MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML1108908992011-03-30030 March 2011 Attendance List of 03/24/11 Meeting Regarding Annual Assessment of H.B. Robinson Steam Electric Plant ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004362005-03-24024 March 2005 NRC CY2004 Annual Assessment Meeting - Robinson - Hartsville, South Carolina, March 24, 2005 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0410600042004-03-30030 March 2004 Presentation of NRC CY2003 Annual Assessment Meeting for H.B. Robinson ML0403505052004-01-0707 January 2004 Meeting Handouts with Progress Energy to Discuss Fire Protection Initiatives ML0327203572003-09-25025 September 2003 Meeting Handout Materials for 09/25/03 Meeting to Discuss CP&L Request for Relaxation from the NRC Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at PWRs 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23087A2922023-04-12012 April 2023 2022 Annual Assessment Meeting ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22257A2392022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22151A2652022-05-31031 May 2022 Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML22007A2592022-02-0202 February 2022 Presubmittal Licensee Presentation for TS 3.5.3 PIV Testing LAR ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21174A3212021-06-24024 June 2021 Licensee Presentation for Robinson Presubmittal Meeting TSTF 577, Rev. 1 ML21167A0852021-06-24024 June 2021 Licensee Presentation for Robinson Pre-submittal Meeting TSTF-577 ML21105A7522021-04-15015 April 2021 2020 Robinson - EOC Presentation Slides ML21053A0472021-02-25025 February 2021 Duke Energy Pre-Submittal Meeting - February 25, 2021 - H. B. Robinson 3rd Interval Containment ISI Relief Request ML20132A0002020-05-11011 May 2020 EOC Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17244A2272017-09-0707 September 2017 Duke Energy Presentation - H.B. Robinson 2017-09-07 Pre-sub Transmission Upgrade Meeting ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML16105A3342016-04-20020 April 2016 H. B. Robinson Steam Electric Plant, Unit 2 - April 20, 2016, Duke Energy Presentation for 24-Month Fuel Cycle Pre-submittal Meeting (CAC No. MF7503) ML15231A6062015-08-19019 August 2015 Duke Energy Presentation - Robinson Nuclear Plant Transmission Upgrade Pre-submittal Meeting 08-26-2015 - MF6477 ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14181A0782014-06-30030 June 2014 June 30 NRC Slides for Public Meeting with Duke - NTTF 2.1 - Seismic Reevaluation - GMRS ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1124200662011-08-30030 August 2011 Meeting Summary - Robinson - NRC Slides ML1124200682011-08-30030 August 2011 Meeting Summary - Robinson - Progress Energy Slides ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1123603572011-08-24024 August 2011 Meeting Slides ML12083A0492011-07-20020 July 2011 Meeting Slides - Meeting with Carolina Power & Light Company to Discuss the H. B. Robinson Steam Electric Plant, Unit 2 Performance Improvement Plant and New Management ML1113703442011-05-11011 May 2011 05/11/2011 Meeting Slides Regarding Strategic Plan ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1108909072011-03-30030 March 2011 Slides of Meeting Regarding H.B. Robinson Annual Assessment Meeting ML1032006182010-11-16016 November 2010 Public Meeting Summary - Category One - Regulatory and Enforcement Conference Meeting (Robinson) ML1013904942010-05-12012 May 2010 Event Review for Robinson - Slides ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 ML0912706522009-05-0606 May 2009 Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0813706302008-05-0707 May 2008 Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0722100412007-07-26026 July 2007 Meeting Slides NRC Region Meeting Robinson Nuclear Plant. ML0716505352007-05-21021 May 2007 Enclosure - Slides for NRC CY2006 Annual Assessment Meeting ML0611402602006-04-0404 April 2006 Public Meeting Slides - Category One Management Meeting H. B. Robinson, Unit 2 ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides 2023-04-12
[Table view] |
Text
Duke Energy/NRC Pre-submittal Meeting: Robinson LAR to Adopt TSTF-577, Rev. 1 June 24, 2021
Duke Energy Attendees Art Zaremba (Manager, Nuclear Fleet Licensing)
Etienne Fonteneau (Manager, Steam Generator Programs Engineering)
Dan Mayes (Principal Engineer, Steam Generator Programs Engineering)
Jordan Vaughan (Lead Nuclear Engineer, Nuclear Fleet Licensing) 2 2
Agenda Introduction (Desired Meeting Outcomes)
License Amendment Request Overview Justification for Technical Variation from TSTF-577 Timeline for LAR Submittal/Closing Remarks 3
License Amendment Request Based on TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Existing Robinson Technical Specifications requirements are based on TSTF-510 Robinson steam generators (SGs) have Alloy 600 thermally treated tubes Propose to credit the 100% inspection of all SGs in December 2020 as the initial inspection in the first inspection period for Robinson For the proposed change, the initial inspection period began December 8, 2020 Technical Variation from TSTF-577:
TSTF-577 provides a 54 effective full power months (EFPM) inspection period; if no cracking has been experienced except for portions of the tube that are exempt AND the SG inspection was performed using enhanced probes, then a 72 EFPM may be applied 100% inspection of all 3 Robinson SGs in December 2020 did not use enhanced probes However, due to Robinson being on 24-month refueling cycles, Duke Energy is proposing a 72 EFPM inspection period for the period that began December 2020. 4 4
License Amendment Request Proposed Change (variation verbiage is bold/italicized):
After the first refueling outage following SG installation, inspect 100% of the tubes in each SG at least every 54 effective full power months, which defines the inspection period. If none of the SG tubes have ever experienced cracking other than in regions that are exempt from inspection by alternate repair criteria and the SG inspection was performed with enhanced probes, the inspection period may be extended to 72 effective full power months. Additionally, the inspection period that began December 8, 2020, may be 72 effective full power months without prior performance of a SG inspection using enhanced probes.
5 5
Justification for Technical Variation from TSTF-577 Robinson is a three loop plant with Westinghouse Model 44 F steam generators. The Alloy 600 TT tubes are 0.875 inch in diameter by 0.050 inch wall. The tube bundles were replaced in 1984 and have operated for 29.6 EFPY at the last inspection at EOC
- 32. Cycle 32 was 1.86 EFPY, the first nominal 24 month cycle The Thot is less than 605 degrees Fahrenheit in all loops.
The most recent EOC 32 inspection results are discussed in the inspection report (ADAMS Accession No. is ML21147A263)
The existing degradation mechanism are tube wear at anti-vibration bars (AVB),
support plate locations and a presumed foreign object.
None of the Robinson SG tubes have ever experienced cracking other than in regions that are exempt from inspection by the alternate repair criteria in Technical Specifications 6
Justification for Technical Variation from TSTF-577 Foreign Object Search and Retrieval (FOSAR) was performed in the in all three steam generators. There were six metallic objects identified. Two objects were removed, one (machine curl) was previously plugged around the identified tube during EOC 30, three were left in place as is and were evaluated. The wear evaluation concluded that the metallic objects can remain in the steam generator for 6 EFPY (three cycles) of operation.
The foreign material exclusion program is discussed Deposit loading is discussed The current operational assessment was projected for 6 EFPY or three cycles. The existing mechanisms considered in the operational assessment were tube wear from AVBs, broached and drill tube support plates and presumed foreign objects. All were projected deterministically.
No potential mechanisms were considered due to the low Thot.
There are 42 high stress tube remaining in service. In 2020, the data was rereviewed by Westinghouse, no additional tubes were identified. The EOC 32 inspection of the 42 tubes was performed full length with an array probe and no degradation was identified.
7
Justification for Technical Variation from TSTF-577 There are no administrative limits on primary to secondary leakage (mitigating strategies) planned for the proposed change. The Technical Specification primary to secondary leakage limit through any one steam generator is 75 gpd.
In conclusion, after 29.6 EFPY the tube degradation is minimal, predictable, and easily detected by the bobbin coil. Corrosion is not expected due to the low Thot. The existing degradation mechanisms have been projected deterministically to meet the structural and leakage performance criterion for three cycles or six EFPY or until the end of cycle 35.
Duke Energy is requesting 72 effective full power months without an enhanced probe inspection for the Robinson inspection period that began December 8, 2020 and finds that such a period is acceptable based on the low amount of degradation, the low Thot, the history of cracking in the Alloy 600 TT fleet, and projecting to meet the structural and leakage performance criterion deterministically for 6 EFPY for existing degradation mechanisms. 8
Closing Remarks Duke Energy targeting to submit Robinson TSTF-577 LAR by early August 2021 9
9