Category:Memoranda
MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22299A0212023-01-10010 January 2023 Memo to File - Robinson Final EA 2017, 2019, 2021 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22075A3592022-03-17017 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21145A0182021-05-25025 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regard the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 RA-21-0097, Notification of Permit Revision Request Regarding Copper and Zinc Limits2021-03-15015 March 2021 Notification of Permit Revision Request Regarding Copper and Zinc Limits IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20266G4412020-09-24024 September 2020 Insights Obtained from Review of Robinson Seismic Probabilistic Risk Assessment ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19254B4692019-09-0909 September 2019 (FEMA Letter NRC 09-09-19) Preliminary Capabilities Assessment - Brunswick Nuclear Power Plant ML19266A5332019-09-0909 September 2019 (FEMA Memo to NRC 9-9-19) Preliminary Capabilities Assessment - Brunswick Nuclear Plant ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18116A1082018-04-26026 April 2018 Summary of Meeting on Annual Assessment Public Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18074A0202018-03-20020 March 2018 Fpra FAQ 16-0011 Closure Memo ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML17129A3022017-05-17017 May 2017 Office of Nuclear Security and Incident Response Observation of 2017 Security Baseline Inspection at Brunswick Steam Electric Plant, Units 1 & 2 ML17096A3332017-05-0909 May 2017 Verbal Authorization of Relief Request for Reactor Vessel Closure Head Penetration Nozzle N9 Repair ML16300A1802016-10-27027 October 2016 Verbal Authorization of Relief Request I3R-16, for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program -Third 10-Year Interval ML16286A2372016-10-12012 October 2016 FEMA Assessment of Offsite Plans and Preparedness Post-Hurricane Matthew (October 2016) ML16138A0502016-05-24024 May 2016 Audit Report - Application For Amendment Shearon Harris Nuclear Power Plant, Unit 1 - The Proposed License Amendment Revises The As-Found Lift Setting Tolerance For Main Steam Line Code Safety Valves In Technical Specifications (TAC No. MF7195) ML16134A1552016-05-12012 May 2016 Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML16034A5082016-02-0404 February 2016 Audit Report; Brunswick Steam Electric Plant, Units 1 & 2 Nuclear Facility Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 (TAC No. MF5852) ML15342A2052016-01-0808 January 2016 Regulatory Audit in Support of License Amendment Request to Adopt NFPA 805 ML15303A3962015-12-0808 December 2015 Safety Evaluation Input on Emergency Action Level Scheme Upgrade for Brunswick Steam Electric Plant Units 1 and 2 (TAC No'S. MF5766 and MF5767 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15149A3222015-05-29029 May 2015 2014 Harris Annual Assessment Meeting Summary ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13330B6392013-11-27027 November 2013 Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year Interval ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC 2024-06-21
[Table view] |
Text
June 8, 2010 MEMORANDUM TO: Robert D. Carlson, Chief Financial Analysis Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Aaron L. Szabo, Financial Analyst /RA/
Financial Analysis Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
THE NUCLEAR REGULATORY COMMISSION STAFF SPOT-CHECK REVIEW OF PROGRESS ENERGY CAROLINAS OWNERSHIP INTEREST OF H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 AND SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 ON MAY 21, 2010 - FINDING OF NO POTENTIAL ISSUES IN BANK STATEMENTS Pursuant to SECY-07-0197, the Nuclear Regulatory Commission (NRC) staff has been instructed to perform Spot-checks on licensees to ensure that the amount reported to the NRC in the Decommissioning Funding Status (DFS) Report is equivalent to the amount the licensee has in their bank account, as of December 31 of the preceding year. After providing at least 10 days prior notice, the NRC Staff, on May 21, 2010, performed the Spot-check at 410 S.
Wilmington Street, Raleigh, North Carolina, where Progress Energy Carolina (Progress) holds/receives the original bank statements for H.B. Robinson Steam Electric Plant Unit 2 (Robinson 2), Brunswick Steam Electric Plant Units 1 and 2 (Brunswick 1 and 2), and Shearon Harris Nuclear Power Plant Unit 1 (Harris 1) from State Street Advisors.
After the NRC staffs Spot-check of Robinson 2, Brunswick 1 and 2, and Harris 1 at the location of the original bank statements, the NRC staff found no issues related to the amount reported to the NRC in the 2009 DFS Report and the stated amount in the bank statements dated December 31, 2008. The bank statements of Progress were divided between qualified bank accounts and non-qualified bank accounts. The total of all of the accounts was equivalent to the amount provided to the NRC in the 2009 DFS Report.
CONTACT: Aaron L. Szabo, NRR/DPR 301-415-1985
R. Carlson Because no issues were found in the NRC staffs Spot-check of Robinson 2, Brunswick 1 and 2, and Harris 1, this memo serves to close out the Spot-Check in relation to Progress ownership interest in the above-stated units.
Docket No(s). 50-261, 50-325, 50-324, 50-400
ML101590199 OFFICE NRR/DPR/PFAB NAME ASzabo DATE 6/8/2010