticality C
Core cooling li Heat sink RCS integrity RCS inventory Containment integrity 12 Enclosure 2
Investigation Results: Equipment Cable Modifications (1986)
Cable specifications Cable installation/support Breaker 52/24 Control C t l power ffuse Knowledge gap pertaining to control power circuit Evaluation of work order 13 Enclosure 2
Investigation Results: Equipment VCT - RWST AutoA t Swap S
Comparator jumper configuration Post-maintenance testing Instrument Bus 3 14 Enclosure 2
Investigation Results: Operations Command and Control/Communication Ch ll Challenges Safety injection anticipation RCS cooldown mitigation Procedure utilization (APPs, AOP closure)
Status briefs/crew updates MCR distraction management Alert declaration 15 Enclosure 2
Investigation Results: Operations Additional Insights Path 1 & foldout strategy AOP-041 Monitoring of Key Parameters RCP seall cooling li FCV-626 closure Volume control tank level Charging pump suction swap-over RCS temperature and pressure 16 Enclosure 2
Investigation Results: Organization Operator p Training g
Site Event Response Organizational Effectiveness Operating Experience 17 Enclosure 2
Robinson Nuclear Plant March 28, 28 2010 Event Review Corrective Actions 18 Enclosure 2
Equipment Warren Farmer Manager g RNP Engineering g g Enclosure 2
Corrective Actions: Equipment Inspect RCP Seals (R)
Inspect B Charging Pump (R)
Replace UAT (R)
Health Assessment of SUT (R) 4 KV Cable Extent of Condition Inspection (R)
Fleet MV Cable Review 20 Enclosure 2
Corrective Actions: Equipment FCV-626 RCP Thermal Barrier Isolation Modification Implementation (R)
Implement Modification for Battery Charger Auto-restart (R)
( )
Troubleshooting Instrument Bus 3 (R)
Review and Conduct as Necessary PMTs on Past NUS Comparator Replacements (R)
Develop Fleet Standard for PMT on Protection and Control Circuits D
Develop l C Configuration fi ti D Documentt for f NUS MModules d l 21 Enclosure 2
Operations Scott Saunders Plant General Manager g
Enclosure 2
Corrective Actions: Operations Leadershipp Assessment ((R))
Crew Reconstitution (R)
Training Actions (R)
Command and Control (R)
Key Parameter Monitoring (R)
Fleet PGM Challengeg of Start-up p ((R))
23 Enclosure 2
Procedures Scott Saunders Plant General Manager g
Enclosure 2
Corrective Actions: Procedures CAPR to revise work management process to provide specific guidance for impact reviews of new Work Requestsq including:
g Guidance for Operations impact reviews Guidance for the Work Order prioritization p
Clarification of expectations for what Validation of a deficiency entails Guidance for conversion of Work Requests to Work Orders 25 Enclosure 2
Corrective Actions: Procedures EOP Foldout revision (R)
AOP-041 Strategy (R)
GP-004 Post-trip stabilization (R)
AOP-024 Loss of instrument bus 26 Enclosure 2
Organization Eric McCartney Vice-President Enclosure 2
Corrective Actions: Organization Review of Outstanding WR/WO (R)
Priority Scope Risk T i i Training Breaker control power Breaker indicating lights 28 Enclosure 2
Corrective Actions: Organization Performance Improvement Formalize follow up to Oversight and Fleet identified performance issues Implement CR3 Performance Improvement Model across the fleet Equipment Performance Case C study t d employee l and d lleadership d hi ttraining i i Revise PMT strategy for risk informed application Organizational Response Revise event response procedures to provide for pp response a technical support p for both forced outage and d non-forced f d outage events 29 Enclosure 2
Plant Design Changes Warren Farmer RNP Manager Engineering Bob Rishel Manager Probabilistic Safety Assessment Enclosure 2
Plant Design Changes Event Related Risk Profile Improvements Battery Charger Auto-load Modification (R)
FCV-626 Power Dependency Modification (R) 4 KV Ground Detection Seal-In Circuit (R)
Dedicated Shutdown Diesel Auto-Start ERFIS SSeall Fl Flow Annunciation A i ti 2nd Start Up Transformer Independent Emergency Power for Deep-Well Pumps 31 Enclosure 2
Plant Design Changes Additional Modifications for Overall Risk Profile Improvement SW Cross Cross-Connect Connect Isolation Valve (R) 4th AFW Pump 32 Enclosure 2
Fleet & Industry Lessons Learned Chris Burton Vice-President - Harris Plant Wayne Gurganious Director Fleet Training Enclosure 2
Fleet & Industry Lessons Learned Operations Stronger pursuit of abnormal plant conditions Electrical systems fundamental knowledge C
Crew composition i i considerations id i Training Scenario design Evaluation standards Procedures EOP and d AOP improvements i t 34 Enclosure 2
Operating Experience PWROG INPO IIssued d Si Significant ifi t Event E t Notification N tifi ti On-site during investigation P t to Post t Nuclear N l Network N t k Chief Nuclear Officer Shared insights with peers at INPO Executive Advisoryy Group p conference 35 Enclosure 2
Summary Eric McCartney Vice-President Jim Scarola Sr. Vice-President and Chief Nuclear Officer Enclosure 2
Appendices 37 Enclosure 2
0 10 20 30 40 50 60 70 80 90 100 28-Ma ar-10 18:43 28-Ma ar-10 18:50 28-Ma ar-10 18:57 28-Ma ar-10 19:04 Charging 28-Ma ar-10 19:12 28-Ma ar-10 19:19 Header Pressure RCS Pressure 28-Ma ar-10 19:26 FCV-626 38 28-Ma ar-10 19:33 Opened 28-Ma ar-10 19:40 28-Ma ar-10 19:48 28-Ma ar-10 19:55 28-Ma ar-10 20:02 28-Ma ar-10 20:09 0
500 2000 2500 LT-115 VCT LEVEL 1500 FT-122 RCS CHARGING 1000 Seal Injection / Charging / VCT Level FLOW
-20 0 20 40 60 80 100 28-Mar--10 18:43 28-Mar--10 18:50 28-Mar--10 18:57 28-Mar--10 19:04 28-Mar--10 19:12 28-Mar--10 19:19 28-Mar--10 19:26 CVC-310A Opens 39 28-Mar--10 19:33 28-Mar--10 19:40 RCP Labyrinth Seal dP 28-Mar--10 19:48 28-Mar--10 19:55 28-Mar--10 20:02 28-Mar--10 20:09 PT-131 RCP A LABYRINTH SEAL PT-128 RCP B LABYRINTH SEAL PT-125 RCP C LABYRINTH SEAL dP in inches water FT 122 RCS CHARGING FLOW FT-122 DP DP DP
RCP Bearing Water Temperature 40 Enclosure 2
RCP Seal Leakoff Temperature 41 Enclosure 2
RCS Temperature and Pressure 600 2500 RCS Pressure 2245 to ~1300 1300 psig RCS Temperature:
500 2000 566 to 442 degrees F 400 1500 300 T-AVE WEIGHTED BY LEG VOLUMES 1000 PT-402 RCS WIDE RANGE 200 PRESSURE Loss of IB-3 500 100 0 0 28-Mar-1 10 18:43 28-Mar-1 10 18:50 28-Mar-1 10 18:57 28-Mar-1 10 19:04 28-Mar-1 10 19:12 28-Mar-1 10 19:19 28-Mar-1 10 19:26 28-Mar-1 10 19:33 28-Mar-1 10 19:40 28-Mar-1 10 19:48 28-Mar-1 10 19:55 28-Mar-1 10 20:02 28-Mar-1 10 20:09 42 Enclosure 2