Slides from H. B. Robinson Meeting Re. Robinson Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - Cy 2007
ML081370630
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/07/2008
From:
NRC/RGN-II
To:
Shared Package
ML081370616 List:
References
Download: ML081370630 (18)


Text

H.B. Robinson Steam Electric Plant H.B. Robinson Steam Electric Plant Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Program Reactor Oversight Program -- CY 2007 CY 2007 Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region II Region II Hartsville, South Carolina Hartsville, South Carolina May 7, 2008 May 7, 2008

Purpose of Todays Meeting A public forum for discussion of Robinson A public forum for discussion of Robinsons s performance during 2007 performance during 2007 The NRC will report Robinson The NRC will report Robinsons performance as s performance as described in the annual assessment letter described in the annual assessment letter Robinson management will be given the opportunity Robinson management will be given the opportunity to respond to the annual assessment letter and inform to respond to the annual assessment letter and inform the NRC of their plans to maintain or improve their the NRC of their plans to maintain or improve their performance performance

Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions

Region II Organization Luis Reyes Regional Administrator Victor McCree Deputy Regional Administrator Len Wert Director of Reactor Projects Harold Christensen Deputy Director Randall Musser Branch Chief Robinson Resident Inspectors Bob Hagar Eddie Morris Sr. Project Engineer Gerald Wilson Kriss Kennedy Director of Reactor Safety Davis Ayres Acting Deputy Director Regional Specialists

NRC Representatives NRC Representatives

Len Wert, Director, Division Reactor Projects (404) 562-4500

Harold Christensen, Deputy Division Director, DRP (404) 562-4501

Marlayna Vaaler, Project Manager, NRR (301) 415-3178

Bob Hagar, Senior Resident Inspector (843) 383-4571

Eddie Morris, Resident Inspector (843) 383-4571

Gerald Wilson, Senior Project Engineer (404) 562-4613

Randall Musser, Branch Chief (404) 562-4603

NRC Strategic Goals Safety: Ensure adequate protection of the public health and safety and the environment Security: Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Thresholds Action Matrix Significance Thresholds Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections z Equipment Alignment

~80 hrs/yr z Triennial Fire Protection

~200 hrs every 3 yrs z Operator Response

~125 hrs/yr z Emergency Preparedness

~80 hrs/yr z Rad Release Controls

~110 hrs every 2 yrs z Worker Radiation Protection

~90 hrs/yr z Corrective Action Program

~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of ROP Results z Performance Indicator Results (at end of CY 2007)

Green 1942 White 8

Yellow 2

Red 0

z Total Inspection Findings (during CY 2007)

Green 759 White 9

Yellow 5

Red 0

National Summary of Plant Performance Status at End of CY 2007 Column in the Action Matrix

  1. of plants Licensee Response 87 Regulatory Response 8

Degraded Cornerstone 8

Multiple/Repetitive Degraded Cornerstone 1

Unacceptable 0

Total 104

Robinson Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2007)

Dec 31, 2007) 3,742 hours0.00859 days <br />0.206 hours <br />0.00123 weeks <br />2.82331e-4 months <br /> of inspection-related activities Resident inspector daily inspections Triennial Fire Protection In-service Inspection Radiation Protection Licensed Operator Initial Examinations Licensed Operator Requalification Examinations Emergency Preparedness Operational ISFSI Inspection TI-166 PWR Containment Sump Blockage Inspection Component Design Bases Inspection

Robinson Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2007)

Dec 31, 2007)

Eddie Morris reported to the site in July 2007 as the Resident Eddie Morris reported to the site in July 2007 as the Resident Inspector.

Inspector.

Robinson Assessment Results (Jan 1 - Dec 31, 2007)

All inspection findings were classified as very low safety significance (Green)

All performance indicators were Green.

Robinsons performance was within the Licensee Response Column of the NRCs Action Matrix.

Robinson Annual Assessment Summary January 1 - December 31, 2007 Progress Energy operated Robinson in a manner that Progress Energy operated Robinson in a manner that preserved public health and safety.

preserved public health and safety.

All cornerstone objectives were met.

All cornerstone objectives were met.

NRC plans baseline inspections for the remainder of NRC plans baseline inspections for the remainder of CY2008.

CY2008.

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z

General information or questions www.nrc.gov Select About NRC for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z

Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z

Public Document Room 1-800-397-4209 (Toll Free)