NRC Generic Letter 1989-11

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy
ML031150340
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 06/30/1989
From: Partlow J
Office of Nuclear Reactor Regulation
To:
References
GL-89-011, NUDOCS 8906300178
Download: ML031150340 (5)


June 30, 1989 V.k MEMORANDUM FOR: All NRR Project Managers FROM: James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation SUBJECT: GENERIC LETTER 89-11 The enclosed Generic Letter (GL) informs all boiling water reactor (BWR)

licensees and applicants of the staff's resolution of Generic Issue 101,

"Boiling Water Reactor Water Level Redundancy." The staff concluded from the evaluation of this issue that no further regulatory actions are needed. The technical basis for this conclusion is documented in NUREG/CR-5112, "Evaluation of Boiling Water Reactor Water-Level Sensing Line Break and Single Failure."

NUREG/CR-5112 has been sent to all BWR licensees and construction permit holders.

The GL does not ask for program submittals, therefore, no technical reviews of licensee responses are anticipated. No Lead Project Manager has been assigned to this GL. However, if there should be questions, the NRR technical contact is Tim Collins (x20897).

ORIGINAL SIGHED BY JAMES PARTLOW

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:

Generic Letter 89-11 cc: J. Taylor, EDO

H. Thompson, EDO

All Division Directors, NRR

All Associate Directors, NRR

Project Directors, NRR

Regional Administrators J. Conran, CRGR

S. Treby, OGC

CONTACT

Peter Wen, NRR

492-1172

§rkAp,6 DISTRIBUTION w/enclosure JGPartlow, NRR

CERossi, NRR

FJMiraglia, NRR

CHBerlinger, NRR

71/ -4 P

Eac70

tv crT/

PCWen, NRR JACalvo, NRR

CHaughney, NRR JOThoma, NRR

,-,-Central Files - DCS

DOEA R/F OGCB R/F

PWen R/F TCollins, NRR

  • SEE PREV1OUS CONCURRENCE ADP/N #I

JGP tlow R6E /8P

  • OGCB:DOEA:NRR *C/OGCB:DOEA:NRR *D/DOEA:NRR

PCWen CHBerlinger CERossi Fif ~_ _lia )

06/20/89 6/20/89 06/20/89 le,1w

\iaqi,+,;9 I? RCFfE NINTER COPY

.PA RECL, x z

0 UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C.20555 June 30, 1989 TO: ALL HOLDERS OF OPERATING LICENSES OR CONSTRUCTION PERMITS

FOR BOILING WATER REACTORS

SUBJECT: RESOLUTION OF GENERIC ISSUE 101 'BOILING WATER

REACTOR WATER LEVEL REDUNDANCY" (GENERIC LETTER 89-11)

This generic letter is being issued to:

(1) inform you of the staff's resolution of the subject generic issue, and

(2) request that you continue to maintain appropriate procedures and training for the operators so that they may readily identify and mitigate the consequences of a leak or break in a reactor water-level instrument line.

For resolution of Generic Issue (GI) 101, "Boiling Water Reactor [BWR] Water Level Redundancy," instrument line breaks coupled with an additional independent single failure in a control or protection system were evaluated. For the purposes of this evaluation, all BWR plant designs were placed into one of five groups, based on their system characteristics. A plant from each group was then evaluated.

The reactor water-level measurement systems in BWRs consist of a reference water leg, a variable water leg, and a differential pressure measuring transmit- ter. The reference water leg is connected to a condensing chamber and to the reactor vessel steam space. The variable water leg is connected to the reactor vessel at an elevation below the expected normal range of water level. The actual water level in the reactor vessel is then determined by measuring the differential pressure between the reference water leg and the variable water leg. These pressure sensors provide input to the protection systems and to the control systems.

The GI 101 concern is that a leak or break in the Instrument sensing line that is connected to the constant head condensing chamber could cause the reference water leg level to decrease. This decrease In the reference water leg level could cause all the differential pressure instruments connected to that line to indicate a false high reactor water level. Under these conditions, the feed- water system may automatically reduce the feedwater flow into the reactor vessel, causing the actual reactor water level to decrease. The presence of this false high water level signal may also prevent automatic operation of the emergency safety systems, such as High Pressure Coolant Injection System/High Pressure Core Spray System, Reactor Core Isolation Cooling System, or Automatic Depressurization System in some designs, and may confuse the operator when trying to assess the actual water level in the vessel.

895oiUU178

Generic Letter 89-11 -2- June 30, 1989 The NRC staff has completed its evaluation of GI 101 and has concluded that all BWR designs, in conjunction with operator training and procedures, provide adequate protection in the event of an instrument line break in any of the reactor vessel water-level instrument systems. The staff believes that emer- gency procedures for the operator to identify and mitigate the consequences of instrument line breaks exist at all plants and that the reactor operators are being trained to achieve safe shutdown, if needed. The technical basis for this conclusion is documented in NUREG/CR-5112, "Evaluation of Boiling Water Reactor Water-Level Sensing Line Break and Single Failure." NUREG/CR-5112 has been mailed to all BWR licensees and construction permit holders.

The NRC is, therefore, not proposing that the BWR licensees and applicants take any action. However, the staff is providing to all licensees and applicants of BWR plants the results of the analysis conducted for this review. This information is presented in NUREG/CR-5112. Plant-specific design features, such as common sensing lines for the water-level instrumentation, automatic initiation logic for vital protection systems, inhibition of vital protection systems, and additional single failures of safety-related and non-safety- related systems, were considered. The results, including the value impact analyses of the alternatives considered for plant improvements for BWR plant designs, are provided for information. Each addressee is expected to review the information to verify that the design of its facility has been correctly represented. It may also be prudent for some licensees to consider a reassess- ment of plant procedures and operator training to ensure that plant operators can readily detect and mitigate a leak or break of a sensing line.

No written response or specific action is required by this letter. Therefore, no clearance from the Office of Management and Budget is required.

If you have any questions on this matter, please contact the technical contact listed below or your project manager.

Sincerely, Jes G. Partow A sociate Director for Projects Office of Nuclear Reactor Regulation Enclosure: List of Recently Issued NRC Generic Letters

Technical Contact:

Tim Collins, NRR

(301) 492-0897 Andrew J. Szukiewicz, RES

(301) 492-3914

-

ENCLOSURE

LIST OF RECENTLY ISSUED GENERIC LETTERS

Generic Date of Letter No. Subject Issuance Issued To

89-11 GENERIC LETTER 89-11: 6/30/89 ALL BWR PLANTS &

RESOLUTION OF GENERIC ISSUE ALL LISTINGS

101 "BOILING WATER REACTOR APPLICABLE TO

WATER LEVEL REDUNDANCY" GENERIC LETTERS &

VENDORS, ETC.

89-10 GENERIC LETTER 89-10: 6/28/89 LICENSEES TO ALL

SAFETY-RELATED MOTOR-OPERATED POWER REACTORS,

VALVE TESTING AND SURVEILLANCE BWRS, PWRS, AND

VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-09 ASME SECTION III COMPONENT 5/8/89 ALL HOLDERS OF LIGHT

REPLACEMENTS WATER REACTOR

OPERATING LICENSES

89-08 ISSUANCE OF GENERIC LETTER 5/2/89 LICENSEES TO ALL

89-08: EROSION/CORROSION - POWER REACTORS,

INDUCED PIPE WALL THINNING - BWRS, PWRS, AND

10 CFR §50.54(f) VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-07 GENERIC LETTER 89-07, POWER 4/28/89 LICENSEES TO ALL

REACTOR SAFEGUARDS CONTINGENCY BWRS, PWRS, AND

PLANNING FOR SURFACE VEHICLE VENDORS IN ADDITION

BOMBS TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-06 TASK ACTION PLAN ITEM I.D.2 - 4/12/89 LICENSEES OF ALL

SAFETY PARAMETER DISPLAY POWER REACTORS,

SYSTEM - 10 CFR §50.54(f) BWRS, PWRS, HTGR,

AND NSSS VENDORS

IN ADDITION TO

GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-05 PILOT TESTING OF THE 4/4/89 LICENSSES OF ALL

FUNDAMENTALS EXAMINATION POWER REACTORS AND

APPLICANTS FOR A

REACTOR OPERATOR'S

LICENSE UNDER

10 CFR PART 55

-2-

-2- VI June 30, 1989 Generic Letter 89-11 The NRC staff has completed its evaluation of GI 101 and has concluded that all BWR designs, in conjunction with operator training and procedures, provide adequate protection in the event of an instrument line break in any of the reactor vessel water-level instrument systems. The staff believes that emer- gency procedures for the operator to identify and mitigate the consequences of instrument line breaks exist at all plants and that the reactor operators are being trained to achieve safe shutdown, if needed. The technical basis for this conclusion is documented in NUREG/CR-5112, "Evaluation of Boiling Water Reactor Water-Level Sensing Line Break and Single Failure." NUREG/CR-5112 has been mailed to all BWR licensees and construction permit holders.

The NRC is, therefore, not proposing that the BWR licensees and applicants take any action. However, the staff is providing to all licensees and applicants of BWR plants the results of the analysis conducted for this review. This information is presented in NUREG/CR-5112. Plant-specific design features, such as common sensing lines for the water-level instrumentation, automatic initiation logic for vital protection systems, inhibition of vital protection systems, and additional single failures of safety-related and non-safety- related systems, were considered. The results, including the value impact analyses of the alternatives considered for plant improvements for BWR plant designs, are provided for information. Each addressee is expected to review the information to verify that the design of its facility has been correctly represented. It may also be prudent for some licensees to consider a reassess- ment of plant procedures and operator training to ensure that plant operators can readily detect and mitigate a leak or break of a sensing line.

No written response or specific action is required by this letter. Therefore, no clearance from the Office of Management and Budget is required.

If you have any questions on this matter, please contact the technical contact listed below or your project manager.

Sincerely, ORIGINAL SIGNED BY JAMES PARTLOW

James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure: List of Recently Issued NRC Generic Letters

Technical Contact:

Tim Collins, NRR

(301) 492-0897 Andrew J. Szukiewicz, RES

(301) 492-3914 DISTRIBUTION wfenclosure TErley. NRR JHSniezek, NRR FJMiraglia, NRR TSpeis, RES

JGPartlow, NRR CERossi, NRR CHBerlinger, NRR GBarber, NRR

PCWen, NRR JCalvo, NRR WDLanning, NRR FPGillespie, NRR

PDR Central Files DCS DOEA R/F

OGCB R/F X PWen R/F H.1)

  • SEE PR US CONCURftjC IES

tD/DOEA:NRR *C/OGCB:DOEA:NRR PPMB:ARMs

  • I

ADP/NR\ AD

JGP ftld FJMi!2 1 i ia CERossi CHBerlinger T echEd

06j /89 06t 89 061,2a89 06/12/89 06/07/89

  • OG~ :DOEA:NRR *EI :DSIR :RES *SRXB:DEST: :NRR *SAD/DEST:NRR *rAEOD 4 ADR

PCWen ASzukiewi I:z MWHodges AThadani J Conran t, Holahan

06/06/89 06/06/89 06/08/89 06/08/89 06/12/89 6/m3/89 A formal CRGR review an is not required per memo from E. Jordan to E. Beckjord,

.'ne

Template:GL-Nav