                                          MAY 311985
    ' Docket No. 50-456
      Commonwealth Edison Company
      ATTN: Mr. Cordell Reed
              Vice President
      Post Office Box 767
      Chicago, IL 60690
      Gentlemen:
      This refers to the routine safety inspection conducted by
      Messrs. D. L. Williams, A. Dunlop Jr. and M. J. Farber of this office on
      March 29 through May 10, 1985, of activities at Braidwood Nuclear Power Station
      authorized by NRC Constructicn Permit No. CPPR-132 and to the discussion of our-
      findings with Mr. H. A. Zimmerman at the conclusion of the inspection.
      The enclosed copy of our inspection report identifies areas examined during
      the inspection. Within these areas, the inspection consisted of a selective
      examination of procedures and representative records, observations, and
      interviews with personnel.
      No items of noncompliance with NRC requirements were identified during the        .
      course of this inspection.
      In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of
      this letter and the enclosure (s) will be placed in the NRC Public Document
      Room.
    8506040497 050531
    PDR    ADOCK 05000456
    O                    PM
                                                                                      ll{l
                                                                                  4do/
 
  ..
.
      Commonwealth Edison Company              2
                                                                      MAY 311985
      We will gladly discuss any questions-you have concerning this inspection.
                                                Sincerely,
                                                  .    ] ~gi i by~~g7J. llarriSON
                                                J. J. Harrison, Chief
                                                Engineering Branch
      Enclosure:
      Inspection. Report
        No. 50-456/85016
      cc w/ enclosure:
      D. L. Farrar, Director
        of Nuclear Licensing
    -M.  Wallace, Project Manager
      D. Shamblin, Construction
        Superintendent
      J. F. Gudac, Station
        Superintendent
      C. W. Schroeder, Licensing and
        Compliance Superintendent
      DMB/ Document Control Desk (RIDS)
      Resident Inspector, RIII
        Braidwood
      Resident Inspector, RIII Byron
    -Phyllis Dunton, Attorney
        General's Office, Environmental
        Control Division
      D. W. -Cassel, Jr. , Esq.
    ~J.  W. McCaffrey, Chief, Public
        Utilities Division
      H. S. Taylor, Quality Assurance
        Division
                        Dunlop  Ring
                                            y
                                        -ar aer Ptn ,e
                                                                (6"(            W
                                                                              rison
      Williams /cs                                        Little
      05/30/85                                                                  3l
}}
}}

Latest revision as of 08:55, 23 July 2020

Forwards Insp Rept 50-456/85-16 on 850329-0510.No Noncompliance Noted
ML20129A197
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/31/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20129A201 List:
References
NUDOCS 8506040497
Download: ML20129A197 (2)


See also: IR 05000329/2005010

Text

.

.

MAY 311985

' Docket No. 50-456

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by

Messrs. D. L. Williams, A. Dunlop Jr. and M. J. Farber of this office on

March 29 through May 10, 1985, of activities at Braidwood Nuclear Power Station

authorized by NRC Constructicn Permit No. CPPR-132 and to the discussion of our-

findings with Mr. H. A. Zimmerman at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the .

course of this inspection.

In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of

this letter and the enclosure (s) will be placed in the NRC Public Document

Room.

8506040497 050531

PDR ADOCK 05000456

O PM

ll{l

4do/

..

.

Commonwealth Edison Company 2

MAY 311985

We will gladly discuss any questions-you have concerning this inspection.

Sincerely,

. ] ~gi i by~~g7J. llarriSON

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection. Report

No. 50-456/85016

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

-M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

-Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. -Cassel, Jr. , Esq.

~J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

Dunlop Ring

y

-ar aer Ptn ,e

(6"( W

rison

Williams /cs Little

05/30/85 3l