Responds to 860428 Request for Exemption from Fire Protection Requirements,Per 10CFR50.12.Although Technical Review Not Completed,Submittals Adequately Address Criteria. Request for Relief from 10CFR50.48 Cannot Be Acted Upon
ML20204C167
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/22/1986
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
TAC-54373, NUDOCS 8607310030
Download: ML20204C167 (3)


Text

. July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.

Therefore, no further information need be submitted at this time.

Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance. Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.

Sincerely, original si.gned by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page

, DISTRIBUTION:

EDocket Fileg WShields NRC PDR OGC Local POR FMiraglia SSPD Reading Edordan PNoonan BGrimes KHeitner JPartlow CHinson NThompson 0 Lynch ACRS (10) ,

HBerkow s

/ U,  ;

DP SSPD DPWRL- S PD DPWRL SPD D _RLVB:SSPD OG PW :SS.'D F KHeitner:cw CHinson ch WShields H8'e @ow OVff/86 07/ R/86 07/g/86 OLg%/86 07/ 07/L@86 07//f/86 8607310030 860722 DR ADOCK 0500 7

p" 'd UNITED STATES

, f '^

n NUCLF.AR REGULATORY COMMISSION

, g , g WASHINGTON, D. C. 20555 ti %9f/ / July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company I of Colorado i P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.

Therefore, no further information need be submitted at this time.

Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance.

Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.

Sincerely.

Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page

Mr. R. O. Williams D"k'ir tarvice Company of Colorado Fort St. Vrain cc:

"r. O. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Cc'orado Quality Assurance Division P. O. Box 840 Fort St. Vrain Nuclear Station uenver, colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building

.,cc.T. C00 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

. Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203