ML20141L628
| ML20141L628 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 05/20/2020 |
| From: | Adam Wilson NRC/RGN-II/DRP/RPB3 |
| To: | Randy Musser NRC/RGN-II/DRP/RPB3 |
| References | |
| MN 20200490 | |
| Download: ML20141L628 (3) | |
Text
May 20, 2020 MEMORANDUM TO:
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects FROM:
Adam A. Wilson, Project Engineer
/RA/
Reactor Projects Branch 3 Division of Reactor Projects
SUBJECT:
PUBLIC MEETING
SUMMARY
- ROBINSON STEAM ELECTRIC PLANT, DOCKET NO. 50-261, MEETING NUMBER 20200490 On May 13, 2020, the Nuclear Regulatory Commission (NRC) conducted an online virtual meeting concerning Robinson Steam Electric Plant. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2019 - December 31, 2019.
In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing the meeting was held remotely through the Skype for Business application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML20132A079), Assessment Meeting Presentation (ML20132A000).
The meeting was conducted from 3:00 PM to 3:45 PM local time. There were approximately 30 attendees. In summary, the attendees consisted of representatives from the NRC, Duke Energy, The State of South Carolina, and members of the public. Due to the nature of the meeting no official list of attendees is included. NRC staff were available for questions for 45 minutes. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. The meeting was listed in the Public Meeting Feedback System (PMFS) under Meeting Code 20200490 and upon submittal of this memo there were no public responses to the meeting.
Docket No.:
50-261 License No.: DPR-23 CONTACT: Adam A. Wilson, RII/DRP 404-997-4574