Category:Meeting Notice
MONTHYEARPMNS20241326, Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding2024-10-17017 October 2024 Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding PMNS20240948, Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station2024-07-23023 July 2024 Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station PMNS20240596, Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 22024-04-26026 April 2024 Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 2 PMNS20240492, Duke Sites Annual Assessment Meeting2024-04-10010 April 2024 Duke Sites Annual Assessment Meeting ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230332, And Oconee Nuclear Station Annual Assessment Meeting for 20222023-03-30030 March 2023 And Oconee Nuclear Station Annual Assessment Meeting for 2022 PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20221105, Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 22022-10-25025 October 2022 Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 2 PMNS20221085, Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire)2022-10-25025 October 2022 Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire) PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220232, And Oconee Nuclear Station Annual Assessment Meeting for 20212022-03-10010 March 2022 And Oconee Nuclear Station Annual Assessment Meeting for 2021 PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20211387, Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 22021-10-25025 October 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 2 PMNS20211019, Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations2021-08-0303 August 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210274, Annual Assessment Meeting2021-03-31031 March 2021 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15208A0062015-07-27027 July 2015 Public Teleconference to Discuss Potential License Amendment Request Regarding Ice Condenser Door Position Monitoring ML14086A4652014-03-27027 March 2014 Notice of Public Pre-Application Teleconference with Duke Power to Discuss Planned McGuire TSTF-477 License Amendment Request ML14076A1192014-03-17017 March 2014 Notice Public Meeting to Provide the Annual Assessment of the Catawba Nuclear Station and to Discuss NRC Reactor Oversight Process ML14076A1242014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear Station ML14066A0732014-03-0707 March 2014 Notice of Category 3 Public Meeting/Open House to Discuss Annual Assessment of Catawba Nuclear Station ML14066A2432014-03-0707 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear Station ML14066A0742014-03-0707 March 2014 May 08, 2014 Notice of Category 3 Public Meeting/Open House to Discuss Regarding McGuire Annual Assessment ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC IR 05000261/20130082013-07-18018 July 2013 Notice of Regulatory Conference to Discuss One Finding and the Associated Apparent Violation for the H. B. Robinson, Unit 2, (Ref Inspection Report 05000261-13-008) ML13198A1732013-07-17017 July 2013 Notice of Forthcoming Pre-Application Teleconference with Duke Energy Carolinas, LLC, McGuire Units 1 and 2 ML13191A9592013-07-15015 July 2013 Notice of Pre-Application Meeting with Duke Energy Carolinas, LLC, McGuire Units 1 & 2, to Discuss with Licensee Its Proposed License Amendment Request to Technical Specification 3.8.4 Condition a to Allow Replacement of Existing Shared ... ML13135A5962013-05-16016 May 2013 Cancelled 05/23/2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13127A4352013-05-0909 May 2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13094A4202013-04-0404 April 2013 Meeting Notice with Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the Catawba Nuclear Station ML13094A3892013-04-0404 April 2013 Meeting Notice with Public to Discuss the NRC Reactor Oversight Process Annual Assessment of Your H. B. Robinson Steam Electric Plant ML13094A4172013-04-0404 April 2013 Notice of Meeting with Public to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear Station ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12076A1532012-03-16016 March 2012 4/11/2012 - Meeting Announcement - Category 1 Public Meeting - Annual Assessment of H. B. Robinson Steam Electric Plant 2024-07-23
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20241326, Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding2024-10-17017 October 2024 Notice of Presubmittal Meeting with Duke Energy to Discuss Their Plans to Submit a License Amendment Request for Adoption of PAD5 Code, Fsloca, and Use of Axiomtm Fuel Rod Cladding PMNS20240948, Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station2024-07-23023 July 2024 Regulatory Conference with Duke Energy Carolinas, LLC (Duke) Catawba Nuclear Station PMNS20240596, Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 22024-04-26026 April 2024 Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 2 PMNS20240492, Duke Sites Annual Assessment Meeting2024-04-10010 April 2024 Duke Sites Annual Assessment Meeting ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230332, And Oconee Nuclear Station Annual Assessment Meeting for 20222023-03-30030 March 2023 And Oconee Nuclear Station Annual Assessment Meeting for 2022 PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting ML22336A0382022-12-0808 December 2022 Presentation Slides December 8, 2022, pre-submittal Meeting to Discuss Proposed License Amendment Request Regarding TS 3.7.11, Control Room Area Chilled Water System (Cracws) PMNS20221105, Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 22022-10-25025 October 2022 Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 2 PMNS20221085, Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire)2022-10-25025 October 2022 Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire) PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220232, And Oconee Nuclear Station Annual Assessment Meeting for 20212022-03-10010 March 2022 And Oconee Nuclear Station Annual Assessment Meeting for 2021 ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML21336A1422021-12-0707 December 2021 December 7, 2021, Pre-submittal Presentation Slides Regarding Embedded Flaw Repair Relief Request - Revised PMNS20211387, Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 22021-10-25025 October 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 2 PMNS20211019, Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations2021-08-0303 August 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210274, Annual Assessment Meeting2021-03-31031 March 2021 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15343A0712015-12-23023 December 2015 September 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard ML15208A0062015-07-27027 July 2015 Public Teleconference to Discuss Potential License Amendment Request Regarding Ice Condenser Door Position Monitoring ML14086A4652014-03-27027 March 2014 Notice of Public Pre-Application Teleconference with Duke Power to Discuss Planned McGuire TSTF-477 License Amendment Request ML14076A1192014-03-17017 March 2014 Notice Public Meeting to Provide the Annual Assessment of the Catawba Nuclear Station and to Discuss NRC Reactor Oversight Process ML14076A1242014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear Station ML14066A2432014-03-0707 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear Station ML14066A0732014-03-0707 March 2014 Notice of Category 3 Public Meeting/Open House to Discuss Annual Assessment of Catawba Nuclear Station ML14066A0742014-03-0707 March 2014 May 08, 2014 Notice of Category 3 Public Meeting/Open House to Discuss Regarding McGuire Annual Assessment ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13198A1732013-07-17017 July 2013 Notice of Forthcoming Pre-Application Teleconference with Duke Energy Carolinas, LLC, McGuire Units 1 and 2 ML13191A9592013-07-15015 July 2013 Notice of Pre-Application Meeting with Duke Energy Carolinas, LLC, McGuire Units 1 & 2, to Discuss with Licensee Its Proposed License Amendment Request to Technical Specification 3.8.4 Condition a to Allow Replacement of Existing Shared ... ML13135A5962013-05-16016 May 2013 Cancelled 05/23/2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13127A4352013-05-0909 May 2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML11180A0162011-07-0101 July 2011 Notice of Forthcoming Meeting with Carolina Power & Light Company Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, to Introduce the New Management Team and Discuss Strategic Plan ML1112308322011-05-0303 May 2011 End of Cycle Public Meeting Summary 2024-07-23
[Table view] Category:Memoranda
MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22300A0742023-01-11011 January 2023 Final Environmental Assessment and Finding of No Significant Impact for the Duke Energys Updated Decommissioning Funding Plans Submitted in Accordance with 10 CFR 72.30(C) for Catawba Nuclear Station Independent Spent Fuel Storage Installat ML22299A1052023-01-11011 January 2023 Memo to File - McGuire Final EA 2017+19+21 ML22299A0212023-01-10010 January 2023 Memo to File - Robinson Final EA 2017, 2019, 2021 ML21145A0182021-05-25025 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regard the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML21056A5502021-04-22022 April 2021 Memo to File - Ea/Fonsi for McGuire DFP ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20266G4412020-09-24024 September 2020 Insights Obtained from Review of Robinson Seismic Probabilistic Risk Assessment ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19098B4482019-04-0808 April 2019 Public Meeting Summary ML19088A1362019-03-29029 March 2019 Public Meeting Summary ML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18117A2212018-04-27027 April 2018 Summary of Public Meeting with Catawba Nuclear Station Concerning Annual Assessment of Units 1 and 2 for Period of January 01, 2017 - December 21, 2017 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17151A3372017-06-0202 June 2017 Recommendation for Non-Acceptance with Opportunity to Supplement of McGuire Nuclear Station Units 1 and 2 Technical Specifications Completion Time Extension Request for Failure to Supply Information (CACs MF9673, MF9674) ML17110A1862017-04-20020 April 2017 Summary of Public Meeting - McGuire, Units 1 and 2 to Discuss Concerning Annual Assessment ML17107A0642017-04-17017 April 2017 Summary of Public Meeting with Catawba, Units 1 and 2 ML16111B2472016-04-28028 April 2016 Request for Additional Information Re. License Amendment Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML16081A3352016-03-17017 March 2016 Summary of Meeting with Public Concerning Annual Assessment of Catawba Nuclear Station, Units 1 and 2 ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15342A2052016-01-0808 January 2016 Regulatory Audit in Support of License Amendment Request to Adopt NFPA 805 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15244B2522015-08-31031 August 2015 Report on Trip to Catawba on August 26-27, 2015 ML15138A3392015-06-0101 June 2015 Summary of Public Teleconference Regarding Potential Submission of a License Amendment Request for a One-Time Extension of Completion Time for Nuclear Service Water System ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15106A0302015-04-15015 April 2015 Meeting Summary with Public to Discuss the Annual Assessment of Catawba Nuclear Station, Units 1 and 2 ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15083A0832015-03-10010 March 2015 TS Bases Updates ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML14126A6792014-05-0606 May 2014 Summary of Public Meeting with Catawba, Units 1 & 2 to Discuss Annual Assessment ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML14077A1312014-03-18018 March 2014 Special Inspection Charter to Evaluate the Abnormal Rotation of the Piston Crankshaft Bearings on the Catawba Unit 1 Diesel Generators ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13198A1732013-07-17017 July 2013 Notice of Forthcoming Pre-Application Teleconference with Duke Energy Carolinas, LLC, McGuire Units 1 and 2 ML13191A9592013-07-15015 July 2013 Notice of Pre-Application Meeting with Duke Energy Carolinas, LLC, McGuire Units 1 & 2, to Discuss with Licensee Its Proposed License Amendment Request to Technical Specification 3.8.4 Condition a to Allow Replacement of Existing Shared ... ML13204A1162013-06-26026 June 2013 SLC Manual Update ML13135A5962013-05-16016 May 2013 Cancelled 05/23/2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations 2024-06-21
[Table view] |