Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702
ML15280A253
Person / Time
Site: Harris, Robinson  
Issue date: 11/25/2015
From: Martha Barillas
Plant Licensing Branch II
To:
Duke Energy Progress
Galvin D, NRR/DORL, 415-6256
Shared Package
ML15280A229 List:
References
CAC MF6701, CAC MF6702
Download: ML15280A253 (4)


Text

LICENSEE:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 25, 2015 Duke Energy Progress, Inc.

FACILITIES: Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2

SUBJECT:

SUMMARY

OF OCTOBER 5, 2015, MEETING WITH DUKE ENERGY PROGRESS, INC., TO DISCUSS FUEL RELOAD DESIGN METHODOLOGY REPORTS AND PROPOSED LICENSE AMENDMENT REQUEST REGARDING THE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, AND H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 (CAC NOS. MF6701 AND MF6702)

On October 5, 2015, a partially closed Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, Inc. (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss two fuel reload design methodology reports and a proposed license amendment request (LAR) regarding the Shearon Harris Nuclear Power Plant, Unit 1 (Harris), and H. B. Robinson Steam Electric Plant Unit No. 2 (Robinson). The meeting notice and agenda, dated September 18, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML15265A409. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML15261A600). During the meeting, the licensee discussed the two fuel reload design methodology reports to be used as part of the proposed fuel reload design calculations to be performed in-house for Harris and Robinson. The two reports are (1) DPC-NE-2010-A, "Nuclear Physics Methodology for Reload Design," and (2) DPC-NE-2011-P, "Core Operating Limits for Westinghouse Reactors." The licensee stated that both reports have been previously reviewed and approved by the NRC and have been applied at the McGuire Nuclear Station and Catawba Nuclear Station. The DPC-NE-2011-P report proposed LAR will include two methodology changes. The proposed LAR will include applicable technical specification changes for Harris and Robinson. The licensee also discussed the overall series of submittals concerning the licensee's fuel reload design methods and its request of approval date. The NRC staff informed the licensee that given the complexity of the reviews for the planned submittals, precedence has shown that topical reports typically require over a 12-month review schedule. The NRC staff and the licensee discussed each of the above topics, and the licensee indicated that it would consider NRC staff comments in the preparation of the LAR.

No regulatory decisions were made at the meeting. No members of the public were in attendance; no Public Meeting Feedback forms were received.

Please direct any inquiries to Dennis J. Galvin at 301-415-6256 or Dennis.Galvin@nrc.gov.

Docket Nos. 50-400 and 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv MY Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES OCTOBER 5, 2015, MEETING WITH DUKE ENERGY PROGRESS, INC.

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUEST REGARDING FUEL RELOAD DESIGN METHODOLOGY REPORTS AND TECHNICAL SPECIFICATION CHANGES U.S. Nuclear Regulatory Commission R. Anzalone M. Barillas D. Beacon J. Dean D. Galvin A. Hon J. Kaizer M. Panicker K. West*

Duke Energy Progress, Inc.

D. Bortz J. Due R. Harvey A. Zuremba

  • participated by phone Enclosure No regulatory decisions were made at the meeting. No members of the public were in attendance; no Public Meeting Feedback forms were received.

Please direct any inquiries to Dennis J. Galvin at 301-415-6256 or Dennis.Galvin@nrc.gov.

/RA/

Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-400 and 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMRobinson Resource RidsNrrPMShearonHarris Resource RidsNrrDssSnpb Resource RidsNrrLABClayton Resource CRosales-Cooper, OEDO RidsRgn2MailCenter Resource RidsNrrDorllpl2-2 Resource RidsACRS_MailCTR Resource RidsNrrDssStsb Resource MPanicker, NRR LWest, NRR RAnzalone, NRR TWertz, NRR LPL2-2 R/F DBeacon, NRR JKaizer, NRR DGalvin, NRR ADAMS A ccess1on N ML15280A253 P

k o.:

ac age ML15280A229

  • b
  • 1 1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SNPB/BC*

NAME DGalvin MBarillas BClayton JDean (LRonewicz for)

DATE 10/27/15 10/30/15 10/16/15 11/4/15 OFFICE DSS/STSB/BC*

DORL/LPL2-2/BC DORL/LPL2-2/PM NAME RElliott BBeasley MBarillas DATE 11/13/15 11/18/15 11/25/15 OFFICIAL RECORD COPY