| number = ML20084F859
| number = ML20084F859
| issue date = 03/15/1984
| issue date = 03/15/1984
| title = Provides Info Re Actions Taken to Correct Violation 3.C.A Identified in 820624 Ltr Concerning IE Insp Repts 50-454/82-05 & 50-455/82-06.Sidewall Pressures Not Exceeded During Cable Pulling
| title = Provides Info Re Actions Taken to Correct Violation 3.C.A Identified in Concerning IE Insp Repts 50-454/82-05 & 50-455/82-06.Sidewall Pressures Not Exceeded During Cable Pulling
| author name = Tramm T
| author name = Tramm T
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 8145N, NUDOCS 8405040338
| document report number = 8145N, NUDOCS 8405040338
| title reference date = 06-24-1982
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
  .?-
* C' ;Commonwealth Edison
[        ) one First NabonIf Plaza Chicigo, Ilhnois
( C ~ ] Address Reply to: Post Othee Box 767 y/ Chicago, lihnois 60690                                                            g March 15, 1984.      g yyYp\    g ,3 y            ;
e , + ;/ ,      ./ .
bh          c    \/
Mr. James G. Keppler                                                        g[          pj *? '\. y Regional Administrator                                                      y gr          1 U.S. Nuclear Regulatory Commission                                          p/
N 799 Roosevelt Road Glen Ellyn, IL 60137
 
==Subject:==
Byron Generating Station Units              and 2 IE Inspection Report 50-454/82- 5 and 50-455/82-06 References (a):            {{letter dated|date=June 24, 1982|text=June 24, 1982 letter}} from C. E. Norelius to Cordell Reed.
(b):    {{letter dated|date=July 30, 1982|text=July 30, 1982 letter}} from W. L. Stiede to J. G. Keppler.
(c):    {{letter dated|date=September 22, 1982|text=September 22, 1982 letter}} from C. E. Norelius to Cordell Reed.
(d):    {{letter dated|date=November 5, 1982|text=November 5, 1982 letter}} from W. L. Stiede to J. G. Keppler.
(e):    {{letter dated|date=February 24, 1983|text=February 24, 1983 letter}} from W. L. Stiede to J. G. Keppler.
 
==Dear Mr. Keppler:==
 
Tnis is to provide information regarding actions taken to correct violation 3.C.A identified in reference (a). As indicated in reference (d), appropriate methods have been established to assure that allowable sidewall pressures are not exceeded during cable pulling operations.          In reviewing previously pulled cables, we found that several cables were pulled with tensions exceeding the recently established conservative limits.                The manufacturer's analysis of those several cables has now been completed.
As a result of our discussions with the cable manufacturer (Okonite), they submitted revised cable pulling criteria which were based on pull testing conducted in their laboratory. Using the revised criteria, the remaining questionable pull reports were reanalyzed. This analysis identified several cable installations which could not be verified acceptable based on the cable manufacturer's general pull criteria. The details of each such cable installation were forwarded to l
L UAR 161994 8405040338 840315 DR ADOCK 05000 Q  .
 
      ..e
. .a s
J. G. Keppler                                          March 15, 1984 l
i l
the cable manufacturer with a request that the manufacturer perform a specific analysis to determine acceptability of each cable pull. Based on the cable manufacturer's review, all of these suspect cable pulls were found to be acceptable.                                                    .
i                  The cable pull reports, analysis, calculations and other supporting documentation used in responding to these inspection reports 4        are available for NRC review.
Please address further questions regarding this matter to this Very truly yours, I
I      i Ah-      -
T. R. Tramm l
Nuclear Licensing Administrator 4
1m i
f J
I 8145N
_}}

Latest revision as of 01:49, 26 September 2022

Provides Info Re Actions Taken to Correct Violation 3.C.A Identified in Concerning IE Insp Repts 50-454/82-05 & 50-455/82-06.Sidewall Pressures Not Exceeded During Cable Pulling
ML20084F859
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/15/1984
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
8145N, NUDOCS 8405040338
Download: ML20084F859 (2)


Text

.

.?-

  • C' ;Commonwealth Edison

[ ) one First NabonIf Plaza Chicigo, Ilhnois

( C ~ ] Address Reply to: Post Othee Box 767 y/ Chicago, lihnois 60690 g March 15, 1984. g yyYp\ g ,3 y  ;

e , + ;/ , ./ .

bh c \/

Mr. James G. Keppler g[ pj *? '\. y Regional Administrator y gr 1 U.S. Nuclear Regulatory Commission p/

N 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units and 2 IE Inspection Report 50-454/82- 5 and 50-455/82-06 References (a): June 24, 1982 letter from C. E. Norelius to Cordell Reed.

(b): July 30, 1982 letter from W. L. Stiede to J. G. Keppler.

(c): September 22, 1982 letter from C. E. Norelius to Cordell Reed.

(d): November 5, 1982 letter from W. L. Stiede to J. G. Keppler.

(e): February 24, 1983 letter from W. L. Stiede to J. G. Keppler.

Dear Mr. Keppler:

Tnis is to provide information regarding actions taken to correct violation 3.C.A identified in reference (a). As indicated in reference (d), appropriate methods have been established to assure that allowable sidewall pressures are not exceeded during cable pulling operations. In reviewing previously pulled cables, we found that several cables were pulled with tensions exceeding the recently established conservative limits. The manufacturer's analysis of those several cables has now been completed.

As a result of our discussions with the cable manufacturer (Okonite), they submitted revised cable pulling criteria which were based on pull testing conducted in their laboratory. Using the revised criteria, the remaining questionable pull reports were reanalyzed. This analysis identified several cable installations which could not be verified acceptable based on the cable manufacturer's general pull criteria. The details of each such cable installation were forwarded to l

L UAR 161994 8405040338 840315 DR ADOCK 05000 Q .

..e

. .a s

J. G. Keppler March 15, 1984 l

i l

the cable manufacturer with a request that the manufacturer perform a specific analysis to determine acceptability of each cable pull. Based on the cable manufacturer's review, all of these suspect cable pulls were found to be acceptable. .

i The cable pull reports, analysis, calculations and other supporting documentation used in responding to these inspection reports 4 are available for NRC review.

Please address further questions regarding this matter to this Very truly yours, I