ML20203N646: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:p              .
f%
Commonwealth Edison
              "    :7 72 West Adams Street Chicago, Illinois Address Reply to: Post Ofhce Box 767-
            %j Chicago, Illinois 60690 0767 September 26, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
 
==Subject:==
Byron Station Units 1 and 2 Control Room Human Factors
)
NRC Docket Nos. 50-454 and 50-455
)
 
==Dear Mr. Dani.on:==
 
This is to inform you of the resolution of a human engineering deficiency (NED) in the Byron Units 1 and 2 control rooms. The HED involved the location of the range and volume controls for the source range nuclear ins;tru%entation channels. These controls have been relocated from the nuchwt instrumentation cabinet (2PM07J) to the main control board (2PM05J) of Bya Unit 2. Preoperational testing of the source range nuclear instrmentation channels with the relocated controls has been successfully completed on Syron Unit 2.
Sines testing of this modification on Byron Unit 2 has shown accept-able results, the same modification will be made on Byron Unit 1 prior to startup following the first refueling outage. This is in accordance with condition 2.C.7 of the Byron Unit 1 Facility Operating License NPF-37.
One signed original and fifteen copies of this letter are provided for NRC review.
Please direct any questions regarding this matter to this office.
Very truly yours, K. A. Ainger Nuclear Licensing Administrator 1m e
c'c: Byron Resident Inspector 0
2145K                                                                          0 8610090375 860926 PDR    ADOCK 05000454 P                          PDR w}}

Latest revision as of 04:40, 31 December 2020

Informs of Human Engineering Deficiency Re Location of Range & Vol Controls for Instrumentation Channels in Control Rooms.Controls Relocated to Unit 2 Main Control Board.Mods Will Be Made on Unit 1 Prior to Startup
ML20203N646
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/26/1986
From: Ainger K
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2145K, NUDOCS 8610090375
Download: ML20203N646 (1)


Text

p .

f%

Commonwealth Edison

" :7 72 West Adams Street Chicago, Illinois Address Reply to: Post Ofhce Box 767-

%j Chicago, Illinois 60690 0767 September 26, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Control Room Human Factors

)

NRC Docket Nos. 50-454 and 50-455

)

Dear Mr. Dani.on:

This is to inform you of the resolution of a human engineering deficiency (NED) in the Byron Units 1 and 2 control rooms. The HED involved the location of the range and volume controls for the source range nuclear ins;tru%entation channels. These controls have been relocated from the nuchwt instrumentation cabinet (2PM07J) to the main control board (2PM05J) of Bya Unit 2. Preoperational testing of the source range nuclear instrmentation channels with the relocated controls has been successfully completed on Syron Unit 2.

Sines testing of this modification on Byron Unit 2 has shown accept-able results, the same modification will be made on Byron Unit 1 prior to startup following the first refueling outage. This is in accordance with condition 2.C.7 of the Byron Unit 1 Facility Operating License NPF-37.

One signed original and fifteen copies of this letter are provided for NRC review.

Please direct any questions regarding this matter to this office.

Very truly yours, K. A. Ainger Nuclear Licensing Administrator 1m e

c'c: Byron Resident Inspector 0

2145K 0 8610090375 860926 PDR ADOCK 05000454 P PDR w