Summary of Meeting with Duke Energy Progress, Inc. to Discuss a Proposed License Amendment Requests Regarding a 24 Month Fuel Cycle and an Alternative Source Term for Robinson, Unit No. 2
ML16123A031
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/26/2016
From: Dennis Galvin
Plant Licensing Branch II
To:
Duke Energy Progress
Galvin D
Shared Package
ML16123A033 List:
References
CAC MF7503
Download: ML16123A031 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 26, 2016 LICENSEE: Duke Energy Progress, Inc.

FACILITIES: H. B. Robinson Steam Electric Plant Unit No. 2

SUBJECT:

SUMMARY

OF APRIL 20, 2016, MEETING WITH DUKE ENERGY PROGRESS, INC., TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS REGARDING A 24 MONTH FUEL CYCLE AND AN ALTERNATIVE SOURCE TERM FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 On April 20, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, Inc. (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss related proposed license amendment requests (LARs) regarding transition to a 24-month fuel cycle and an alternative source term (AST) for the H. B.

Robinson Steam Electric Plant Unit No. 2 (Robinson). The meeting notice and agenda, dated April 5, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML16096A459. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML16105A334). During the meeting, the licensee discussed two related proposed LARs:

( 1) transition to a 24 month fuel cycle, and (2) a revision to the AST. Although these two LARs both support a 24-month fuel cycle, the licensee indicated they will be written to allow distinct licensing actions. The licensee presented a summary of the 24-month fuel cycle proposed LAR content including (1) engineering changes, (2) instrument drift and uncertainty methodology, (3) instrument drift analysis and failure review methodology, and (4) fuel and core design. The licensee indicated it considered Oconee and Indian Point precedents and associated requests for information. The licensee presented a summary of the AST proposed LAR content including

( 1) guidance used, (2) source term changes, and (3) dose analysis changes. The licensee indicated that it plans to submit the LARs in the July to August 2016 timeframe with a requested NRC approval date of late summer 2018.

The NRC staff discussed information requested on previous similar applications. The licensee indicated that it would consider NRC staff comments in the preparation of the LAR.

No regulatory decisions were made at the meeting. No members of the public were in attendance; no Public Meeting Feedback forms were received.

Please direct any inquiries to Dennis J. Galvin at 301-415-6256 or Dennis.Galvin@nrc.gov.

Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES APRIL 20. 2016. MEETING WITH DUKE ENERGY PROGRESS. INC.

H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS REGARDING A 24-MONTH FUEL CYCLE AND AN ALTERNATIVE SOURCE TERM U.S. Nuclear Regulatory Commission J. Dean D. Galvin A. Klein E. Oesterle M. Panicker J. Parillo D. Saenz P. Snyder D. Woodyatt Duke Energy Progress, Inc.

S. Connelly J. Kammer J. Mungo G. Phil G. Swider Enclosure

Please direct any inquiries to Dennis J. Galvin at 301-415-6256 or Dennis.Galvin@nrc.gov.

IRA/

Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2Mai1Center Resource LPL2-2 R/F RidsNrrPMRobinson Resource RidsNrrDorllpl2-2 Resource TWertz, NRR RidsNrrLABClayton Resource RidsACRS_MailCTR Resource JBowen, OEDO RidsNrrDssSnpb Resource RidsNrrDssStsb Resource DGalvin, NRR MPanicker, NRR JParillo, NRR DSaenz, NRR PSnyder, NRR DWoodyatt, NRR RidsNrrDraArcb Resource RidsNrrDssSrxb ADA MSAccession Nos. PK G ML16123A033 s ummary ML16123A031 *by e-mail OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SNPB/BC DSS/SNPB/BC(A)*

NAME DGalvin BClayton JDean EOsterle DATE 5/4/16 5/3/16 5/24/16 5/4/16 OFFICE DSS/STSB/BC* DRA/ARCB/BC DORL/LPL2-2/BC DORL/LPL2-2/PM NAME AKlein US hoop BBeasley DGalvin DATE 5/4/16 5/18/16 5/25/16 5/26/16 OFFICIAL RECORD COPY