MAY 311985
' Docket No. 50-456
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by
Messrs. D. L. Williams, A. Dunlop Jr. and M. J. Farber of this office on
March 29 through May 10, 1985, of activities at Braidwood Nuclear Power Station
authorized by NRC Constructicn Permit No. CPPR-132 and to the discussion of our-
findings with Mr. H. A. Zimmerman at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
.
course of this inspection.
In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of
this letter and the enclosure (s) will be placed in the NRC Public Document
Room.
8506040497 050531
ADOCK 05000456
ll{l
O
4do/
..
.
Commonwealth Edison Company
2
MAY 311985
We will gladly discuss any questions-you have concerning this inspection.
Sincerely,
] ~gi i by 7J. llarriSON
~~g
.
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection. Report
No. 50-456/85016
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
-M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Station
Superintendent
C. W. Schroeder, Licensing and
Compliance Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
-Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. -Cassel, Jr. , Esq.
~J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
y
(6"(
W
Williams /cs
Dunlop
Ring
-ar aer Ptn ,e
Little
rison
05/30/85