Category:Drawing
MONTHYEARML18249A1262018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures ML18249A1282018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML18249A1292018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A Figures ML18249A1352018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures. (Redacted) ML18249A1402018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures ML18249A1422018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures. (Redacted) ML18249A1432018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures ML18249A1452018-08-13013 August 2018 Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures ML18250A0092016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 15A, Figures ML18250A0042016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures ML18250A0052016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted) ML18250A0062016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML18250A0072016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Figures ML18250A0102016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 17A, Figures ML18250A0122016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML18250A0132016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Figures ML18250A0142016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2B, Figures ML18250A0162016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures (Redacted) ML18250A0182016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted) ML18250A0192016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures ML18250A0202016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures ML18250A0212016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Analog Channels for Engineered Safeguards Sensor Trip Inputs, Appendix 7B, Figures ML18250A0222016-08-11011 August 2016 Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures BSEP 13-0010, Attachment 1: Requested Drawings2013-01-21021 January 2013 Attachment 1: Requested Drawings ML1020304762010-07-20020 July 2010 Topographic Survey Stabilization Pond Area 185 Acres, 1 Through 7 RNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-12-17017 December 2008 Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RNP-RA/07-0016, Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.22007-02-22022 February 2007 Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.2 ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0223300802002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 6 of 6 ML0223300782002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 5 of 6 ML0223300752002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 4 of 6 ML0223300702002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Containment Flow Diagram. Sheet 3 of 6 ML0223300662002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 2 of 6 ML0223300612002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection Intake Structure Flow Diagram. Sheet 1 of 6 2018-08-13
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20034F2842020-02-0303 February 2020 Implementation of TSTF-564 - NRC Conference Call - February 5, 2020 ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan 2022-09-14
[Table view] |