ML17340A130

From kanterella
Jump to navigation Jump to search

Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson
ML17340A130
Person / Time
Site: Harris, Brunswick, Robinson  Duke Energy icon.png
Issue date: 12/22/2017
From: Dennis Galvin
Plant Licensing Branch II
To:
Duke Energy Progress
Galvin D, NRR/DORL/LPL1
References
EPID L-2017-LRM-0050
Download: ML17340A130 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: Duke Energy Progress, LLC FACILITY: Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)

On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR)

Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17319A257. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs.

The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed.

Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received.

Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.

Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261, 50-324, 50-325, and 50-400

Enclosure:

List of Attendees cc w/

Enclosure:

Distribution via Listserv

LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty

  • D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman
0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull
  • participated by phone Enclosure

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION:

PUBLIC RidsRgn2MailCenter RidsNrrLABClayton RidsNrrPMRobinson RidsNrrDorlLpl2-2 TWertz, NRR RidsNrrPMShearonHarris RidsACRS_MailCTR JBowen, OEDO RidsNrrPMBrunswick RidsNrrDraApla OYee, NRR RidsNrrDssSrxb RidsNrrDeEeob MBiro, NRR RidsNrrDmlrMvib SDinsmore, NRR FForsaty, NRR BHartle, NRR EMiller, NRR ARezai, NRR PSahay, NRR CSt. Peters, NRR PM Reading File RidsNrrDssStsb SRuffin, NRR RidsNrrDeEmib ADAMS Access1on No.: ML17254A349 *b v e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DRA/APLA/BC*

NAME DGalvin BClayton (LRonewicz for) SRosenberg DATE 12/12/2017 12/12/2017 12/14/2017 OFFICE NRR/DSS/STSB/BC(A)* NRR/DORL/LPL2-2/BC N RR/DORL/LPL2-2/PM NAME JWhitman UShoop DGalvin DATE 11/30/2017 12/22/2017 12/22/2017 OFFICIAL RECORD COPY